KitLog pro

Powered By Kitlog Pro v2.0

My Lancair -N992BC IVP Garrett
Work Logs Found: 175
Category Work Time: 2546 Hours
 Date
Hours
Work Log Summary

Details

 09-27-2006
8.00
LH wintip landing light
Details
       

 09-27-2006
5.50
final bodywork on wings, prepped for priming
Details
       

 09-26-2006
8.00
RH & LH landing lights
Details
       

 09-26-2006
5.50
fill & sand RH wing top & bottom
Details
       

 09-25-2006
5.50
sand, fill fair LH wing bottom
Details
     

 09-25-2006
8.00
RH landing light
Details
       

 09-23-2006
5.50
landing light
Details
       

 09-21-2006
8.00
wingtip landing light
Details
       

 09-20-2006
7.50
finished aileron bodywork, started landing lights
Details
       

 09-19-2006
5.50
LH & RH wings fill & fair
Details
       

 09-19-2006
8.00
bodywork bottoms of ailerons flat
Details
     

 09-18-2006
5.50
final sanding of LH wing top for contour
Details

 09-18-2006
8.00
filled aileron cusps w/ laminates
Details

 09-16-2006
5.50
fair & fill LH & RH wings
Details

 09-16-2006
56.00
fair & fill both wings
Details

 09-15-2006
8.00
spot fill rudder, laminated LE on wings
Details

 09-15-2006
5.50
body work on RH wing, laminated LH iwng
Details

 09-14-2006
5.50
laminated LH & RH wing leading edges on bottom of
Details

 09-14-2006
8.00
finish & fill on rudder, laminates on RH wing to c
Details

 09-13-2006
7.50
filled & sanded rudder
Details
     

 09-13-2006
4.50
body work on wings
Details
       

 09-12-2006
5.50
removed door, removed wings, bodywork on lower sur
Details
       

 09-12-2006
5.50
finished LH side of rudder, sanded under side of w
Details
       

 09-11-2006
5.50
laminate rear bulkhead, trial fit door identify bo
Details
       

 09-11-2006
8.00
finished evaporator re-installation finished bodyw
Details
       

 09-08-2006
8.00
nutplates on passenger seat bulkhead, installed up
Details
       

 09-08-2006
5.50
fitted upper fuselage along seam w/ vert. stab., s
Details
       

 09-07-2006
5.50
meeting w/ M Custard, filled to fair RH wing top-
Details
     

 09-07-2006
7.50
fitting & bodywork on rudder, nutplates on passeng
Details
       

 09-06-2006
8.00
sanded rudder for clearance, re-set clearance of r
Details
       

 09-06-2006
5.50
fill/fair LH wing upper de-ice cuff & wing root
Details
       

 09-05-2006
5.50
sand/fill LH top leading edge of wing for de-ice c
Details
       

 09-05-2006
7.00
finished tail position/strobe light installation,
Details
       

 09-01-2006
7.50
finished rudder trim tab, started rudder position
Details
       

 09-01-2006
5.00
filled to fair wing & horizontal stab fillets, beg
Details
       

 08-31-2006
6.50
laminted close out to rudder trim tab, bonded trim
Details
       

 08-31-2006
5.50
filled to fair vert stab w/ micro, laminated tail
Details
       

 08-30-2006
5.50
fill to fair vert stab w/ micro
Details
       

 08-30-2006
6.00
closeouts on rudder trim tab, fabricated fairing f
Details
       

 08-29-2006
5.50
surface work on vert stab
Details
       

 08-29-2006
8.00
fit rudder trim tab actuator arm, formed foam lead
Details
       

 08-28-2006
5.00
create fillets to wing root fairing leading edge,
Details
       

 08-28-2006
6.00
continued work on rudder trim tab
Details
       

 08-26-2006
5.50
rudder trim tab fabrication continues
Details
       

 08-25-2006
7.50
began construction of rudder trim tab
Details
       

 08-24-2006
8.00
applied closeout laminates to rudder, finished LH
Details
       

 08-23-2006
8.00
sanded trailing & leading edges of LH & RH wing wh
Details
       

 08-23-2006
5.50
finished rudder closeout gap, fit drill & counters
Details
       

 08-22-2006
8.00
cut out access panel at top of vertical & installe
Details
       

 08-21-2006
8.00
enlarged holes for rudder p/p tubes, fabricated ru
       

 08-19-2006
4.50
removed peel ply from de-icing cuff, laminated LE
Details
       

 08-18-2006
8.00
removed bonding clamps & laminated 2 BID to RH win
Details
     

 08-18-2006
5.50
prep sand & microfill rudder RH half, worked assis
Details

 08-17-2006
8.00
set up & completed RH wing de-icing cuff TE bondin
Details
       

 08-17-2006
5.50
close out rudder LE laminates, bonded RH wing de-i
Details

 08-16-2006
8.00
removed LH wind de-ice clamps, cleaned up area, la
Details
       

 08-16-2006
5.50
installed access plates for rudder bull-nose, prep
Details
       

 08-15-2006
8.00
installed LH elevator access panel, bonded LH wing
Details
       

 08-15-2006
5.50
fit check & cleco rudder closeout, bonded TE of LH
Details
     

 08-14-2006
8.00
finished fuel covers, prepped for de-ice cuff bond
Details
       

 08-14-2006
5.50
cut rudder free & trim rudder leading edge closeou
Details
       

 08-12-2006
16.00
trimmed fuel line covers, installed LH vert stabe
Details
       

 08-11-2006
13.00
installed pitch & yaw a/p servos assoc. electroni
Details
       

 08-11-2006
7.50
created mold for fuel line cover ahead of rear sea
Details
     

 08-10-2006
7.50
installation of yaw damper & pitch a/p servos,
Details
       

 08-10-2006
7.50
finished passenger seat bottom, cut pre-lam for bu
Details
       

 08-10-2006
3.00
blueprinted & finalized wing control surface hardw
Details

 08-09-2006
8.00
started installation of pitch & yaw servos for a/p
Details
       

 08-09-2006
8.00
finished rear seat bottom installation w/ gap seal
Details
       

 08-08-2006
6.00
released carbon gap seals from fuselage, trimmed &
Details
       

 08-08-2006
3.00
mount, troubleshoot and evaluate ailerons & flaps,
Details
       

 08-08-2006
6.00
fab pressurization valve vent line, installed elev
Details
       

 08-07-2006
8.00
trimmed rear seat bottom flange, filled hole edge
Details
       

 08-07-2006
2.00
prepared "hit list" for moving forward
Details

 08-07-2006
8.00
applied release tape layers to fuselage sides, lam
Details
       

 08-05-2006
3.50
trimmed passenger seat bottom flange, finished 4 B
Details
       

 08-04-2006
4.50
secured hyd. lines, installed EZ points, torque st
Details
       

 08-04-2006
6.00
nutplates installed on passenger seat bottom, prep
Details
       

 08-03-2006
7.00
phenolic hardpoint in seat bottom, created & insta
Details
       

 08-03-2006
5.50
installed power strip behind wheel well, installed
Details
       

 08-03-2006
3.50
install Adel clamps, plan & prepare for wire runs,
Details
       

 08-02-2006
4.00
installed EZ points for Adel clamp locatoins, inst
Details
       

 08-02-2006
8.00
created 4 BID fiberglass channel, made flange on h
Details
       

 08-02-2006
8.00
changed access from rear seat bottom by filling in
Details
       

 08-01-2006
5.00
installed hard points in hat rack & baggage floor
Details
       

 08-01-2006
5.00
installed baggage floor nutplates, cut & tested sh
Details
       

 08-01-2006
5.50
installed a/c dryer, prepared for de-ice leading e
Details
       

 07-31-2006
8.00
laminated "hat rack" flanges for baggage bulkhead,
Details
       

 07-31-2006
8.00
installed nutplates in baggage floor panel, made c
Details
       

 07-31-2006
5.50
installed evaporator mount to upper seat bulkhead,
Details
     

 07-29-2006
3.50
installed AOA sensor in RH wingtip
Details
       

 07-28-2006
10.50
wingtip lights fit & finish
Details
       

 07-28-2006
5.50
trimmed & fit back seat press. bulkhead, trimmed &
Details
       

 07-28-2006
5.50
located & drilled mounting holes for nose gear gas
Details
       

 07-27-2006
5.00
worked on wingtip items, started working on baggag
Details
       

 07-27-2006
8.50
removed engine from crate, installed new engine mo
Details
       

 07-27-2006
5.50
fit brake cylinders, fab & fit tip lights & lens
Details
       

 07-26-2006
10.00
prep sanded and installed both LH & RH leading edg
Details
       

 07-25-2006
16.00
setup and dry-run on LH & RH leading edge cuff
Details
       

 07-25-2006
7.00
finished inside window sanding, bodywork door fram
Details
       

 07-24-2006
8.00
finished sanding around all inside windows, remove
Details
       

 07-24-2006
6.00
finished aft de-ice box installation, got ready to
Details
       

 07-24-2006
6.00
completed rudder cable installation
Details
       

 07-22-2006
5.50
hooked up rudder cables at bellcrank, installed af
Details
       

 07-21-2006
10.00
prepped de-icing leading edges, prepped wing by sa
Details
       

 07-21-2006
8.00
finish sanding on upper fuselage half & baggage do
Details
       

 07-20-2006
8.00
reinstalled fine line tape around windows, sanded
Details
       

 07-20-2006
4.50
leveled ailerons & flaps, installed wing tips, che
Details
       

 07-20-2006
8.00
installed conduit & wiring for tail, sanded area f
Details
       

 07-19-2006
8.50
prepped and sprayed primer to upper fuselage half
Details
       

 07-19-2006
8.00
installed flaps & alerons to wing, installed contr
Details
       

 07-19-2006
8.00
finished rudder trim servo, installed potential NA
Details
       

 07-18-2006
16.00
finished body work on fuselage upper half and wind
Details
     

 07-18-2006
7.00
final fab of rudder trim servo installation, eleva
Details
       

 07-18-2006
4.00
elevator p/p tube fab, rudder p/p tubes lengths de
Details
       

 07-17-2006
8.00
made carbon pre cured laminate for rudder trim cov
Details
       

 07-17-2006
14.50
bodywork fuselage upper half in preparation for pr
Details
       

 07-15-2006
5.00
covered all holes in exterior of fuselage w/ carbo
Details
       

 07-14-2006
16.00
sanded laminates around outside windows, laminated
Details
       

 07-14-2006
13.50
located LH elevator insp. cover, laminated for rei
Details
       

 07-13-2006
5.00
sanded outside of windows/windscreen on fuselage
Details
       

 07-13-2006
14.00
installed nutplates for inspection cover, drilled
Details
       

 07-13-2006
9.50
finished with rework on inside windows, laminaed a
Details
       

 07-12-2006
12.00
tail inspection panel laminates, laminates over RH
Details
       

 07-12-2006
8.00
finished rework of interior windows
Details
       

 07-11-2006
10.00
laminated around bulkhead elevator p/p tubes, lami
Details
       

 07-11-2006
7.00
fixed upper fuselage windows/windscreen delaminati
Details
       

 07-10-2006
7.50
finished sanding outside of windows, removed blue
Details
       

 07-10-2006
12.50
finalized RH vertical stab placement, checked alig
Details
       

 07-07-2006
7.00
sanded & applied micro to bevel around windows, st
Details
       

 07-07-2006
10.50
marked and trimmed inbd. edge of both elevator hal
Details
       

 07-06-2006
7.50
sign strip windows
Details
       

 07-06-2006
16.00
set up RH vertical fin to proper position, install
Details
       

 07-05-2006
11.00
re-leveled fuselage, marked accurate centerline on
Details
       

 07-05-2006
5.00
assembled internal rudder bellcrank, trimmed fusel
Details
       

 07-03-2006
6.00
prep sanded fuselage for vertical, fabricated & in
Details
       

 06-30-2006
22.00
laminated all areas around horizontal stab to fuse
Details
       

 06-28-2006
10.00
finished horizontal stab incidence & placement, hy
Details
     

 06-27-2006
13.50
leveled fuselage/wing, began leveling & positionin
Details
       

 06-26-2006
11.00
unload kit, jacked up fuselage, retracted gear, in
Details
     

 06-26-2006
35.00
fuselage leveled using previous references and wat
Details
       

 05-08-2006
52.00
Pack in TN, Drive to to AZ
Details

 03-22-2006
90.00
Winglets/fuel system/center console/pedestal
Details
       

 01-07-2006
60.00
Hydraulics and fuel system
Details
       

 11-09-2005
55.00
Butt cheeks mounted, Baggage floor. rear hydrauli
Details
       

 10-31-2005
68.00
labor 10/05

 10-15-2005
65.00
Top, belly tank
Details
       

 09-30-2005
21.25
labor for 9/05

 08-20-2005
46.00
Pressure bulked with fast build up/lowe mounts
Details
       

 06-22-2005
80.00
Belly Tank
Details
       

 05-19-2005
72.00
Ailerons/flaps/gear door-well
Details
       

 05-03-2005
60.00
labor for 4/05

 04-23-2005
80.00
WIng fillets, aileron travel, body work, gear door
Details
       

 03-05-2005
23.50
labor for 3/05

 02-01-2005
60.00
Gear doors elevator
Details

 01-11-2005
10.00
Flaps/bell cranks DL's time

 01-03-2005
5.00
Labor on kit 12/04

 12-02-2004
15.00
Unpack, check for damage, inventory

 11-05-2004
10.00
Packing crating sorting

 11-04-2004
36.00
CLose out boxes, wing fillets, door fit , micro/re
       

 11-03-2004
36.00
pressure checked wings, fixed leaks, H stab travel
     

 11-02-2004
36.00
wing fillets, rudder pedals, close out boxes
       

 11-01-2004
36.00
retract step, press door mount/glue , wing fillets
       

 10-31-2004
20.00
gear doors wing fillets gear door close-outs
     

 10-30-2004
20.00
wing fillets/ push rod tubes/ mated wings 1st time
       

 10-29-2004
36.00
body worked elevator/worked on press door

 10-28-2004
36.00
Glue in windows/ gear doors trim and hinge
       

 10-27-2004
36.00
Fit and trim top/ gear doors cont.
       

 10-26-2004
36.00
Prepped windows and top for mating
       

 10-25-2004
36.00
Close starboard wing / close elvator
       

 10-22-2004
36.00
Close port wing
       

 10-21-2004
36.00
Close elevator /close H stab
       

 10-20-2004
36.00
Fuel filler / weight in elevator
       

 10-19-2004
36.00
H stab/ wing prep

 10-18-2004
36.00
Inventory, Prepped wings/elevator Hstab prep
       










Copyright © 2001-2024 Matronics. All Rights Reserved.