Date
|
Hours
|
Work Log Summary
|
Details
|
09-27-2006
|
8.00
|
LH wintip landing light
|
Details
|
|
|
09-27-2006
|
5.50
|
final bodywork on wings, prepped for priming
|
Details
|
|
|
09-26-2006
|
8.00
|
RH & LH landing lights
|
Details
|
|
|
09-26-2006
|
5.50
|
fill & sand RH wing top & bottom
|
Details
|
|
|
09-25-2006
|
5.50
|
sand, fill fair LH wing bottom
|
Details
|
|
|
09-25-2006
|
8.00
|
RH landing light
|
Details
|
|
|
09-23-2006
|
5.50
|
landing light
|
Details
|
|
|
09-21-2006
|
8.00
|
wingtip landing light
|
Details
|
|
|
09-20-2006
|
7.50
|
finished aileron bodywork, started landing lights
|
Details
|
|
|
09-19-2006
|
5.50
|
LH & RH wings fill & fair
|
Details
|
|
|
09-19-2006
|
8.00
|
bodywork bottoms of ailerons flat
|
Details
|
|
|
09-18-2006
|
5.50
|
final sanding of LH wing top for contour
|
Details
|
|
|
09-18-2006
|
8.00
|
filled aileron cusps w/ laminates
|
Details
|
|
|
09-16-2006
|
5.50
|
fair & fill LH & RH wings
|
Details
|
|
|
09-16-2006
|
56.00
|
fair & fill both wings
|
Details
|
|
|
09-15-2006
|
8.00
|
spot fill rudder, laminated LE on wings
|
Details
|
|
|
09-15-2006
|
5.50
|
body work on RH wing, laminated LH iwng
|
Details
|
|
|
09-14-2006
|
5.50
|
laminated LH & RH wing leading edges on bottom of
|
Details
|
|
|
09-14-2006
|
8.00
|
finish & fill on rudder, laminates on RH wing to c
|
Details
|
|
|
09-13-2006
|
7.50
|
filled & sanded rudder
|
Details
|
|
|
09-13-2006
|
4.50
|
body work on wings
|
Details
|
|
|
09-12-2006
|
5.50
|
removed door, removed wings, bodywork on lower sur
|
Details
|
|
|
09-12-2006
|
5.50
|
finished LH side of rudder, sanded under side of w
|
Details
|
|
|
09-11-2006
|
5.50
|
laminate rear bulkhead, trial fit door identify bo
|
Details
|
|
|
09-11-2006
|
8.00
|
finished evaporator re-installation finished bodyw
|
Details
|
|
|
09-08-2006
|
8.00
|
nutplates on passenger seat bulkhead, installed up
|
Details
|
|
|
09-08-2006
|
5.50
|
fitted upper fuselage along seam w/ vert. stab., s
|
Details
|
|
|
09-07-2006
|
5.50
|
meeting w/ M Custard, filled to fair RH wing top-
|
Details
|
|
|
09-07-2006
|
7.50
|
fitting & bodywork on rudder, nutplates on passeng
|
Details
|
|
|
09-06-2006
|
8.00
|
sanded rudder for clearance, re-set clearance of r
|
Details
|
|
|
09-06-2006
|
5.50
|
fill/fair LH wing upper de-ice cuff & wing root
|
Details
|
|
|
09-05-2006
|
5.50
|
sand/fill LH top leading edge of wing for de-ice c
|
Details
|
|
|
09-05-2006
|
7.00
|
finished tail position/strobe light installation,
|
Details
|
|
|
09-01-2006
|
7.50
|
finished rudder trim tab, started rudder position
|
Details
|
|
|
09-01-2006
|
5.00
|
filled to fair wing & horizontal stab fillets, beg
|
Details
|
|
|
08-31-2006
|
6.50
|
laminted close out to rudder trim tab, bonded trim
|
Details
|
|
|
08-31-2006
|
5.50
|
filled to fair vert stab w/ micro, laminated tail
|
Details
|
|
|
08-30-2006
|
5.50
|
fill to fair vert stab w/ micro
|
Details
|
|
|
08-30-2006
|
6.00
|
closeouts on rudder trim tab, fabricated fairing f
|
Details
|
|
|
08-29-2006
|
5.50
|
surface work on vert stab
|
Details
|
|
|
08-29-2006
|
8.00
|
fit rudder trim tab actuator arm, formed foam lead
|
Details
|
|
|
08-28-2006
|
5.00
|
create fillets to wing root fairing leading edge,
|
Details
|
|
|
08-28-2006
|
6.00
|
continued work on rudder trim tab
|
Details
|
|
|
08-26-2006
|
5.50
|
rudder trim tab fabrication continues
|
Details
|
|
|
08-25-2006
|
7.50
|
began construction of rudder trim tab
|
Details
|
|
|
08-24-2006
|
8.00
|
applied closeout laminates to rudder, finished LH
|
Details
|
|
|
08-23-2006
|
8.00
|
sanded trailing & leading edges of LH & RH wing wh
|
Details
|
|
|
08-23-2006
|
5.50
|
finished rudder closeout gap, fit drill & counters
|
Details
|
|
|
08-22-2006
|
8.00
|
cut out access panel at top of vertical & installe
|
Details
|
|
|
08-21-2006
|
8.00
|
enlarged holes for rudder p/p tubes, fabricated ru
|
|
|
|
08-19-2006
|
4.50
|
removed peel ply from de-icing cuff, laminated LE
|
Details
|
|
|
08-18-2006
|
8.00
|
removed bonding clamps & laminated 2 BID to RH win
|
Details
|
|
|
08-18-2006
|
5.50
|
prep sand & microfill rudder RH half, worked assis
|
Details
|
|
|
08-17-2006
|
8.00
|
set up & completed RH wing de-icing cuff TE bondin
|
Details
|
|
|
08-17-2006
|
5.50
|
close out rudder LE laminates, bonded RH wing de-i
|
Details
|
|
|
08-16-2006
|
8.00
|
removed LH wind de-ice clamps, cleaned up area, la
|
Details
|
|
|
08-16-2006
|
5.50
|
installed access plates for rudder bull-nose, prep
|
Details
|
|
|
08-15-2006
|
8.00
|
installed LH elevator access panel, bonded LH wing
|
Details
|
|
|
08-15-2006
|
5.50
|
fit check & cleco rudder closeout, bonded TE of LH
|
Details
|
|
|
08-14-2006
|
8.00
|
finished fuel covers, prepped for de-ice cuff bond
|
Details
|
|
|
08-14-2006
|
5.50
|
cut rudder free & trim rudder leading edge closeou
|
Details
|
|
|
08-12-2006
|
16.00
|
trimmed fuel line covers, installed LH vert stabe
|
Details
|
|
|
08-11-2006
|
13.00
|
installed pitch & yaw a/p servos assoc. electroni
|
Details
|
|
|
08-11-2006
|
7.50
|
created mold for fuel line cover ahead of rear sea
|
Details
|
|
|
08-10-2006
|
7.50
|
installation of yaw damper & pitch a/p servos,
|
Details
|
|
|
08-10-2006
|
7.50
|
finished passenger seat bottom, cut pre-lam for bu
|
Details
|
|
|
08-10-2006
|
3.00
|
blueprinted & finalized wing control surface hardw
|
Details
|
|
|
08-09-2006
|
8.00
|
started installation of pitch & yaw servos for a/p
|
Details
|
|
|
08-09-2006
|
8.00
|
finished rear seat bottom installation w/ gap seal
|
Details
|
|
|
08-08-2006
|
6.00
|
released carbon gap seals from fuselage, trimmed &
|
Details
|
|
|
08-08-2006
|
3.00
|
mount, troubleshoot and evaluate ailerons & flaps,
|
Details
|
|
|
08-08-2006
|
6.00
|
fab pressurization valve vent line, installed elev
|
Details
|
|
|
08-07-2006
|
8.00
|
trimmed rear seat bottom flange, filled hole edge
|
Details
|
|
|
08-07-2006
|
2.00
|
prepared "hit list" for moving forward
|
Details
|
|
|
08-07-2006
|
8.00
|
applied release tape layers to fuselage sides, lam
|
Details
|
|
|
08-05-2006
|
3.50
|
trimmed passenger seat bottom flange, finished 4 B
|
Details
|
|
|
08-04-2006
|
4.50
|
secured hyd. lines, installed EZ points, torque st
|
Details
|
|
|
08-04-2006
|
6.00
|
nutplates installed on passenger seat bottom, prep
|
Details
|
|
|
08-03-2006
|
7.00
|
phenolic hardpoint in seat bottom, created & insta
|
Details
|
|
|
08-03-2006
|
5.50
|
installed power strip behind wheel well, installed
|
Details
|
|
|
08-03-2006
|
3.50
|
install Adel clamps, plan & prepare for wire runs,
|
Details
|
|
|
08-02-2006
|
4.00
|
installed EZ points for Adel clamp locatoins, inst
|
Details
|
|
|
08-02-2006
|
8.00
|
created 4 BID fiberglass channel, made flange on h
|
Details
|
|
|
08-02-2006
|
8.00
|
changed access from rear seat bottom by filling in
|
Details
|
|
|
08-01-2006
|
5.00
|
installed hard points in hat rack & baggage floor
|
Details
|
|
|
08-01-2006
|
5.00
|
installed baggage floor nutplates, cut & tested sh
|
Details
|
|
|
08-01-2006
|
5.50
|
installed a/c dryer, prepared for de-ice leading e
|
Details
|
|
|
07-31-2006
|
8.00
|
laminated "hat rack" flanges for baggage bulkhead,
|
Details
|
|
|
07-31-2006
|
8.00
|
installed nutplates in baggage floor panel, made c
|
Details
|
|
|
07-31-2006
|
5.50
|
installed evaporator mount to upper seat bulkhead,
|
Details
|
|
|
07-29-2006
|
3.50
|
installed AOA sensor in RH wingtip
|
Details
|
|
|
07-28-2006
|
10.50
|
wingtip lights fit & finish
|
Details
|
|
|
07-28-2006
|
5.50
|
trimmed & fit back seat press. bulkhead, trimmed &
|
Details
|
|
|
07-28-2006
|
5.50
|
located & drilled mounting holes for nose gear gas
|
Details
|
|
|
07-27-2006
|
5.00
|
worked on wingtip items, started working on baggag
|
Details
|
|
|
07-27-2006
|
8.50
|
removed engine from crate, installed new engine mo
|
Details
|
|
|
07-27-2006
|
5.50
|
fit brake cylinders, fab & fit tip lights & lens
|
Details
|
|
|
07-26-2006
|
10.00
|
prep sanded and installed both LH & RH leading edg
|
Details
|
|
|
07-25-2006
|
16.00
|
setup and dry-run on LH & RH leading edge cuff
|
Details
|
|
|
07-25-2006
|
7.00
|
finished inside window sanding, bodywork door fram
|
Details
|
|
|
07-24-2006
|
8.00
|
finished sanding around all inside windows, remove
|
Details
|
|
|
07-24-2006
|
6.00
|
finished aft de-ice box installation, got ready to
|
Details
|
|
|
07-24-2006
|
6.00
|
completed rudder cable installation
|
Details
|
|
|
07-22-2006
|
5.50
|
hooked up rudder cables at bellcrank, installed af
|
Details
|
|
|
07-21-2006
|
10.00
|
prepped de-icing leading edges, prepped wing by sa
|
Details
|
|
|
07-21-2006
|
8.00
|
finish sanding on upper fuselage half & baggage do
|
Details
|
|
|
07-20-2006
|
8.00
|
reinstalled fine line tape around windows, sanded
|
Details
|
|
|
07-20-2006
|
4.50
|
leveled ailerons & flaps, installed wing tips, che
|
Details
|
|
|
07-20-2006
|
8.00
|
installed conduit & wiring for tail, sanded area f
|
Details
|
|
|
07-19-2006
|
8.50
|
prepped and sprayed primer to upper fuselage half
|
Details
|
|
|
07-19-2006
|
8.00
|
installed flaps & alerons to wing, installed contr
|
Details
|
|
|
07-19-2006
|
8.00
|
finished rudder trim servo, installed potential NA
|
Details
|
|
|
07-18-2006
|
16.00
|
finished body work on fuselage upper half and wind
|
Details
|
|
|
07-18-2006
|
7.00
|
final fab of rudder trim servo installation, eleva
|
Details
|
|
|
07-18-2006
|
4.00
|
elevator p/p tube fab, rudder p/p tubes lengths de
|
Details
|
|
|
07-17-2006
|
8.00
|
made carbon pre cured laminate for rudder trim cov
|
Details
|
|
|
07-17-2006
|
14.50
|
bodywork fuselage upper half in preparation for pr
|
Details
|
|
|
07-15-2006
|
5.00
|
covered all holes in exterior of fuselage w/ carbo
|
Details
|
|
|
07-14-2006
|
16.00
|
sanded laminates around outside windows, laminated
|
Details
|
|
|
07-14-2006
|
13.50
|
located LH elevator insp. cover, laminated for rei
|
Details
|
|
|
07-13-2006
|
5.00
|
sanded outside of windows/windscreen on fuselage
|
Details
|
|
|
07-13-2006
|
14.00
|
installed nutplates for inspection cover, drilled
|
Details
|
|
|
07-13-2006
|
9.50
|
finished with rework on inside windows, laminaed a
|
Details
|
|
|
07-12-2006
|
12.00
|
tail inspection panel laminates, laminates over RH
|
Details
|
|
|
07-12-2006
|
8.00
|
finished rework of interior windows
|
Details
|
|
|
07-11-2006
|
10.00
|
laminated around bulkhead elevator p/p tubes, lami
|
Details
|
|
|
07-11-2006
|
7.00
|
fixed upper fuselage windows/windscreen delaminati
|
Details
|
|
|
07-10-2006
|
7.50
|
finished sanding outside of windows, removed blue
|
Details
|
|
|
07-10-2006
|
12.50
|
finalized RH vertical stab placement, checked alig
|
Details
|
|
|
07-07-2006
|
7.00
|
sanded & applied micro to bevel around windows, st
|
Details
|
|
|
07-07-2006
|
10.50
|
marked and trimmed inbd. edge of both elevator hal
|
Details
|
|
|
07-06-2006
|
7.50
|
sign strip windows
|
Details
|
|
|
07-06-2006
|
16.00
|
set up RH vertical fin to proper position, install
|
Details
|
|
|
07-05-2006
|
11.00
|
re-leveled fuselage, marked accurate centerline on
|
Details
|
|
|
07-05-2006
|
5.00
|
assembled internal rudder bellcrank, trimmed fusel
|
Details
|
|
|
07-03-2006
|
6.00
|
prep sanded fuselage for vertical, fabricated & in
|
Details
|
|
|
06-30-2006
|
22.00
|
laminated all areas around horizontal stab to fuse
|
Details
|
|
|
06-28-2006
|
10.00
|
finished horizontal stab incidence & placement, hy
|
Details
|
|
|
06-27-2006
|
13.50
|
leveled fuselage/wing, began leveling & positionin
|
Details
|
|
|
06-26-2006
|
11.00
|
unload kit, jacked up fuselage, retracted gear, in
|
Details
|
|
|
06-26-2006
|
35.00
|
fuselage leveled using previous references and wat
|
Details
|
|
|
05-08-2006
|
52.00
|
Pack in TN, Drive to to AZ
|
Details
|
|
|
03-22-2006
|
90.00
|
Winglets/fuel system/center console/pedestal
|
Details
|
|
|
01-07-2006
|
60.00
|
Hydraulics and fuel system
|
Details
|
|
|
11-09-2005
|
55.00
|
Butt cheeks mounted, Baggage floor. rear hydrauli
|
Details
|
|
|
10-31-2005
|
68.00
|
labor 10/05
|
|
|
|
10-15-2005
|
65.00
|
Top, belly tank
|
Details
|
|
|
09-30-2005
|
21.25
|
labor for 9/05
|
|
|
|
08-20-2005
|
46.00
|
Pressure bulked with fast build up/lowe mounts
|
Details
|
|
|
06-22-2005
|
80.00
|
Belly Tank
|
Details
|
|
|
05-19-2005
|
72.00
|
Ailerons/flaps/gear door-well
|
Details
|
|
|
05-03-2005
|
60.00
|
labor for 4/05
|
|
|
|
04-23-2005
|
80.00
|
WIng fillets, aileron travel, body work, gear door
|
Details
|
|
|
03-05-2005
|
23.50
|
labor for 3/05
|
|
|
|
02-01-2005
|
60.00
|
Gear doors elevator
|
Details
|
|
|
01-11-2005
|
10.00
|
Flaps/bell cranks DL's time
|
|
|
|
01-03-2005
|
5.00
|
Labor on kit 12/04
|
|
|
|
12-02-2004
|
15.00
|
Unpack, check for damage, inventory
|
|
|
|
11-05-2004
|
10.00
|
Packing crating sorting
|
|
|
|
11-04-2004
|
36.00
|
CLose out boxes, wing fillets, door fit , micro/re
|
|
|
|
11-03-2004
|
36.00
|
pressure checked wings, fixed leaks, H stab travel
|
|
|
|
11-02-2004
|
36.00
|
wing fillets, rudder pedals, close out boxes
|
|
|
|
11-01-2004
|
36.00
|
retract step, press door mount/glue , wing fillets
|
|
|
|
10-31-2004
|
20.00
|
gear doors wing fillets gear door close-outs
|
|
|
|
10-30-2004
|
20.00
|
wing fillets/ push rod tubes/ mated wings 1st time
|
|
|
|
10-29-2004
|
36.00
|
body worked elevator/worked on press door
|
|
|
|
10-28-2004
|
36.00
|
Glue in windows/ gear doors trim and hinge
|
|
|
|
10-27-2004
|
36.00
|
Fit and trim top/ gear doors cont.
|
|
|
|
10-26-2004
|
36.00
|
Prepped windows and top for mating
|
|
|
|
10-25-2004
|
36.00
|
Close starboard wing / close elvator
|
|
|
|
10-22-2004
|
36.00
|
Close port wing
|
|
|
|
10-21-2004
|
36.00
|
Close elevator /close H stab
|
|
|
|
10-20-2004
|
36.00
|
Fuel filler / weight in elevator
|
|
|
|
10-19-2004
|
36.00
|
H stab/ wing prep
|
|
|
|
10-18-2004
|
36.00
|
Inventory, Prepped wings/elevator Hstab prep
|
|
|