DANIEL'S WEB SITE
Exec 162
All
Work Logs Found:
319
Category Work Time:
1116 Hours
Date
Hours
Work Log Summary
Details
09-11-2008
0.10
Airworthiness Certificate!
Details
08-29-2008
2.50
Tracking and Final Inspection
Details
08-25-2008
3.00
Redid hang test and W&B
Details
08-18-2008
4.00
Hang test and W&B
Details
08-15-2008
2.00
Final checks
Details
08-11-2008
2.00
Main Rotor Final Adjustments
Details
08-09-2008
2.50
FInal Install of Main Rotor
Details
07-26-2008
2.00
Drilled pitchhorn alignment bolt holes
Details
07-25-2008
1.00
Drilled holes in pitch horn
Details
07-21-2008
2.00
Final alignment
Details
07-20-2008
2.00
Replaced teeter bolts
Details
07-18-2008
2.00
Balanced Blades
Details
07-14-2008
2.50
Repair of tach problem
Details
07-03-2008
0.50
Dual Tach Fiasco
Details
06-30-2008
2.00
Balancing blades
Details
06-29-2008
2.00
Installed Blades
Details
06-27-2008
2.50
Second engine start
Details
06-16-2008
1.50
First engine start!!
Details
06-14-2008
2.00
Fixed leak and did final pre start checks
Details
06-13-2008
2.00
final tail rotor adjustment
Details
06-11-2008
1.50
Antitorque alignment
Details
06-02-2008
2.00
Directional control final adjustments
Details
05-30-2008
2.00
Finishing items
Details
05-26-2008
1.00
Reinstalled rubber molding around fuselage
Details
05-16-2008
2.50
Rubber molding on rear panels
Details
05-05-2008
1.00
Installed rear strut fairings
Details
05-03-2008
2.50
Installed lettering
Details
05-02-2008
2.50
Final installed ELT
Details
04-28-2008
2.00
More final trim work
Details
04-25-2008
2.00
Body Trim
Details
04-14-2008
3.00
Weatherstripping plus
Details
03-30-2008
1.50
Installed the overhead panel
Details
03-28-2008
2.00
Headliner and body panels
Details
03-24-2008
2.00
Finishing interior
Details
03-21-2008
1.50
ELT Installation
Details
03-16-2008
2.00
ELT Installation
Details
03-10-2008
2.00
ELT Installation
Details
03-09-2008
2.00
Installed windscreen
Details
03-04-2008
2.50
Made trial boot for cyclic
Details
03-03-2008
2.00
Body Panels
Details
02-17-2008
4.00
Fabricated fiberglass fitting for cyclic boot
Details
02-15-2008
2.50
Installed the main belly pan
Details
02-10-2008
1.00
Antenna cable
Details
02-02-2008
2.50
Instrument panel
Details
02-01-2008
3.00
Finishing items
Details
01-28-2008
1.50
Pedals
Details
01-26-2008
1.50
Pedals and heat shields
Details
01-25-2008
2.00
Pedals and Rotor blade support
Details
01-21-2008
2.00
More cleanup items
Details
01-19-2008
2.00
Various completion items
Details
01-18-2008
2.50
Various cleanup items
Details
01-14-2008
3.50
Routed cables and fixed mistake
Details
01-13-2008
4.00
Final Installed Tail Rotor
Details
11-26-2007
5.00
Tail boom and Blade box
Details
11-16-2007
4.00
Main rotor box and support
Details
11-09-2007
3.00
Installed tail boom items
Details
11-07-2007
7.00
Finished painting
Details
11-02-2007
4.00
Glued Main Rotor Blades
Details
10-30-2007
2.50
Trim Paint
Details
10-29-2007
6.00
Masking and Trim
Details
10-28-2007
2.00
Last of base coat
Details
10-26-2007
15.00
Everything painted but the main rotor
Details
10-19-2007
20.00
More painting
Details
10-10-2007
1.00
Painted tail boom white
Details
10-08-2007
6.00
Jigged and primed tail boom
Details
10-07-2007
20.00
More priming and jigging
Details
10-02-2007
20.00
Priming fiberglass pieces
Details
09-23-2007
5.00
Modifications from Rotorway School
Details
09-21-2007
0.00
Phase One Training
Details
09-07-2007
20.00
More sanding and windshield
Details
07-30-2007
20.00
Sanding and filling
Details
05-16-2007
3.00
Preparing Counterweight and door hardware
Details
02-14-2007
3.00
Prospective paint schemes
Details
02-12-2007
2.00
Frames for Body Assembly
Details
02-06-2007
2.50
Interor Panels
Details
01-23-2007
1.00
Interior panel covering
Details
01-11-2007
20.00
Built Paint Booth
Details
12-11-2006
1.50
Tip Plug
Details
12-08-2006
1.50
Tip plug
Details
12-07-2006
2.00
Tip plug
Details
12-06-2006
3.00
Installed the tip weights
Details
12-05-2006
2.00
FInal calibration of fuel level guage
Details
11-30-2006
4.00
Root end of main rotors
Details
11-29-2006
2.50
Fitting the retention straps
Details
11-27-2006
3.00
Rotor Cradles
Details
11-20-2006
4.00
Started on main rotors
Details
11-16-2006
4.00
Building exhaust fan for paint booth
Details
11-15-2006
4.00
Ramps for aerolift
Details
11-10-2006
6.00
To the airport!
Details
11-09-2006
4.00
Out of Garage
Details
11-08-2006
1.00
Lowered aircraft for garage removal
Details
11-07-2006
3.00
Radio and fuel level guage
Details
11-05-2006
3.00
Fuel Level Guage
Details
11-03-2006
4.00
Trouble shot radio problem
Details
11-02-2006
3.00
Misc punch list items
Details
11-01-2006
3.00
Refabricated the pilot side rear tank attachment
Details
10-25-2006
4.00
Finished tow attachment
Details
10-23-2006
6.00
Fabricating the tow attachment
Details
10-20-2006
2.00
Fabricating jacking points
Details
10-16-2006
2.50
Preparing jack adapters
Details
10-12-2006
2.50
Preparing to move out of garage
Details
10-11-2006
3.00
More disassembly
Details
10-10-2006
2.50
Began disassemble for move to airport
Details
10-09-2006
3.00
Cut out pitch horns
Details
10-08-2006
2.00
Trimmed dog house
Details
10-05-2006
6.00
Door strike plates
Details
09-27-2006
3.00
Doors and rotor tap hammer
Details
09-26-2006
3.00
Strut Fairings and latches
Details
09-25-2006
2.00
Strut Fairings
Details
09-24-2006
2.50
Disassembled Tail Boom
Details
09-23-2006
2.00
Energized Electronics
Details
09-22-2006
3.00
Final Wiring
Details
09-21-2006
4.00
Installed tail rotor drive train
Details
09-20-2006
4.00
Finished triming rear panels
Details
09-18-2006
3.00
Engine bottom pan
Details
09-13-2006
4.00
Rear panels and bottom plate
Details
09-11-2006
4.00
Rear Panels
Details
09-08-2006
4.00
Trimmed heat shielding for rear panels
Details
09-07-2006
4.00
Trimming rear body panels
Details
07-06-2006
3.00
Reinstalled windscreen, etc.
Details
06-27-2006
2.50
Strut Fairing and Transponder Antenna
Details
06-23-2006
3.50
Strut Fairings
Details
06-22-2006
4.00
Strut Fairings
Details
06-21-2006
2.00
Strut fairings
Details
06-20-2006
3.50
Fuel filler holes and body pieces
Details
06-19-2006
3.00
Fuel filler holes and Fuel Drain
Details
06-15-2006
2.00
Position lights
Details
06-14-2006
1.50
Position Lights
Details
06-13-2006
2.00
Reinstalled the tub
Details
06-12-2006
2.00
Test install of instrument panel
Details
06-11-2006
3.00
Ventilation and fuel shutoff
Details
06-07-2006
3.00
Main airframe wiring continued
Details
06-06-2006
3.00
Airframe Wiring
Details
06-05-2006
2.50
Airframe wiring
Details
06-03-2006
2.50
Airframe wiring
Details
06-02-2006
3.00
Radio and panel wiring
Details
06-01-2006
3.00
Radio Wiring
Details
05-26-2006
3.00
Radio wiring
Details
05-25-2006
3.00
Radio wiring
Details
05-24-2006
4.00
Instrument Panel Wiring
Details
05-22-2006
1.50
Garmin installation
Details
05-20-2006
2.00
Floor pan wiring
Details
05-14-2006
3.00
Switch panel
Details
05-13-2006
4.00
Avionics and Main wiring harness
Details
05-09-2006
4.00
Intercom Wiring harness
Details
05-07-2006
2.50
Radio Wire Harness
Details
05-05-2006
1.00
Underseat foam
Details
05-04-2006
3.00
Wiring diagrams
Details
05-03-2006
2.00
Miscellaneous
Details
05-02-2006
2.00
Headliner
Details
05-01-2006
3.00
Headliners plus
Details
04-28-2006
5.00
Wiring of panel
Details
04-25-2006
2.00
Reinstalled the headliners.
Details
04-24-2006
3.00
Headliners
Details
04-22-2006
2.50
Headliner
Details
04-20-2006
2.00
Cabin headliner
Details
04-19-2006
3.00
Cabin heat
Details
04-18-2006
2.00
Intercom
Details
04-13-2006
2.50
Interior liners
Details
04-11-2006
1.50
Interior liners
Details
04-10-2006
3.00
Switch Panel
Details
04-09-2006
2.00
Finished Installing Instruments in Panel
Details
04-04-2006
0.00
Aero Lift
Details
04-03-2006
0.00
Lift for hanger
Details
03-31-2006
2.50
Floor pan instruments
Details
03-28-2006
2.00
Instrument panel trial fit
Details
03-27-2006
4.00
Instrument panel
Details
03-26-2006
2.50
Instrument panel attachment
Details
03-24-2006
2.50
Fitting of Radio Racks
Details
03-23-2006
2.00
Fiberglassed in panel
Details
03-22-2006
4.00
Fit up Instrument Panel
Details
03-07-2006
2.00
Muffler brackets
Details
02-16-2006
2.00
Fuel lines
Details
02-15-2006
3.00
FInal Installed Tanks
Details
02-12-2006
3.00
Painted clamps and installed rubber
Details
02-10-2006
4.00
Fuel tank clamps and straps
Details
02-09-2006
4.00
Fuel Tank Clamps
Details
02-08-2006
2.00
Fuel tank clamps
Details
02-07-2006
3.00
Details
02-06-2006
2.00
Fuel tank spacers
Details
02-02-2006
1.50
Installed the clutch engagement arm
Details
02-01-2006
2.00
Fuel Tanks
Details
01-31-2006
3.00
Began fuel system installation
Details
01-30-2006
3.00
Top and bottom heat shields
Details
01-27-2006
4.00
More heat shielding work
Details
01-25-2006
3.00
Heat shielding and fuel drain valve
Details
01-24-2006
4.00
Heat shield fabrication
Details
01-23-2006
4.00
Heat shield templates
Details
01-22-2006
2.00
Oil sump and cooling lines
Details
01-21-2006
2.00
Oil Sump bracket
Details
01-20-2006
3.00
Hoses and sump
Details
01-19-2006
3.00
Fan shroud and chain oil bath
Details
01-18-2006
2.00
Fan Shroud
Details
01-14-2006
2.00
Radiator Shroud
Details
01-13-2006
3.00
Radiator Shroud
Details
01-11-2006
2.00
Exhaust header
Details
01-09-2006
2.00
Chain Oil Bath
Details
01-05-2006
2.50
Chain Oil Bath
Details
01-04-2006
1.50
Chain Oil Bath
Details
01-03-2006
1.50
Chain Oil Bath
Details
01-02-2006
3.00
Chain Oil Bath
Details
12-28-2005
2.00
Exhaust header insulation
Details
12-26-2005
2.50
Chain Oil Bath
Details
12-22-2005
2.00
Chain Oil Bath
Details
12-20-2005
0.50
Last tail rotor bolt
Details
12-14-2005
2.00
Final installed the water pump and alternator
Details
12-13-2005
3.50
Idler arm and fan transfer shaft
Details
12-09-2005
3.00
Idler arm and clutch
Details
12-07-2005
3.00
Engine mount and anti-torque link
Details
11-30-2005
5.00
New engine mount
Details
11-19-2005
3.00
Fabricated the fan Countershaft
Details
11-17-2005
2.00
Installed engine
Details
11-16-2005
3.50
Clutch, torque rod, and engine jack
Details
11-15-2005
3.00
Getting ready for engine installation
Details
11-14-2005
4.00
Trued main rotor and added secondary shims
Details
11-09-2005
5.00
miscellaneous activities
Details
11-03-2005
3.00
Finished empennage.
Details
11-02-2005
4.00
Installed radio antenna
Details
11-01-2005
4.00
Installed counterbalance
Details
10-31-2005
4.00
Vertical stabilizer
Details
10-27-2005
3.00
Drilled main drive holes
Details
10-25-2005
3.00
Started drilling main sproket
Details
10-22-2005
3.00
Tail rotor
Details
10-20-2005
5.00
Tail Boom components
Details
10-19-2005
6.00
Installed tail boom items
Details
10-18-2005
2.00
Tail Rotor
Details
10-17-2005
2.50
Tail Rotor
Details
10-14-2005
2.50
Vertical Stab tail rotor
Details
10-13-2005
3.00
Final install of cockpit controls
Details
10-07-2005
4.00
Painted control assembly parts
Details
10-05-2005
4.00
Tail Rotor Slider Assembly
Details
09-29-2005
4.00
Fabricate assemblies
Details
09-25-2005
4.00
Fabricate assemblies
Details
09-23-2005
4.00
Collective control linkage
Details
09-22-2005
3.00
Seat Belts
Details
09-21-2005
4.00
Cyclic Control
Details
09-19-2005
3.50
Collective Scissors Mount
Details
09-16-2005
5.00
ECU's and Ignition Modules
Details
09-15-2005
3.00
Collective and throttle
Details
09-14-2005
5.00
Collective control
Details
09-13-2005
4.00
Collective control
Details
09-12-2005
5.00
Air Ducting
Details
09-10-2005
2.00
HVAC valve
Details
09-09-2005
3.00
Heat/air control valve
Details
09-08-2005
5.00
Interior panels and seats
Details
09-04-2005
4.00
Heel rests and storage compartment
Details
09-01-2005
2.00
Aluminum Panels
Details
08-28-2005
2.50
Seat back panels
Details
08-26-2005
1.50
ECU chassis
Details
08-25-2005
4.00
Aluminum Plates
Details
08-23-2005
4.00
Directional control
Details
08-18-2005
5.00
unpacking groups 3 and 4
Details
08-16-2005
3.00
Pedal Weldments
Details
08-15-2005
2.00
Directional Control
Details
08-14-2005
2.00
Directional Control
Details
08-13-2005
2.00
Directional control system
Details
08-12-2005
2.00
Directional control pedals
Details
08-09-2005
3.00
Covers for cyclic controls
Details
08-07-2005
2.00
Cyclic control
Details
08-06-2005
3.00
Cyclic Controls
Details
08-04-2005
4.00
Cyclic Control
Details
08-03-2005
3.00
Disassemble body
Details
07-12-2005
3.00
Windscreen
Details
07-10-2005
3.00
Windscreen
Details
07-08-2005
2.00
Horizontal stabilizer
Details
07-07-2005
2.00
Horizontal stabilizer
Details
05-31-2005
2.00
Winglets
Details
05-24-2005
4.00
Winglets
Details
05-16-2005
2.00
Doghouse fairing
Details
05-13-2005
1.00
Doghouse fairing
Details
05-11-2005
4.00
Doghouse fairing
Details
05-09-2005
5.00
Storage bags for doors
Details
03-05-2005
2.50
Doors
Details
03-03-2005
1.00
Doors
Details
03-02-2005
2.50
Doors
Details
03-01-2005
2.00
Doors
Details
02-28-2005
2.00
Doors
Details
02-26-2005
2.50
Doors
Details
02-18-2005
5.00
Doors
Details
02-13-2005
2.00
Doors
Details
02-11-2005
2.00
Doors
Details
02-10-2005
1.00
Doors
Details
02-08-2005
3.50
Doors
Details
02-07-2005
3.00
Doors
Details
02-05-2005
3.00
Doors
Details
02-04-2005
1.00
Doors
Details
02-03-2005
3.00
Doors
Details
12-14-2004
2.00
Door hardware
Details
12-10-2004
2.00
Fabricating door hardware.
Details
12-07-2004
3.00
Glued up pilot's door
Details
12-06-2004
6.00
passenger eyebrow and pilot's door
Details
12-04-2004
4.00
Windshield and Eyebrow
Details
12-03-2004
6.00
Windscreen and front inspection panel
Details
12-02-2004
12.00
Final body panel work
Details
11-19-2004
6.00
Interior panels
Details
11-17-2004
8.00
nutplate galore
Details
11-12-2004
3.00
Finished Windscreen
Details
11-11-2004
15.00
Finished installing body panels
Details
11-04-2004
14.00
Installed windscreen
Details
10-15-2004
5.00
Body initial fit
Details
10-11-2004
4.00
Body Pan Initial fit
Details
10-09-2004
6.00
Installed tail boom
Details
10-08-2004
3.00
Rudder Pedal Cross Tube
Details
05-11-2004
3.00
Horizontal Tail
Details
04-25-2004
3.00
Insp panel and boom support
Details
04-21-2004
2.50
Inspection panels
Details
04-20-2004
1.00
Finished installing main rotor mast
Details
04-19-2004
3.00
Fitting of Main Rotor Mast
Details
04-02-2004
3.50
Lower mast bearing
Details
04-01-2004
3.00
Upper Mast Bearing
Details
03-21-2004
3.00
Reassembled frame
03-20-2004
2.00
Picked up frame from Powder Coater
02-11-2004
1.00
Delivery to Powder coater
Details
02-06-2004
8.00
Sections 3 and 4
Details
01-30-2004
20.00
Section 2
Details
01-31-2003
2.00
Inventory Complete
Details
01-29-2003
2.00
Continued unpacking and inventory
Details
01-28-2003
3.00
Opened crates and began inventory
01-27-2003
40.00
Built workshop in garage bay
Details
SITE NAVIGATION
Contact Builder
Exec 162 Home
Category
# Logs
# Hours
All
319
1114
Airframe and Landing Gear
5
29
Avionics
5
12
Clutch assembly
1
2
Control Systems
27
78
Cooling System
8
20
Electronics
28
78
Empennage
12
44
Engine
8
22
Fuel System
12
33
Fuselage
69
236
Hardware
4
10
Heat Shielding
6
22
Instruments
16
38
Interior
22
57
lower engine mount
1
8
Main Rotor
27
72
Miscellaneous
15
46
None
4
1
Painting
17
171
Power train
10
24
Systems
4
12
Tail Boom
10
35
Tools
3
12
Workshop and Inventory
5
52