Powered By Kitlog Pro v2.0
Bearhawk N99DY
Bearhawk QB
All
Work Logs Found:
52
Category Work Time:
315 Hours
Date
Hours
Work Log Summary
Details
12-02-2007
4.00
Rear left window
Details
12-02-2007
16.00
fuel valve and lines
Details
11-10-2007
16.00
Rudder Trim System
Details
11-03-2007
6.00
Gascolator
Details
10-06-2007
8.00
Parking brake valve
Details
04-26-2007
8.00
Redo of electric trim servo.
Details
04-06-2007
16.00
elevator balance weights
Details
03-25-2007
8.00
more fuel lines
Details
03-24-2007
30.00
fuel lines
Details
02-13-2007
10.00
Pilot and C/P doors.
Details
01-06-2007
8.00
Rear pax door
Details
12-09-2006
2.00
Installed prop gov
Details
11-04-2006
2.00
Oil cooler mounting
Details
10-14-2006
8.00
Mounted the 540 and the exhaust
Details
09-23-2006
8.00
Fuel Valve/Aux Pump Switches
Details
09-10-2006
10.00
Cargo Door
Details
08-23-2006
6.00
Tailwheel and spring
Details
08-21-2006
10.00
Stringers
Details
08-19-2006
8.00
left boot cowl extension
Details
08-19-2006
1.00
Instrument panel fit and clecoed in place
08-19-2006
0.00
1st draft of panel
Details
08-18-2006
8.00
right side extension
Details
08-15-2006
6.00
fit boot cowl side extendions
Details
08-10-2006
0.00
Went to Vegas and Hoover Dam
Details
08-07-2006
4.00
Removable top cover on instrument panel
Details
08-05-2006
8.00
boot cowl fitted
Details
08-04-2006
6.00
Angle for instrument panel
Details
08-01-2006
6.00
working on the boot cowl and instrument panel
Details
07-31-2006
4.00
Mounted Andair Fuel Valve
Details
07-28-2006
6.00
Firewall Tunnel
Details
07-21-2006
2.00
Aft cabin bulkhead
Details
06-05-2006
2.00
Oil cooler and mount
Details
06-01-2006
0.00
Recieved exhaust system from Vetterman
05-22-2006
2.00
rear avionics shelf
05-05-2006
4.00
floorboard in cargo area
04-28-2006
4.00
floorboard under rear seat
04-17-2006
4.00
floorboard under front seats
04-04-2006
6.00
Floorboard under control sticks
04-01-2006
6.00
Forward floor board
03-13-2006
0.00
Took a break from BH to build bathroom in hangar!
03-11-2006
5.00
started installing elevator trim
Details
03-06-2006
4.00
installed control sticks
03-04-2006
3.00
installed rudder petals and brake cylinders
03-01-2006
4.00
Installed main landing gear to fuselage
02-28-2006
3.00
Install tires on wheels
02-28-2006
6.00
Drill and install brakes on gear legs
02-27-2006
4.00
drill and tap oil fill hole, assemble struts
02-25-2006
6.00
elevator control cables and bellcrank
02-24-2006
4.00
Installed elevators and rudder
02-23-2006
4.00
installed horizonal stab
02-22-2006
6.00
Unpack and inventory
Details
02-21-2006
3.00
Delivery of the kit
SITE NAVIGATION
Contact Builder
Bearhawk QB Home
Category
# Logs
# Hours
All
52
315
Avionics
1
Control cables
1
6
Empennage
6
53
Engine
5
14
Fuel system
5
68
Fun time
1
Fuselage
25
140
Main Landing Gear
1
4
Miscellaneous
1
MLG shock struts
1
4
Quickbuild kit
2
9
Wheels and brakes
3
17
Copyright © 2001-2025 Matronics. All Rights Reserved.