Powered By Kitlog Pro v2.0
JON'S WEB SITE
Searey
All
Work Logs Found:
95
Category Work Time:
567 Hours
Date
Hours
Work Log Summary
Details
08-21-2017
1.00
test2
Details
08-16-2017
1.00
test1
Details
12-07-2016
20.00
Top tape
Details
10-12-2016
20.00
Rib tapes
Details
09-13-2016
20.00
Amount of fabric
Details
08-25-2016
10.00
Marking the fabric
Details
08-10-2016
10.00
Wing covering
Details
08-05-2016
5.00
Sweep cables routing in the wing
Details
08-04-2016
5.00
Aileron assembly
Details
08-03-2016
5.00
Strut assembly
Details
08-02-2016
6.00
Flap assembly
Details
07-29-2016
5.00
Stabilizer assembly
Details
07-28-2016
5.00
Left wing
Details
07-27-2016
5.00
Left wing construction
07-24-2016
15.00
Right wing construction 2
Details
07-17-2016
12.00
Right wing construction 1
Details
07-07-2016
5.00
Modifying main wheels
Details
07-06-2016
5.00
Modifying tail wheel
Details
07-02-2016
5.00
Elevator assembly
10-14-2015
3.00
Upper windshield support
10-14-2015
2.00
Pylon filling
Details
09-23-2015
6.00
Windshield mounting
04-01-2015
4.00
New dolly to move the Searey better
Details
04-01-2015
4.00
New dolly
Details
03-31-2015
8.00
Cargo compartment
Details
03-28-2015
20.00
Mounting of defog system
Details
03-24-2015
20.00
Securing oil and fuel hoses
Details
03-24-2015
6.00
Changing fuelhoses between tank and gascolator
09-04-2014
1.00
testing
Details
05-04-2014
2.00
Mounting of the ELT antenna
04-30-2014
1.00
Testing
Details
03-03-2012
1.00
test
09-29-2011
8.00
Reinforcing backup instrument mount
Details
09-29-2011
2.00
Mounting of OAT probe
Details
02-09-2010
5.00
Softstartmodule
Details
01-28-2010
15.00
Oil hooses
Details
01-26-2010
10.00
Water cooling
Details
01-19-2010
6.00
Radiator mounting
Details
01-13-2010
5.00
Carburator heater
Details
01-06-2010
10.00
Chokehandle
Details
12-03-2009
4.00
Engine mounting
12-01-2009
1.00
Gearswitch
Details
11-24-2009
3.00
Mounting map box hatch
11-19-2009
3.00
Mounting Flap actuator
Details
11-17-2009
4.00
Fitting the Flapcontrollbox in pedestall
Details
11-12-2009
3.00
Fitting exp bus
Details
10-28-2009
4.00
Mounting Dynon bracket
Details
08-26-2009
10.00
Mounting of the Choke handle
Details
08-22-2009
20.00
Construction of pedestall
Details
05-28-2009
2.00
Turtledeckwindows
Details
05-27-2009
3.00
Cooling/heating system
Details
04-28-2009
5.00
Seatbeltsupport
04-25-2009
3.00
Trim mechanism
04-24-2009
8.00
cargodeck
Details
04-17-2009
25.00
Routing of cooling hoose and wiring
Details
04-10-2009
25.00
Fitting pylon sidecover
Details
03-25-2009
3.00
Fasten turtledeck
Details
03-25-2009
2.00
Aileron torque tube installation
Details
02-18-2009
2.00
Internal flapmechanism
Details
02-17-2009
4.00
Turtledeckbulkhead
01-21-2009
6.00
Mounting aft boom cover
Details
01-15-2009
4.00
Turtledeck mounting
Details
01-14-2009
3.00
Turtledeck mounting
Details
12-17-2008
4.00
Fuel shutofvalve
Details
11-15-2008
4.00
Fabric on turtledeck
Details
11-13-2008
2.00
Locating Dynon remote compass
Details
06-29-2008
3.00
Fwd cargo
Details
04-08-2008
5.00
Battery mounting
Details
02-25-2008
4.00
Tailweel wire routing
Details
04-24-2007
2.00
Tailweel wire modification
Details
04-24-2007
4.00
Final solution of fuelsystem
Details
04-19-2007
4.00
Rudder cable routing
Details
03-14-2007
3.00
Rudder construction
03-13-2007
2.00
Elevator push pull assembly
02-16-2007
8.00
Final fuelsystem
Details
02-15-2007
8.00
Stick mounting
02-14-2007
5.00
Fueltank installation
Details
02-13-2007
8.00
Securing bildgepump
Details
02-12-2007
8.00
Securing the hull
Details
01-26-2007
4.00
Main wheel asembly
Details
01-11-2007
5.00
Modifying fingerstrainer to tank
Details
12-12-2006
2.00
Mounting of keelguard
Details
09-20-2006
4.00
Reinforcement of gear
Details
09-07-2006
5.00
Hydraulic testing
Details
09-06-2006
4.00
Electric testing
Details
09-05-2006
3.00
Pump mounting
Details
11-26-2005
4.00
Cutting out the holes in the hull
11-25-2005
2.00
Hull fitting
10-26-2005
3.00
Boom tube
Details
10-21-2005
2.00
Main Bulkhead
Details
10-18-2005
1.00
Treatment with lensoil on inside tubings
Details
09-21-2005
1.00
test
Details
09-21-2005
2.00
Shop setup
Details
09-21-2005
1.00
Page 1
Details
09-14-2005
4.00
Unpacking
Details
SITE NAVIGATION
Contact Builder
Searey Home
Category
# Logs
# Hours
All
95
567
Aileron
3
12
Avionics
6
12
Elevator
1
5
Empennage
1
3
Engine
8
75
Flaps
4
15
Flight controll
1
3
Fuelsystem
5
27
Fuselage
35
220
Gear
7
30
Instruments
1
8
Miscellaneous
9
25
None
2
2
Stabilizer
1
5
Strut/float
1
5
Trim
1
3
Wings
9
117
Copyright © 2001-2024 Matronics. All Rights Reserved.