KitLog pro

Powered By Kitlog Pro v2.0

Rays Web Site
Work Logs Found: 122
Category Work Time: 623 Hours
 Date
Hours
Work Log Summary

Details

 04-08-2008
5.00
Moved the Project to "Storage'
Details
       

 01-12-2008
5.00
Riveted the Aft Fuselage Left Skin
Details
       

 01-05-2008
3.00
Riveted the Right Aft Side skin.
Details
     

 01-03-2008
4.00
Riveted the bottom of the Aft Fuselage.
Details
     

 01-02-2008
9.00
Started the Riveting, Made some more of the small
Details
       

 01-01-2008
10.00
Finished the Dimpling, Priming of Aft Fuse
Details
       

 12-31-2007
11.00
Built a foot valve for the Pneumatic Dimpler and D
Details
       

 12-29-2007
3.00
Riveted BellCrank, Made Spacers etc. Matched Drill
Details
     

 12-28-2007
9.00
Assembled and drilled the Aft Fuselage section.
Details
       

 12-27-2007
4.00
First Assy of the "Canoe"
Details
       

 12-27-2007
3.00
Assembled F-711 and F-712
Details
       

 12-26-2007
10.00
Built the various parts for the Bulkheads
Details
       

 12-25-2007
8.00
Assembled F-705 Bulkhead
Details
     

 12-24-2007
6.00
F-705 Assy Prep
Details
     

 12-19-2007
4.00
F-904 Assembly
Details
       

 12-17-2007
8.00
Finished deburring and preping then Primed Parts
Details
       

 12-15-2007
7.00
More deburring and straightening
Details
     

 12-14-2007
6.00
Deburring Parts
Details

 12-14-2007
2.00
Assembled the firewall
Details
       

 12-13-2007
8.00
Started assembly of Firewall
Details
     

 12-11-2007
0.00
Photos showing the lighting and Power setup in my
Details
       

 12-11-2007
0.00
More Wing Pics
Details
       

 12-11-2007
7.00
Finished assembly of Aileron Controls
Details
       

 12-07-2007
0.10
First Test of Fuel Tank... A CAT Scan.
Details
     

 12-07-2007
7.00
Assembled and Sealed the Left Fuel tank.
Details
       

 12-06-2007
4.00
Assembled and sealed the Fuel Tank Access Covers
Details
       

 04-10-2007
5.00
Preped the Tri-Pacer for sale
Details
       

 04-10-2007
0.50
N6107D In Hanger
       

 04-10-2007
0.50
More photos of N6107D
Details
       

 04-10-2007
0.50
More Photos of N6107D
       

 04-10-2007
2.00
More N6107 Photos
Details
       

 01-25-2007
2.00
Took delivery of the engine.
Details
       

 01-17-2007
1.00
Won the bidding on a Lycoming O-320 B3B engine!
Details
       

 01-12-2007
3.50
Left Flap bottom skin & Trailing Edge Riveting don
Details
       

 01-12-2007
4.00
Assembled Right Flap
Details
       

 01-11-2007
2.50
Riveted the Left Flap Bottom Skin to Fwd Spar
Details
       

 01-10-2007
2.00
Started Right Flap Nose and top skin riveting.
Details
       

 01-09-2007
4.00
Riveted nose and top skins to Right Flap
Details
       

 01-09-2007
3.00
Finished Riveting Both Flap skeletons
Details
     

 01-06-2007
5.00
Dimpled the right flap and primed L&R flap skins/A
Details
       

 01-05-2007
5.00
Right Flap Assy First Assy & Match Drilling
Details
       

 01-05-2007
2.00
Deburred the Right Spar and Ribs Using new Tool.
Details
     

 01-03-2007
2.00
Assembling the Left Flap Skeleton.
Details
       

 01-02-2007
4.00
Assembled Left Flap Leading Edge rib/Hinge Assys
Details
       

 01-01-2007
3.00
Deburred and dimpled Left Flap skins
Details
       

 12-30-2006
6.00
Deburr, & Dimple the Left Flap Assy
Details
       

 12-30-2006
1.00
Countersunk Left Flap Spar
     

 12-29-2006
4.00
Fit Assembled and Match drilled Left Flap
Details
       

 12-29-2006
3.00
Designed and constructed the Flap assembly Jig and
Details
       

 12-28-2006
3.00
Fabricated the Flap angle brackets and ifitted the
Details
     

 12-27-2006
2.00
Install Ailerons to Wings
Details
       

 12-26-2006
2.00
Riveted Gap Seals on the Right wing.
Details
     

 12-26-2006
2.00
Built/Installed Right Outbd Aileron Hinge Assy
Details
     

 12-13-2006
1.00
Riveted the Left Wing Gap Seals
Details
     

 12-13-2006
2.00
Drill, Deburr and Dimple Gap Seals
Details
       

 12-11-2006
2.00
Drill the Flap hinge assy to bottom skin holes.
Details
       

 12-11-2006
2.00
Countersunk bracketts, Riveted assy to wing.
Details
       

 12-06-2006
2.00
Removed the Wing Fixture and cleaned up the area.
Details
       

 12-06-2006
4.00
Installed the Flap Hinges on the wings
Details
       

 12-05-2006
3.00
More Aileron Work
Details
       

 12-05-2006
1.00
Finished up the ailerons!
Details
       

 12-04-2006
2.00
Riveting R Aileron Skins
Details
       

 12-04-2006
3.00
Closing Up Right Aileron
Details
       

 12-02-2006
10.00
Ailerons
Details
       

 11-23-2006
1.00
Rivet Aileron Stiffeners
Details
     

 11-22-2006
16.00
Sorting parts
Details

 11-16-2006
4.00
Primed ailerons and flaps.
Details
       

 11-13-2006
6.00
Preped, drilled & Dimpled the Ailerons and flaps
Details

 03-15-2006
5.00
Started aileron assembly, drilled and de-burred bo
       

 03-15-2006
4.00
Preped alerons and flaps, removed blue plastic and
       

 03-11-2006
5.00
Cleaned and re-organized the shop to get ready for

 03-09-2006
1.00
Took photos of the basic hand tools that I have pr
Details
       

 03-09-2006
5.00
Right wing tank Phase II
Details
       

 03-08-2006
7.00
Riveted Right Top Wing Skin
Details
       

 03-08-2006
3.00
Finished up inserting and taping rivets on Rt top
     

 03-07-2006
3.00
Prepared Right Wing skeleton for leading edge
Details
       

 03-07-2006
5.00
Attached Right Wing Top skin, inserted rivets and
Details
       

 03-07-2006
4.00
Attached Right Wing outboard Leading Edge to Skele
Details
       

 03-04-2006
7.00
Right Wing Prep, Primed Skins & Ribs

 03-04-2006
3.00
Assembled Right Wing Leading edge
Details

 03-01-2006
7.00
Right Wing prep

 10-12-2005
9.00
Received Fuselage and Inventoried

 09-05-2005
6.00
Right Wing Prep and assembly

 07-28-2005
9.00
Sealing Tanks Phase 1
Details

 07-05-2005
8.00
Fitting Right Wing Leading Edge

 06-30-2005
7.00
Fit Right Wing skins

 06-29-2005
9.00
Assemble Right wing skeleton

 06-18-2005
4.00
Riveted Left Wing Top Skins

 06-09-2005
11.00
Left wing skin prep & riveting

 05-12-2005
6.00
Construct Roll-around wing stand

 02-09-2005
5.00
Drilling Left Tank Assy

 02-08-2005
5.00
Drill Left tank Assy

 01-24-2005
9.00
Fuel Tank assembly Left Wing

 01-06-2005
9.00
Leading Edge Assy, Construct Cradle

 01-06-2005
3.00
Continue fitting stringers

 12-30-2004
2.00
Fitting Span-wise Stringers

 12-29-2004
4.00
Fit Left wing skins
       

 12-28-2004
4.00
Assemble Left wing skeleton
     

 12-27-2004
5.00
PrepLeft wing ribs
     

 12-27-2004
0.50
Construct Aileron alignment tool

 12-25-2004
12.00
Assemble rear wing spars
       

 12-24-2004
8.00
ID wing spars, Attach Tank attach Platenuts to Spa
       

 12-23-2004
7.00
Built Wing assembly fixture
       

 11-18-2004
6.00
Designed and constructed Pneumatic "C'" press.
Details
       

 10-28-2004
6.00
Finish Elevators

 10-27-2004
10.00
Fit Right Elevator to Horz Stab, assemble Left Ele

 10-14-2004
7.00
Wings arrived and Inventoried

 10-14-2004
7.00
Build trim Tab

 09-06-2004
12.00
Building the Right elevator

 08-17-2004
5.00
Complete Rudder Assembly
       

 08-14-2004
9.00
Rudder assembly, Trailing edge riveting.
Details
       

 08-13-2004
7.00
Rudder counterweight installation & riveting
     

 08-11-2004
8.00
Rudder Assembly
       

 08-11-2004
8.00
Finish Vert Stab assy.
Details
       

 08-07-2004
8.00
Deburr, Dimple, Prime Vert Stab
       

 08-06-2004
3.00
Drill Rib to Spar attach Holes

 08-05-2004
9.00
Drilling Vert Stab
       

 08-04-2004
7.00
Assemble Horizontal Stab
       

 08-03-2004
8.00
Assemble Horizontal Stab
       

 08-02-2004
7.00
Prep and prime Horizontal Stab Parts
       

 07-30-2004
9.00
Prep, Match Drill, Dimple and assemble Horizontal
       

 07-10-2004
9.00
Assemble the Horizontal Stabilizer Skeleton
       










Copyright © 2001-2024 Matronics. All Rights Reserved.