Date
|
Hours
|
Work Log Summary
|
Details
|
04-08-2008
|
5.00
|
Moved the Project to "Storage'
|
Details
|
|
|
01-12-2008
|
5.00
|
Riveted the Aft Fuselage Left Skin
|
Details
|
|
|
01-05-2008
|
3.00
|
Riveted the Right Aft Side skin.
|
Details
|
|
|
01-03-2008
|
4.00
|
Riveted the bottom of the Aft Fuselage.
|
Details
|
|
|
01-02-2008
|
9.00
|
Started the Riveting, Made some more of the small
|
Details
|
|
|
01-01-2008
|
10.00
|
Finished the Dimpling, Priming of Aft Fuse
|
Details
|
|
|
12-31-2007
|
11.00
|
Built a foot valve for the Pneumatic Dimpler and D
|
Details
|
|
|
12-29-2007
|
3.00
|
Riveted BellCrank, Made Spacers etc. Matched Drill
|
Details
|
|
|
12-28-2007
|
9.00
|
Assembled and drilled the Aft Fuselage section.
|
Details
|
|
|
12-27-2007
|
4.00
|
First Assy of the "Canoe"
|
Details
|
|
|
12-27-2007
|
3.00
|
Assembled F-711 and F-712
|
Details
|
|
|
12-26-2007
|
10.00
|
Built the various parts for the Bulkheads
|
Details
|
|
|
12-25-2007
|
8.00
|
Assembled F-705 Bulkhead
|
Details
|
|
|
12-24-2007
|
6.00
|
F-705 Assy Prep
|
Details
|
|
|
12-19-2007
|
4.00
|
F-904 Assembly
|
Details
|
|
|
12-17-2007
|
8.00
|
Finished deburring and preping then Primed Parts
|
Details
|
|
|
12-15-2007
|
7.00
|
More deburring and straightening
|
Details
|
|
|
12-14-2007
|
6.00
|
Deburring Parts
|
Details
|
|
|
12-14-2007
|
2.00
|
Assembled the firewall
|
Details
|
|
|
12-13-2007
|
8.00
|
Started assembly of Firewall
|
Details
|
|
|
12-11-2007
|
0.00
|
Photos showing the lighting and Power setup in my
|
Details
|
|
|
12-11-2007
|
0.00
|
More Wing Pics
|
Details
|
|
|
12-11-2007
|
7.00
|
Finished assembly of Aileron Controls
|
Details
|
|
|
12-07-2007
|
0.10
|
First Test of Fuel Tank... A CAT Scan.
|
Details
|
|
|
12-07-2007
|
7.00
|
Assembled and Sealed the Left Fuel tank.
|
Details
|
|
|
12-06-2007
|
4.00
|
Assembled and sealed the Fuel Tank Access Covers
|
Details
|
|
|
04-10-2007
|
5.00
|
Preped the Tri-Pacer for sale
|
Details
|
|
|
04-10-2007
|
0.50
|
N6107D In Hanger
|
|
|
|
04-10-2007
|
0.50
|
More photos of N6107D
|
Details
|
|
|
04-10-2007
|
0.50
|
More Photos of N6107D
|
|
|
|
04-10-2007
|
2.00
|
More N6107 Photos
|
Details
|
|
|
01-25-2007
|
2.00
|
Took delivery of the engine.
|
Details
|
|
|
01-17-2007
|
1.00
|
Won the bidding on a Lycoming O-320 B3B engine!
|
Details
|
|
|
01-12-2007
|
3.50
|
Left Flap bottom skin & Trailing Edge Riveting don
|
Details
|
|
|
01-12-2007
|
4.00
|
Assembled Right Flap
|
Details
|
|
|
01-11-2007
|
2.50
|
Riveted the Left Flap Bottom Skin to Fwd Spar
|
Details
|
|
|
01-10-2007
|
2.00
|
Started Right Flap Nose and top skin riveting.
|
Details
|
|
|
01-09-2007
|
4.00
|
Riveted nose and top skins to Right Flap
|
Details
|
|
|
01-09-2007
|
3.00
|
Finished Riveting Both Flap skeletons
|
Details
|
|
|
01-06-2007
|
5.00
|
Dimpled the right flap and primed L&R flap skins/A
|
Details
|
|
|
01-05-2007
|
5.00
|
Right Flap Assy First Assy & Match Drilling
|
Details
|
|
|
01-05-2007
|
2.00
|
Deburred the Right Spar and Ribs Using new Tool.
|
Details
|
|
|
01-03-2007
|
2.00
|
Assembling the Left Flap Skeleton.
|
Details
|
|
|
01-02-2007
|
4.00
|
Assembled Left Flap Leading Edge rib/Hinge Assys
|
Details
|
|
|
01-01-2007
|
3.00
|
Deburred and dimpled Left Flap skins
|
Details
|
|
|
12-30-2006
|
6.00
|
Deburr, & Dimple the Left Flap Assy
|
Details
|
|
|
12-30-2006
|
1.00
|
Countersunk Left Flap Spar
|
|
|
|
12-29-2006
|
4.00
|
Fit Assembled and Match drilled Left Flap
|
Details
|
|
|
12-29-2006
|
3.00
|
Designed and constructed the Flap assembly Jig and
|
Details
|
|
|
12-28-2006
|
3.00
|
Fabricated the Flap angle brackets and ifitted the
|
Details
|
|
|
12-27-2006
|
2.00
|
Install Ailerons to Wings
|
Details
|
|
|
12-26-2006
|
2.00
|
Riveted Gap Seals on the Right wing.
|
Details
|
|
|
12-26-2006
|
2.00
|
Built/Installed Right Outbd Aileron Hinge Assy
|
Details
|
|
|
12-13-2006
|
1.00
|
Riveted the Left Wing Gap Seals
|
Details
|
|
|
12-13-2006
|
2.00
|
Drill, Deburr and Dimple Gap Seals
|
Details
|
|
|
12-11-2006
|
2.00
|
Drill the Flap hinge assy to bottom skin holes.
|
Details
|
|
|
12-11-2006
|
2.00
|
Countersunk bracketts, Riveted assy to wing.
|
Details
|
|
|
12-06-2006
|
2.00
|
Removed the Wing Fixture and cleaned up the area.
|
Details
|
|
|
12-06-2006
|
4.00
|
Installed the Flap Hinges on the wings
|
Details
|
|
|
12-05-2006
|
3.00
|
More Aileron Work
|
Details
|
|
|
12-05-2006
|
1.00
|
Finished up the ailerons!
|
Details
|
|
|
12-04-2006
|
2.00
|
Riveting R Aileron Skins
|
Details
|
|
|
12-04-2006
|
3.00
|
Closing Up Right Aileron
|
Details
|
|
|
12-02-2006
|
10.00
|
Ailerons
|
Details
|
|
|
11-23-2006
|
1.00
|
Rivet Aileron Stiffeners
|
Details
|
|
|
11-22-2006
|
16.00
|
Sorting parts
|
Details
|
|
|
11-16-2006
|
4.00
|
Primed ailerons and flaps.
|
Details
|
|
|
11-13-2006
|
6.00
|
Preped, drilled & Dimpled the Ailerons and flaps
|
Details
|
|
|
03-15-2006
|
5.00
|
Started aileron assembly, drilled and de-burred bo
|
|
|
|
03-15-2006
|
4.00
|
Preped alerons and flaps, removed blue plastic and
|
|
|
|
03-11-2006
|
5.00
|
Cleaned and re-organized the shop to get ready for
|
|
|
|
03-09-2006
|
1.00
|
Took photos of the basic hand tools that I have pr
|
Details
|
|
|
03-09-2006
|
5.00
|
Right wing tank Phase II
|
Details
|
|
|
03-08-2006
|
7.00
|
Riveted Right Top Wing Skin
|
Details
|
|
|
03-08-2006
|
3.00
|
Finished up inserting and taping rivets on Rt top
|
|
|
|
03-07-2006
|
3.00
|
Prepared Right Wing skeleton for leading edge
|
Details
|
|
|
03-07-2006
|
5.00
|
Attached Right Wing Top skin, inserted rivets and
|
Details
|
|
|
03-07-2006
|
4.00
|
Attached Right Wing outboard Leading Edge to Skele
|
Details
|
|
|
03-04-2006
|
7.00
|
Right Wing Prep, Primed Skins & Ribs
|
|
|
|
03-04-2006
|
3.00
|
Assembled Right Wing Leading edge
|
Details
|
|
|
03-01-2006
|
7.00
|
Right Wing prep
|
|
|
|
10-12-2005
|
9.00
|
Received Fuselage and Inventoried
|
|
|
|
09-05-2005
|
6.00
|
Right Wing Prep and assembly
|
|
|
|
07-28-2005
|
9.00
|
Sealing Tanks Phase 1
|
Details
|
|
|
07-05-2005
|
8.00
|
Fitting Right Wing Leading Edge
|
|
|
|
06-30-2005
|
7.00
|
Fit Right Wing skins
|
|
|
|
06-29-2005
|
9.00
|
Assemble Right wing skeleton
|
|
|
|
06-18-2005
|
4.00
|
Riveted Left Wing Top Skins
|
|
|
|
06-09-2005
|
11.00
|
Left wing skin prep & riveting
|
|
|
|
05-12-2005
|
6.00
|
Construct Roll-around wing stand
|
|
|
|
02-09-2005
|
5.00
|
Drilling Left Tank Assy
|
|
|
|
02-08-2005
|
5.00
|
Drill Left tank Assy
|
|
|
|
01-24-2005
|
9.00
|
Fuel Tank assembly Left Wing
|
|
|
|
01-06-2005
|
9.00
|
Leading Edge Assy, Construct Cradle
|
|
|
|
01-06-2005
|
3.00
|
Continue fitting stringers
|
|
|
|
12-30-2004
|
2.00
|
Fitting Span-wise Stringers
|
|
|
|
12-29-2004
|
4.00
|
Fit Left wing skins
|
|
|
|
12-28-2004
|
4.00
|
Assemble Left wing skeleton
|
|
|
|
12-27-2004
|
5.00
|
PrepLeft wing ribs
|
|
|
|
12-27-2004
|
0.50
|
Construct Aileron alignment tool
|
|
|
|
12-25-2004
|
12.00
|
Assemble rear wing spars
|
|
|
|
12-24-2004
|
8.00
|
ID wing spars, Attach Tank attach Platenuts to Spa
|
|
|
|
12-23-2004
|
7.00
|
Built Wing assembly fixture
|
|
|
|
11-18-2004
|
6.00
|
Designed and constructed Pneumatic "C'" press.
|
Details
|
|
|
10-28-2004
|
6.00
|
Finish Elevators
|
|
|
|
10-27-2004
|
10.00
|
Fit Right Elevator to Horz Stab, assemble Left Ele
|
|
|
|
10-14-2004
|
7.00
|
Wings arrived and Inventoried
|
|
|
|
10-14-2004
|
7.00
|
Build trim Tab
|
|
|
|
09-06-2004
|
12.00
|
Building the Right elevator
|
|
|
|
08-17-2004
|
5.00
|
Complete Rudder Assembly
|
|
|
|
08-14-2004
|
9.00
|
Rudder assembly, Trailing edge riveting.
|
Details
|
|
|
08-13-2004
|
7.00
|
Rudder counterweight installation & riveting
|
|
|
|
08-11-2004
|
8.00
|
Rudder Assembly
|
|
|
|
08-11-2004
|
8.00
|
Finish Vert Stab assy.
|
Details
|
|
|
08-07-2004
|
8.00
|
Deburr, Dimple, Prime Vert Stab
|
|
|
|
08-06-2004
|
3.00
|
Drill Rib to Spar attach Holes
|
|
|
|
08-05-2004
|
9.00
|
Drilling Vert Stab
|
|
|
|
08-04-2004
|
7.00
|
Assemble Horizontal Stab
|
|
|
|
08-03-2004
|
8.00
|
Assemble Horizontal Stab
|
|
|
|
08-02-2004
|
7.00
|
Prep and prime Horizontal Stab Parts
|
|
|
|
07-30-2004
|
9.00
|
Prep, Match Drill, Dimple and assemble Horizontal
|
|
|
|
07-10-2004
|
9.00
|
Assemble the Horizontal Stabilizer Skeleton
|
|
|