Safari Helicopter Construction
Work Logs Found: 235
Category Work Time: 1092 Hours
 Date
Hours
Work Log Summary

Details

 08-02-2010
12.00
Main Rotor Tracking and Balancing (cont)
Details
       

 08-01-2010
9.00
Main Rotor Tracking and Balancing
Details
       

 07-18-2010
6.00
Tail Rotor Tracking and Balancing -UPDATED-
Details
       

 07-17-2010
2.00
Dyna Vibe Balancer
Details
       

 07-09-2010
2.00
Transmission Oil Overflow Reservior
Details
     

 07-06-2010
11.00
Putting It Back Together (Part 2)
Details
       

 07-05-2010
7.00
Putting It Back Together (Part 1)
Details
       

 06-01-2010
4.00
Nondestructive Inspection
Details
     

 05-29-2010
4.00
Modification of Fuel Tank Caps
Details
       

 04-17-2010
22.00
Repairs Continue
Details
       

 03-13-2010
2.00
Initial Flight Testing
Details
     

 03-13-2010
2.00
Hard Landing
Details
       

 08-02-2009
4.50
Door Catches
Details
       

 07-31-2009
4.00
Door Vent Installation
Details
       

 07-30-2009
1.00
Door Hardware
Details
       

 07-29-2009
16.00
Door Hardware
Details
       

 07-28-2009
5.00
Door Hardware
Details
       

 07-28-2009
5.50
Door Fabrication
Details
       

 07-27-2009
6.00
Door Fabrication
Details
       

 07-26-2009
1.50
Door Fabrication
Details
       

 06-17-2009
0.00
Trailer mod
Details
       

 05-08-2009
45.00
Factory Checkout & First Hover
Details
       

 02-24-2009
0.00
Airworthiness Inspection
Details
     

 02-01-2009
5.50
Fabricating and Installing Control Locks
Details
       

 01-11-2009
2.00
Cockpit Placards
Details
       

 01-09-2009
3.50
Preparing Ballast Weight
Details
       

 12-18-2008
6.25
Determining Empty Weight
Details
       

 12-13-2008
4.00
Verification of Blade Rigging
Details
       

 10-18-2008
0.50
Tracking Lights
Details
     

 10-11-2008
3.00
Door Sill Edging
Details
       

 10-04-2008
11.50
Rigging the Swash
Details
       

 09-28-2008
1.50
Trailer Skid Clamps
Details
       

 09-12-2008
1.00
Aircraft Cover
Details
       

 09-05-2008
4.00
Installing Cabin Heat Box/Tubing
Details
       

 08-30-2008
1.00
Misc Graphics
Details
       

 08-30-2008
3.00
Cutting Vinyl N-Numbers
Details
       

 08-22-2008
4.50
Fuel Tank Support Tubes
Details
       

 08-15-2008
3.00
Mounting Cabin Heat Box
Details
       

 08-11-2008
4.00
Lever for Ground Handling Wheels
Details
       

 08-09-2008
6.00
Trailer Skid Clamps
Details
       

 08-04-2008
7.50
Installing Carb Heat Selector Box
Details
       

 08-03-2008
2.25
Adding Nutplates to Heat Collector
Details
       

 08-02-2008
3.25
Modification of Heat Collector
Details
       

 07-25-2008
3.50
Rigging the Tail Rotor Controls
Details
       

 07-18-2008
4.50
Rigging the Flight Controls
Details
       

 07-04-2008
4.50
Mounting of Main Rotor Blades
Details
       

 06-29-2008
4.50
Applying Blade Strap Adhesive
Details
     

 06-28-2008
5.50
Initial Static Balance of Blades
Details
       

 06-21-2008
2.00
Static Balance Jig
Details
       

 06-15-2008
4.80
Final Installation of Bubble.
Details
       

 06-14-2008
1.50
Remounted Exhaust
Details
     

 06-07-2008
11.00
Misc. Small Tasks
Details
       

 06-02-2008
3.00
Installation of Interior
Details
       

 06-01-2008
4.50
Applying Blade Leading Edge Tape
Details
       

 05-31-2008
2.50
Painting Ends of Main Blades
Details
       

 05-24-2008
6.00
Installing Blade Tip Caps
Details
       

 05-03-2008
11.00
Final Installation of Tail Rotor Drive Shaft
Details
       

 04-30-2008
2.00
Painting of Tail Rotor Drive Shaft
Details
       

 04-27-2008
4.00
Rigging the Tail Rotor Drive Shaft
Details
       

 04-26-2008
3.50
Preparing Tail Rotor Drive Shaft
Details
       

 04-19-2008
3.50
Installing Tail Rotor Drive Shaft
Details
       

 04-19-2008
3.00
Installing Exhaust System
Details
       

 04-12-2008
3.50
Carb Heat/Filter Box Inlet Hose Adapter
Details
       

 04-06-2008
4.50
Secured Fuel Tank Wire Bundles
Details
       

 04-05-2008
9.00
Installing and Calibrating Fuel Probes
Details
       

 03-29-2008
6.00
Final Wiring
Details
       

 03-23-2008
8.50
Routing Engine Lines
Details
       

 03-22-2008
4.50
Mounting of Oil Sump
Details
       

 03-16-2008
10.00
Installed Ignition Harness
Details
       

 03-15-2008
4.00
Installing Intake Runners and Manifold pressure Li
Details
       

 03-09-2008
2.50
Installing the Intake Manifold Runners
Details
       

 03-09-2008
4.00
Installation of Oil Cooler
Details
       

 03-08-2008
7.50
Main Rotor Pylon Supports
Details
       

 02-17-2008
2.00
Mounting of Carb
Details
       

 02-17-2008
2.25
Installing the Fuel Shut-off Valve and Gascolator
Details
       

 02-16-2008
3.25
Fuel Tank Installation
Details
       

 02-09-2008
2.50
Updated EFIS firmware
Details
       

 02-02-2008
5.00
Wiring Control Sticks
Details
       

 01-21-2008
12.00
Finishing Up Electrical Wiring
Details
       

 01-20-2008
6.00
Installing Electrical Accessories
Details
       

 01-19-2008
4.75
Cutting Seat Belt Openings
Details
       

 01-16-2008
2.00
Installation of Mixture Control
Details
       

 01-16-2008
4.00
First fit of Seats
Details
       

 01-13-2008
3.50
Mounting the Dynon remote Compass
Details
       

 12-22-2007
7.00
Left Side Panel and Cockpit lighting
Details
       

 12-08-2007
4.75
Installed LED Landing Light
Details
       

 12-07-2007
1.00
Received LED Landing Light
Details
       

 11-24-2007
7.00
Lower Center Console Panel Installation
Details
       

 11-24-2007
1.00
Hung Starter Indicator Light
Details
       

 11-23-2007
6.00
Securing Wire Bundles
Details
       

 11-18-2007
2.00
Covering the Anti-torque Pedals
Details
       

 11-17-2007
9.00
Electrical Wiring
Details
       

 10-14-2007
5.50
Mounting of GPS
Details
       

 10-13-2007
1.50
Mounting of XCOM Remote Module
Details
     

 10-08-2007
4.00
Ground Points
Details
       

 10-08-2007
8.00
Connecting Electrical Busses
Details
       

 10-07-2007
6.00
Making battery cables
Details
       

 10-04-2007
1.00
Odyssey Battery Charger
Details
       

 10-01-2007
4.00
Harnesses for Tail light, Strobe and Chip Detector
Details
       

 09-30-2007
6.00
Tail Boom control Cable and Harness
Details
       

 09-29-2007
3.50
Battery Leads
Details
       

 09-16-2007
5.00
Fuel Qty Probe Wiring
Details
       

 09-09-2007
4.00
Soldering Diodes to Warning Indicator lights
Details
       

 09-03-2007
5.00
Wiring Indicator lights
Details
       

 09-02-2007
7.50
Electrical Wiring
Details
       

 09-01-2007
9.00
Adding Fuse Blocks to Instrument Pod
Details
       

 08-24-2007
8.50
Mounting of Instrument Pod
Details
       

 08-23-2007
6.00
Wiring the Center Console
Details
       

 08-22-2007
4.00
Installing the Floorboard and Center Console
Details
       

 08-20-2007
8.00
Mounting of Electrical Components
Details
       

 08-19-2007
11.00
Routing of Electrical/Sensor Wires
Details
       

 08-18-2007
1.50
Ground Bus Assembly
Details
       

 08-17-2007
4.00
Routing of Cabin Heat Ducts
Details
       

 08-12-2007
6.00
Prep and Installation of Engine
Details
       

 08-12-2007
1.50
Checking Fit of Pylon Supports
Details
       

 08-11-2007
2.00
Shimming Fuel Control valve
Details
       

 08-11-2007
4.00
Fuel Shut-off Valve Placard
Details
       

 08-10-2007
4.50
Extension for Fuel Shut-off Valve
Details
       

 07-29-2007
3.00
Starting the Wiring
Details
       

 07-22-2007
4.00
Fuel Tank Clamps
Details
       

 07-21-2007
3.00
Carry All's
Details
       

 07-15-2007
12.00
Final Painting of Detail parts
Details
       

 06-26-2007
3.50
Vacuum Forming Shroud Cut-outs (Part 3)
Details
       

 06-25-2007
4.50
Vacuum Forming Shroud Cut-outs (Part 2)
Details
       

 06-24-2007
3.50
Vacuum Forming Shroud Cut-outs (Part 1)
Details
       

 06-23-2007
6.50
Engine Shroud Cut-outs (Molding)
Details
       

 06-18-2007
4.00
Shroud Cut-outs
Details
       

 06-18-2007
1.00
Control Rod Clearance
Details
       

 06-12-2007
7.00
Installing Transmission
Details
       

 06-11-2007
4.00
Skid Mount Brackets
Details
       

 06-11-2007
6.50
Landing Skid Installation
Details
       

 06-10-2007
8.50
Mounting of Skids
Details
       

 06-09-2007
0.25
Special Tie Wraps
Details
     

 06-09-2007
5.00
First Installation of Engine
Details
       

 06-09-2007
2.50
Ceramic Coating of Exhaust System
Details
       

 06-04-2007
4.50
Installing Ignition Wire Seals In Bottom of Shroud
Details
       

 06-03-2007
5.50
Modification of Bottom Engine Shroud Pieces
Details
       

 06-03-2007
2.50
Determining Routing of Ignition Leads
Details
       

 05-26-2007
2.50
Received Transmissions
Details
       

 05-25-2007
7.50
Engine Cooling Shroud Fitting
Details
       

 05-24-2007
4.50
Oil Sump Cover
Details
       

 05-23-2007
2.00
Checking Valve Cover Welds for Leaks
Details
     

 05-21-2007
2.00
Main Rotor Blades Arrive
Details
       

 05-19-2007
7.00
Engine Valve Cover Modifications
Details
       

 05-12-2007
4.00
Final Painting of Cabin
Details
       

 05-02-2007
4.50
Sanding Instrument Pod
Details
       

 05-02-2007
3.00
Installing Console Switch Panels
Details
       

 04-26-2007
2.00
New Engine Arrives!
Details
       

 04-22-2007
4.50
Switch Console/Instrument Pod Construction
Details
       

 04-21-2007
8.50
Finishing Construction Of The Main Panel
Details
       

 04-17-2007
6.50
Switch Console Panels
Details
       

 04-08-2007
6.00
Instrument Panel Pod Brackets
Details
       

 04-07-2007
4.25
Instrument Panel
Details
       

 03-31-2007
4.50
Continued with Instrument Cutouts on Main Panel
Details
       

 03-25-2007
2.00
Preparing to cut Instrument Panel
Details
       

 03-25-2007
4.50
Cutting the Instrument Panel
Details
       

 03-24-2007
1.00
Protecting Skid Feet from Scratches
Details
       

 03-12-2007
2.50
Installation of VHF Antenna
Details
       

 03-09-2007
1.00
Wiring/connectors
Details
       

 03-09-2007
1.00
Avionics/Electrical Gear
Details
       

 03-09-2007
1.00
Avionics/Electrical Components
Details
       

 03-09-2007
1.00
Avionics Gear
Details
       

 02-24-2007
3.00
Cargo Sling Hook
Details
       

 02-11-2007
1.50
Measuring for Fuel Tank Straps
Details
       

 02-10-2007
1.50
Shims for Eyebrow Panels
Details
       

 02-10-2007
1.00
Cyclic Cutouts
Details
       

 01-28-2007
4.50
Preparing Switch Panels for drilling
Details
       

 01-28-2007
2.50
Main Instrument Panel Layout
Details
     

 01-27-2007
3.25
Painting Misc. Parts
Details
       

 01-20-2007
5.25
Checking Fit of Switch Panel Mockup
Details
       

 01-13-2007
6.00
Designing and Cutting Switch Console Mockup
Details
       

 01-06-2007
4.50
Assembly of Center Switch Console
Details
       

 01-01-2007
3.25
Assembled Ground Handling Wheels
Details
       

 12-04-2006
2.50
Position Lights
Details
       

 12-04-2006
6.00
Fabricated Engine Stand
Details
     

 12-03-2006
0.00
Hard Coating of Skids
Details
     

 12-02-2006
8.50
Installed Door Hinges
Details
       

 11-26-2006
2.00
Door Sill/Bubble Corner Covers
Details
       

 11-26-2006
9.00
Bubble Installation
Details
       

 11-18-2006
4.00
Fitting Panels for Final Riveting
Details
       

 11-18-2006
2.50
Finished Horizontal Stabilizer
Details
       

 11-11-2006
4.50
Installed Tail Rotor Control Links
Details
       

 11-05-2006
3.00
Checking Fit of the Cabin Pieces
Details
       

 11-04-2006
3.25
Final Installation of Flight Controls
Details
       

 11-03-2006
3.25
Final Install of Flight Controls
Details
       

 10-29-2006
6.50
Fabricated Control Tubes
Details
       

 10-15-2006
4.50
Installed New Seat Hinges
Details
       

 10-08-2006
1.50
Located Belly Anti-Collision Strobe
Details
     

 10-08-2006
1.50
Located and installed Pitot Tube
Details
     

 10-07-2006
7.00
More Nutplate Installation
Details
       

 10-02-2006
0.50
Ballast Weight Bracket
Details
     

 10-01-2006
7.00
Installing Floating Nutplates
Details
       

 10-01-2006
3.00
Installed Cabin Sheetmetal
Details
     

 09-30-2006
2.50
Applying Tube Seal
Details
       

 09-27-2006
6.00
Installation of Nutplates.
Details
       

 09-26-2006
2.25
Application of Topcoat
Details
       

 09-25-2006
3.50
Priming of all Detail Parts
Details
       

 09-24-2006
5.75
Pretreatment for Painting
Details
       

 09-24-2006
2.50
Alodining Sheet Metal Parts
Details
       

 09-18-2006
3.00
Vert. Stabilizer
Details
       

 09-18-2006
1.00
Finishing of Frame
Details
       

 09-09-2006
4.50
Horizontal Stabilizer End Cap
Details
       

 09-03-2006
9.00
Construction of Horizontal Stabilizer
Details
       

 09-02-2006
2.00
Honing/Fitting Frame Fittings
Details
       

 09-02-2006
1.50
Front Weight Fitting
Details
       

 08-20-2006
4.00
Masking Frame for sandblasting
Details
       

 08-19-2006
8.00
Preparing for Paint
Details
       

 07-29-2006
3.50
Welding
Details
     

 07-22-2006
1.50
Switch Console Face Plate
Details
     

 07-16-2006
4.00
Instrument Pod & Console
Details
       

 07-08-2006
3.25
Battery Box
Details
       

 07-07-2006
2.50
Cabin Floor Construction
Details
       

 07-06-2006
6.00
Construction of Center Switch Console
Details
       

 07-05-2006
3.50
Bubble Corner Covers
Details
       

 07-03-2006
4.00
Headboard Construction
Details
       

 07-02-2006
6.00
Construction of Switch Console
Details
       

 06-25-2006
8.00
Seat Construction
Details
       

 06-24-2006
3.50
Built & Installed RT. Seat Panel
Details
       

 06-18-2006
4.75
Mounting Instrument Pod
Details
       

 06-17-2006
3.75
Mock-up of Center Switch Console
Details
       

 06-11-2006
8.25
Rear Seat Panel and Center Collective Panel
Details
       

 06-10-2006
4.50
Fabrication of Left Interior Side Panel
Details
       

 06-04-2006
9.00
Interior panel construction
Details
       

 06-03-2006
6.50
Fabricated Belly Panel
Details
       

 05-28-2006
6.50
More cabin sheet metal work
Details
       

 05-27-2006
5.00
Prepared templates/cut front seat panel
Details
     

 05-13-2006
4.25
Worked on repairing fuselage panels
Details
       

 05-07-2006
3.50
Straightening the Tailboom member
Details
       

 05-06-2006
4.25
Fit fuselage panels
Details
       

 03-10-2006
3.25
Applied finishes to detail parts
Details
       

 03-03-2006
2.50
Slider "T's"
Details
       

 02-25-2006
6.00
NDT and Shot Peening
Details
       

 02-24-2006
4.50
Disassembled Cyclic & Collective controls
Details
       

 02-16-2006
1.50
Assembled Cooling Shroud for test fit
Details
       

 02-08-2006
4.00
Received Group #1 Kit
Details
       