Powered By Kitlog Pro v2.0
MICHAEL'S WEB SITE
Cozy IV
All
Work Logs Found:
53
Category Work Time:
283 Hours
Date
Hours
Work Log Summary
Details
11-10-2007
3.00
Glued Leading Edge of Canard Into Jig
11-09-2007
3.00
Set Up Jig and Fit Canard in Place
11-05-2007
2.00
Drilled Holes for Lift Tabs
11-04-2007
6.00
Layed Up "U" section of canard
11-03-2007
6.00
Alagined and Jigged Canard Foam
10-16-2007
4.00
Working On Lift Tab Installation and Foam Jig
10-11-2007
8.00
Install Antennae in Winglets
09-23-2007
8.00
Rudder Layup
09-20-2007
1.00
Sand Bottom Spar Cap
09-18-2007
1.00
Sand Bottom Wing Spar
09-17-2007
1.00
Bottom Wing Spar Cap Sanding
09-14-2007
4.00
Prepping Wing For Bottom Layup
Details
09-13-2007
4.00
Installed COM In Wing
Details
09-08-2007
10.00
Left Wing Bottom Spar Cap Layup
Details
03-10-2007
10.00
Installed Top Wing Layup
Details
03-03-2007
8.00
Installed Top Spar Cap
Details
02-24-2007
8.00
Glassed Bottom of the wing
02-16-2007
2.50
Bottom of Wing Prep for Glassing
Details
12-30-2006
8.00
Installed Antenna inside foam
12-23-2006
8.00
Installed Bottom Spar Cap
12-04-2006
2.00
Bond leading edge of wing to shear web
Details
12-03-2006
8.00
Wing Cap
Details
12-02-2006
5.00
Wing Attach Points
Details
11-11-2006
8.00
Started Jigging and Glueing Wing Cores
Details
11-05-2006
4.00
Wing Jigs Laid out Wings
Details
10-16-2006
8.00
Main Wing Jigs
Details
10-08-2006
3.00
Cut Out Temp. Firewall
Details
10-03-2006
3.00
Fire Wall Cutout
Details
09-17-2006
10.00
Installed Top of Spar Box
Details
09-16-2006
12.00
Worked on Wing Spar, Completed First Layup
Details
09-01-2006
6.00
Spar
Details
08-26-2006
5.00
Building Jig for Spar
Details
07-30-2006
10.00
Hot Wired Canard
Details
04-16-2006
4.00
Prepare Foam For Layup
Details
04-15-2006
4.00
Dished Out Control Stick and Fuel Sight Areas
Details
04-06-2006
2.00
Cut Pieces for Inside Shaping of Fuselage
Details
04-03-2006
3.00
Scrapped Bad Longeriron Parts, Cleaned Epoxy Pump
Details
04-02-2006
12.00
Set Up Longerirons
Details
04-01-2006
6.00
Fuselage Sides, Build Frames and Extended Table
Details
03-26-2006
8.00
Trimmed Instrument Panel and Started on Forms for
Details
03-19-2006
4.00
Continued Work on Instrument Panel and Aft Landing
Details
02-28-2006
3.00
Instrument pnl front and remaining hard points
Details
02-26-2006
6.00
Front Side of Instrument PNL, and Landing Gear Bul
Details
02-23-2006
3.00
Traced Then Layed Out Rear Landing Gear Bulkhead
Details
02-21-2006
2.00
Same as 2/20/06 mirror image layup
Details
02-20-2006
2.00
layed up 22 BID for "hard point" on Landing Gear B
Details
02-18-2006
5.00
Cut Out Instrument Panel and 1st Layup
Details
02-16-2006
3.00
Bulkhead F22 and F28 Trimmed Glass
Details
02-13-2006
5.50
Bulkheads F22 and F28 Last Layup
Details
02-12-2006
5.00
Bulkhead F22 and F28
Details
02-10-2006
4.00
Front Seat Last Layup
Details
02-09-2006
8.00
Front Seat repair
Details
02-08-2006
4.00
Front Seat first layup
Details
SITE NAVIGATION
Contact Builder
Cozy IV Home
Category
# Logs
# Hours
All
53
282
Fuselage
24
110
Wings
29
172
Copyright © 2001-2024 Matronics. All Rights Reserved.