KitLog pro

Powered By Kitlog Pro v2.0

Kenneths Web Site
Work Logs Found: 420
Category Work Time: 1359 Hours
 Date
Hours
Work Log Summary

Details

 08-23-2014
8.00
Installed primer lines,checked and set new spark p

 07-01-2011
6.00
Drilled holes in spinner mounting it to the prop a
Details
       

 06-30-2011
3.00
Mounting the spinner to the prop.
Details
       

 06-30-2011
3.00
Mounted the prop to the aircraft.
Details
       

 06-28-2011
2.00
Fixed the bottom rudder fairing.
Details
       

 06-26-2011
3.00
Working on mounting the pitot tube.
Details
       

 06-25-2011
3.00
Working on the upper cowling.
Details
       

 06-24-2011
4.00
Moved fusalage to airport.
Details
       

 06-18-2011
3.00
Started working on the cowling.
Details
     

 06-13-2011
1.50
Fitting the light strobe combo in the rudder fairi
Details
       

 06-13-2011
4.00
Final fitting of the windshield fairing.
Details
       

 06-05-2011
3.00
Working on the side and rear skirts of the canopy.
Details
       

 06-05-2011
2.00
Smothing out the rear skirt of the canopy.
Details
       

 06-02-2011
2.00
Reinforced elt bracket.
Details
       

 04-27-2011
1.00
Shaped the pitot tube.
Details
       

 03-29-2011
1.00
Sanding on the cowling.
Details
       

 03-28-2011
0.50
New nav lights arrived.
Details
       

 03-28-2011
2.00
Applied duraglass to parts of the cowling.
Details
       

 03-14-2011
3.00
Mounting adel clamps to the motor mount for the wi
Details
       

 03-13-2011
2.00
Making gaskit for my access panels.
Details
       

 03-13-2011
3.00
Installed windshield.
Details
       

 03-06-2011
3.00
Prepareing dash for the windshield instalation
Details
       

 02-07-2011
7.00
Finishing up small items.
Details

 02-05-2011
1.00
Put screws into the egress handles.
Details
       

 02-05-2011
3.00
Made brackets for the sunvisors.
Details
       

 02-05-2011
2.50
Installed the Dynon SV-32 pitch servo.
Details
       

 02-03-2011
3.00
Working on the pitot tube.
Details
       

 02-03-2011
1.50
Installing rivnuts to secure the fairing around th
Details
       

 01-31-2011
2.00
Located the doubler for the second radio antenna.
Details
       

 01-28-2011
2.00
Preparing skirt for fiberglass layup.
Details
       

 01-27-2011
2.00
Working on the canopy skirt to make it a straight
Details
       

 01-25-2011
1.00
Working on the fiberglass skirt on the sliding can
Details
       

 01-24-2011
2.00
Reworking the rear skirt on the canopy.
Details
       

 01-23-2011
3.00
Drilled holes for egress handles, and started work
Details
       

 01-22-2011
2.00
Mounted the sun visors and located the holes for t
Details
       

 01-08-2011
4.00
Sanding and fitting windshield fairing
Details
       

 12-19-2010
5.00
Filling and sanding the windshield fairing
Details
       

 12-06-2010
1.50
Sanding windshield fairing.
Details

 12-04-2010
3.00
Filling in low spots on the front of the windshiel
Details
       

 12-02-2010
3.00
Building up thin spots on thew windshield fairing.
Details

 12-01-2010
3.50
Sanding the windshield fairing.
Details

 11-28-2010
4.00
Started the final trimming of the windshield fairi
Details
       

 11-27-2010
4.00
Trimming the windshield fairing.
Details
       

 11-27-2010
0.50
Hooked up the instrument panel lighting.
Details
     

 11-18-2010
0.50
Removed the ply and peel.
Details
     

 11-17-2010
1.00
Taping off for fiberglass
Details
       

 11-17-2010
4.50
Applied the fiberglass for the windshield fairing.
Details
       

 11-15-2010
4.00
Shimming the windshield.
Details
       

 11-10-2010
3.00
Started attachinhg the windscreen.
Details
       

 11-09-2010
3.00
Sanded ,primed, and painted the glasre shield.
Details
       

 11-09-2010
2.00
Mounted manual primer. Painted instrument overhang
Details
     

 11-09-2010
1.00
Made a templite for the glareshield.
Details
     

 11-05-2010
4.00
Installed crotch belt Bracket.
Details
       

 10-30-2010
4.00
Rivited on the front deck lid.
Details
       

 10-27-2010
3.50
Started installing front deck lid, clamped primer
Details
       

 10-16-2010
4.00
Insulated the bcockpit area.
Details

 10-09-2010
3.50
Ran primer lines.
Details
       

 09-23-2010
10.00
Made the floor.
Details
       

 09-06-2010
1.00
Located and drilled guards for the rudder cables.
Details
       

 09-05-2010
4.00
Ran wireing for the cargo lighyts.
Details

 09-05-2010
4.00
Made brackets and ran wireing for the cargo lights
Details
       

 09-03-2010
3.00
Brackets for brake line and external power line.
Details
       

 08-30-2010
3.50
Made brackets for brake lines and external power g
Details
       

 08-29-2010
5.00
Rewired some of the wiring.
Details
       

 08-29-2010
4.00
Relocating wiring.
Details
       

 08-27-2010
2.00
Ran the shelded wiring for strobes.
Details
       

 08-27-2010
5.00
Mounted strobe and elt bracket.
Details
       

 08-25-2010
3.00
Added a hobbs meter.
Details
       

 08-20-2010
6.00
Added an external power plug.
Details
       

 10-12-2008
4.00
Installed heater cable.
Details
       

 10-08-2008
2.00
Rivited the armrest bracket into place.
Details
       

 10-08-2008
1.50
Made stops for the sliding cvanapy.
Details
       

 10-08-2008
2.50
Installing map lights.
Details
       

 10-08-2008
1.50
Installed the air vents.
Details
       

 10-06-2008
4.00
Tie wrapping wires together.
Details
       

 10-05-2008
4.00
Wiring switches,Painted parts.
Details
       

 10-03-2008
2.00
Finished the armrest barcket.
Details
       

 10-03-2008
3.00
Drilling,mounting, and locating the map light hole
Details
       

 10-02-2008
3.00
Reinforceing the armrests.
Details
       

 10-01-2008
5.00
Running and tieing in wires, making brackets for a
Details

 09-30-2008
4.00
Hooking up wireing to various switches.
Details
       

 09-29-2008
4.00
Putting in switches and lettering the instrument p
Details
       

 09-28-2008
3.00
Changing bolts in venter section.
Details
       

 09-25-2008
1.00
Secured the ignition wires.
Details
       

 09-25-2008
4.00
Painted the instrument panel
Details
       

 09-25-2008
1.00
Mounted the glove box.
Details
       

 09-24-2008
2.00
Finishing the glove box.
Details

 09-23-2008
3.00
Primed the instrument panel, finished glove box.
Details

 09-22-2008
2.00
Preparing instrument for paint.
Details

 09-21-2008
6.00
Working on glove box.
Details
       

 09-18-2008
5.00
Making the glove box and fitting it to the instrum
Details
       

 09-17-2008
1.00
Cutting hole for the glove box, and AP74 auto pilo
Details
       

 09-06-2008
3.00
Cutting holes in the instrument pannel.
Details
       

 09-05-2008
2.00
Running efis wires.
Details
       

 08-31-2008
3.50
Removing instrument panel to cutin the instruments
Details
       

 08-25-2008
1.00
installing warning lights
Details
       

 08-24-2008
3.00
Mounted the oil cooler.
Details
       

 08-16-2008
4.00
Brackets for oil cooler
Details
       

 08-10-2008
1.50
Running the fuel line from my gasolater to the fue
Details
       

 08-10-2008
3.00
Running scat tube to heat muff.
Details
       

 07-29-2008
2.00
Running the ignition leads.
Details
       

 07-29-2008
2.00
Changin the hose clamps.
Details
       

 07-28-2008
2.00
Mounted firewall through hole covers.
Details
       

 07-12-2008
3.00
Mounted the fuelflow valve.
Details
       

 07-11-2008
2.00
Ran wiring for the remote compass.
Details
       

 07-07-2008
3.00
Starter studs instaled.
Details
       

 07-05-2008
2.00
Made a bracketfor the remote compass.
Details

 07-04-2008
4.00
Installed the voltage shunt.
Details
     

 07-03-2008
4.00
Started running all the efis wires through the fir
Details
       

 07-03-2008
3.00
Checked efis wiring continuity.
Details

 07-02-2008
2.00
Installed the carb heat sensor.
Details
       

 07-02-2008
2.00
Dropped of starter for inspection.
Details

 06-30-2008
2.00
EGT wire leads instaled.
Details
       

 06-30-2008
1.00
CHT wires instaled.
Details
       

 04-27-2008
3.00
Fitting the right wingtip.
Details

 04-26-2008
5.00
Had to refit the left wingtip.
Details

 04-19-2008
3.00
Bolting on the rails for the canopy to slide in
Details

 05-18-2007
3.00
Riviting gap seal onto the baffeling.
Details
       

 05-18-2007
2.50
Fittining the exhaust.
Details
       

 05-12-2007
10.00
Finished all the gap seal.
Details
       

 05-11-2007
9.00
Mounting the gap seal.
Details
       

 05-05-2007
6.00
Rivited all the baffeling parts together.
Details
       

 05-03-2007
2.00
Primed all the baffeling parts.
Details
     

 05-02-2007
3.00
Alumnidined all baffeling parts.
Details

 05-01-2007
3.00
Scotch briting all the parts to the baffeling.
Details

 04-30-2007
3.00
Deburing parts
Details

 04-25-2007
2.50
Drilling for the oil cooler.
Details

 04-24-2007
6.00
Cutting the baffeling.
Details

 04-23-2007
2.00
Fitting baffeling
Details

 04-22-2007
8.00
Makeing brackets.
Details

 04-21-2007
10.00
Working on the engine baffeling.
Details

 04-20-2007
2.00
Locating all the baffeling parts.
Details

 04-15-2007
5.00
Mating the top- and lower colwing to each other.
Details
       

 04-15-2007
4.00
Making a bracket to hold the back of the cowling t
Details
       

 04-14-2007
4.00
Fitt upper and lower cowling.
Details
       

 05-21-2006
4.00
Observed my 0-320 run after TDI.
Details
       

 04-03-2006
4.00
Observing engine TDI
Details
       

 03-04-2006
1.00
Run the static line.
Details
       

 03-04-2006
4.00
Riviting the rear turtle deck on.
Details
     

 03-04-2006
3.00
Made and instald brackets for the static line.
Details
       

 03-04-2006
3.00
Drilling the wing gap fairings
Details
       

 03-03-2006
3.00
Mounted the left flap bracket.
Details
       

 03-02-2006
3.00
Mounted the right flap bracket.
Details

 03-01-2006
3.00
Drilled the fuel tank attach brackets.
Details
       

 02-28-2006
5.00
Drilled both rear spars.
Details
       

 02-27-2006
2.00
Had wing demention inspected before I drilled rea
Details
     

 02-26-2006
1.00
Installing static line on bulkhead.
Details
       

 02-25-2006
1.50
Setting the sweep on the wings.
Details
       

 02-25-2006
3.00
Set the wing incidence.
Details
       

 02-25-2006
2.50
Mounted the empennage.
Details
       

 02-24-2006
2.00
Mounted both wings.
Details
       

 02-19-2006
0.50
Mounting the cylonide doubler plate.
Details
     

 02-19-2006
2.00
Makeing the stick boot rings.
Details
       

 02-19-2006
2.50
Makeing attach brackets.
Details
       

 02-18-2006
2.00
Makeing the cylinoid doubler plate.
Details
       

 02-18-2006
2.00
Building the battery hold down bar.
Details
       

 02-17-2006
3.00
Built battery box.
Details
       

 02-12-2006
0.50
Installed fittings into the brake cylinders.
Details
       

 02-12-2006
4.00
Cleaned shop.
Details

 02-11-2006
1.00
Putting the gear on the plane.
Details
       

 02-11-2006
1.00
Putting in rudder cables.
Details
       

 02-11-2006
0.50
Primed the large elevator tube.
Details
       

 02-11-2006
3.00
Greasing bearings, mounting the front wheel.
Details
       

 02-10-2006
2.00
Priming landing gear parts.
Details
       

 02-10-2006
2.00
Drilled holes in the firewall.
Details
       

 02-09-2006
2.00
Finished the manual trim bracket.
Details
       

 02-08-2006
2.00
Working on the manual trim handle.
Details
       

 02-05-2006
3.00
Mounted and rivited the rudder bracket and the fir
Details
       

 02-05-2006
3.00
Located,drilled,and clecoed the fresh air NACA ven
Details
       

 02-04-2006
8.00
Drilling and fitting the sub panal and rollbar.
Details
       

 02-03-2006
3.00
Fitting the subpanel and rollbar..
Details
       

 02-01-2006
2.00
Finished the fuel lines.
       

 01-31-2006
3.00
Hooking up the fuel valve
       

 01-26-2006
1.50
Ran the right brake line and the right side vent l
       

 01-24-2006
2.00
Ran a brake and vent line.
       

 01-23-2006
1.00
Drilled the motor mount to the firwall.
       

 01-22-2006
1.50
Put in the fuel and brake line fittings.
       

 01-21-2006
1.50
Fit the front landing gear, put tires together.
       

 10-07-2005
12.00
Removed a wall in the workshop.
Details
       

 09-30-2005
3.00
Picked up the engine.
Details
       

 09-28-2005
5.00
Rivited forward and aft canopy covers.
Details
       

 09-26-2005
8.00
Fit debured and primed flap bracket and cover
Details
       

 09-25-2005
3.00
Installed the rudder.
Details
       

 09-25-2005
8.00
Fit the landing gear legs to the landing gear brac
Details

 09-24-2005
1.50
Made the large pushrod.
Details
       

 09-24-2005
1.50
Made small pushrod.
Details
       

 09-24-2005
6.00
Instaling the vertical stabelizer.
Details
       

 09-23-2005
4.00
Working on the stabelizer.
Details
       

 09-22-2005
4.00
Drilled the elevater horns.
Details
       

 09-18-2005
6.00
Fit debured and primed the center cabin covers.
Details

 09-02-2005
2.00
Riviting on the steps.
       

 09-01-2005
1.00
Putting in the cotter pins for the brake pedals an
       

 08-31-2005
3.00
Riviting the seats together.
       

 08-31-2005
2.00
Riviting the front braces on.
       

 08-31-2005
2.50
riviting the bulkhead to the rear deck and the rea
       

 08-29-2005
3.00
Finished priming all the existing parts.
       

 08-28-2005
5.00
Alodined and primed several parts for the interior
       

 08-20-2005
8.00
Deburing and cleaning parts.
Details

 08-19-2005
3.50
Finishing some riviting up on the lower fuselage.
       

 08-18-2005
2.50
Getting upper fuselage ready for deburing.

 08-17-2005
4.50
Disassemble upper fuselage for debure and prime

 08-15-2005
2.50
Disassembling upper fuselage.
Details

 08-14-2005
5.00
Finished the seats,mounted the seat pans, finished
Details
       

 08-13-2005
10.00
Built the seats.
Details
       

 08-12-2005
3.50
Fitting the steps,elevator control, and luggage w
Details
       

 08-08-2005
2.00
Installing the step kits.

 08-07-2005
1.00
Debured , primed and rivited the elevator control
       

 08-07-2005
4.00
Cut and mounted the stifners and the fuselage skin
Details
       

 08-06-2005
5.00
Mounted the rudders and brake pedels.
       

 08-06-2005
0.50
Made and mounted the seat belt brackets.
Details
       

 08-06-2005
1.50
Drilled and clecoed the front firewall brackets.
       

 08-05-2005
3.00
Squared the fuselage and drilled the rear deck pla
Details
       

 07-30-2005
5.50
Finished bucking rivitson the lower fuselage.

 07-25-2005
1.00
Bucking rivits on the bottom forward section of th

 07-24-2005
3.00
Putting rivits in holes and building the saw bucks
Details
       

 07-23-2005
3.00
Riviting the front floor skin on.
       

 07-22-2005
2.00
Riviting the forward side skins on.
       

 07-21-2005
2.00
Riviting the forward fuselage skins on.

 07-20-2005
1.50
Started riviting the forward fuselage skins on.
Details
       

 07-19-2005
2.00
Rivited the brake peddles together.
Details
       

 07-18-2005
12.00
Primed and reassembled forward fuselage.
Details
       

 07-16-2005
10.00
Priming and reassembly
Details
     

 07-15-2005
4.00
Cleaning forward fuselage parts.
Details

 06-26-2005
7.00
Deburing fuselage parts.
Details
       

 06-25-2005
5.00
Deburing and counter sinking parts.
Details
     

 06-24-2005
7.00
Counter sinking parts.
Details

 06-21-2005
3.00
Deburing parts.
Details

 06-20-2005
3.00
Disasembled fuselage.
Details

 06-18-2005
5.00
Located landing gear mounts.
Details
       

 06-16-2005
1.50
Fitting the luggage compartment ribs.
Details

 06-15-2005
2.00
Working on the rudder pedals.
Details
       

 06-13-2005
4.00
Fitted front fuselage braceing.
       

 05-31-2005
1.50
Locating the lower short langerons.
Details
       

 05-31-2005
3.00
Cutting holes in center section.
Details
       

 05-30-2005
4.00
Drillling side pannels.
Details
       

 05-21-2005
6.00
Drilling the side skins.
Details
       

 05-21-2005
5.00
Attaching the center section.
Details
       

 05-20-2005
2.00
Finished riviting the center section.
Details
     

 05-19-2005
2.00
Riviting the seat ribs.
Details
       

 05-18-2005
4.00
Fitting the seat pans to the seat ribs.
Details
       

 04-28-2005
5.00
Teardown of the center section.
Details
       

 04-23-2005
4.00
Working on the center fuselage bulkhead.
Details
       

 04-22-2005
3.00
Fitting longerons to the rear fuselage.
Details
       

 04-21-2005
8.00
Bending Longerons
Details
       

 04-13-2005
4.00
Riviting the aft fuselage.
Details
       

 04-13-2005
2.00
Drilled out center section skin.
Details
     

 04-12-2005
4.00
Fitting the outer ribs.
Details
       

 04-11-2005
2.00
Making shims and working on ribs.
Details
       

 04-11-2005
2.00
Building the seating section.
Details
       

 04-10-2005
6.00
Building the 705A bulkhead
       

 04-09-2005
4.00
Debured and primed parts.
Details
       

 04-09-2005
2.00
cutting the 605-c bar doubler.
Details
       

 03-25-2005
6.00
Started riviting the rear fuselage.
Details
       

 03-24-2005
4.00
Alodined and primed parts.
Details
       

 03-22-2005
2.50
Dimpling rear fuselage parts.
Details
       

 03-20-2005
1.00
Rudder stop
Details
       

 03-20-2005
2.00
Match drilling rear fuselage.
Details
       

 03-20-2005
2.00
Deburing and dimpling parts.
Details
       

 03-19-2005
2.00
Trimming support J channels.
Details
       

 03-19-2005
4.50
Preping parts for primer.
Details
       

 03-19-2005
5.00
Match drilling holes to the J channels.
Details
       

 03-19-2005
4.00
Clecoed skins to the bulkheads.
Details
       

 03-17-2005
5.00
Deburing parts.
Details

 03-14-2005
1.50
Drilling shims for the 705 bulkhead.
Details
       

 03-13-2005
1.00
Maiting stifner and bulkhead tohether.
Details
       

 03-13-2005
1.50
Fabrcated the tiedown bracket.
Details
       

 03-13-2005
2.00
Building the 711 bulkhead.
Details
       

 03-12-2005
0.50
Fitting the bulkhead parts.
Details
     

 03-12-2005
1.50
Fitting the 706 bulkhead parts.
Details
       

 03-11-2005
4.00
Deburing several parts.
Details
     

 03-10-2005
1.00
Riviting on nut plates on the center sec
Details
       

 03-10-2005
2.00
Preparing the seat braceing.
Details
       

 03-09-2005
2.50
Riviting the side plates onto the center
       

 03-09-2005
2.00
Preparing control arm brackets.
Details
       

 03-08-2005
1.00
Enlarging holes for snap bushings.
       

 03-07-2005
4.00
Finished the firewall started center sec
Details
       

 03-06-2005
3.00
Riviting the braceing to the firewall.
       

 03-05-2005
1.00
Priming all the firewall braceing.
       

 03-05-2005
2.50
Dimpling the firewall.
Details
       

 03-04-2005
2.50
Made fuel pump doubler.
Details
       

 03-03-2005
2.00
Drilling matching holes in the firewall.
Details
     

 03-02-2005
2.50
Braceing the firewall.
Details
       

 03-01-2005
1.50
Fabricating firewall brackets.
Details
       

 02-26-2005
2.00
Built shelving to hold the fuselage part

 02-15-2005
2.00
Sorting bolts.
Details

 02-13-2005
5.00
Inventoring the fuselage parts.
       

 02-12-2005
6.00
Unpacking the fuselage boxes.
       

 02-08-2005
2.00
Picked up fuselage from ABF in Lima.
Details
       

 02-01-2005
1.00
Finished riviting the skin on.
Details
       

 01-24-2005
2.00
Started riviting the skin on.
Details
       

 01-23-2005
3.00
Dimpling and priming.
Details
       

 01-22-2005
2.50
Match drilling.
Details
       

 01-02-2005
5.00
Working on the frame.
Details
       

 01-01-2005
4.00
Drilled and primed the main spar.
       

 12-31-2004
4.00
Setting up my new air compressor.
Details
     

 11-27-2004
6.00
Cleaning the shop.
Details
       

 11-21-2004
5.00
Preparing for the arrival of the fusalag
Details

 11-20-2004
3.00
Finished the wing cradle.
Details
       

 11-18-2004
3.00
Building a jig to hold the finished wing
Details
     

 11-16-2004
2.50
Fitting the left wing tip.
       

 11-15-2004
0.50
Finished riviting the bottom skins.
     

 11-14-2004
2.50
Riviting the bottom skin on.

 11-13-2004
2.00
Riviting the bottom skin on.

 11-07-2004
2.00
Fitting the lens to the leading edge.
       

 11-06-2004
1.00
Preparing the leading edge for the light
       

 11-06-2004
1.40
Makeing the mounting bracket.
       

 11-05-2004
1.50
Riviting bottom skins on.
     

 11-05-2004
2.50
Putting a light into the leading edge.
Details
       

 11-03-2004
2.00
Finished on the first of the lower skins
     

 11-02-2004
1.50
Riviting bottom skin on.
       

 10-31-2004
1.50
Sealed the fuel sending units.
Details
       

 10-31-2004
0.50
Drilled 2-1/4 hole in the wingtip ribs.
       

 10-27-2004
2.00
finished the bottom skins.
Details
     

 10-24-2004
2.00
Fitting the right wingtip.
Details
       

 10-20-2004
4.00
Riviting the lower skins on.

 10-17-2004
4.50
Riviting the bottom skin on.
Details
       

 10-16-2004
2.50
Riviting the bottom skins on.
Details
       

 10-15-2004
1.00
Cleaned clecoes.
Details
     

 10-14-2004
1.00
Pro sealed electrical conduit .
       

 10-13-2004
2.00
Bolting the fuel tanks to the spar.
       

 10-12-2004
2.00
Bolting tankes to the wing spar.
       

 10-11-2004
1.50
Primed back of fuel tanks.
Details
       

 10-10-2004
2.00
Checking tanks for leaks.
Details
     

 10-06-2004
5.00
Rivited the rear baffel on the left tank
Details
       

 10-04-2004
1.00
Cleaned pro seal off of clecoes.
Details

 10-03-2004
5.00
Mounting the rear baffel.
Details
       

 09-30-2004
4.00
Setting ailerons to the neutral posetion
Details
       

 09-29-2004
2.00
Fitting the floats in the fuel tanks..
Details
       

 09-28-2004
4.00
Setting the vent lines.
Details
       

 09-19-2004
3.00
Installed gap fairings.
Details
       

 09-10-2004
1.50
putting in vent lines.
Details

 09-10-2004
1.00
Finished riviting the wing
Details

 09-06-2004
7.00
Riviting top skins on.
Details
       

 09-05-2004
3.00
Riviting the gap fairings on.
Details
       

 09-05-2004
4.00
Riviting on the leading edge.
Details
       

 09-04-2004
3.00
Primed parts.
Details
       

 09-04-2004
3.00
Finished the push pull tubes.
Details
       

 09-03-2004
3.00
Preparing skins for primer
Details
     

 09-03-2004
5.00
Drilling the control rods.
Details
       

 09-02-2004
5.00
Dimpling wing skins.

 08-26-2004
2.50
Deburing and dimpling wing skins.
Details
       

 08-25-2004
8.00
Drilled and dimpled skins and ribs.
Details
       

 08-22-2004
2.00
Fuel tank endplate.
Details
       

 08-21-2004
4.00
Working on the ribs.

 08-15-2004
3.00
Rivited the ribs to the rear spar.
     

 08-14-2004
2.00
Rivited the ribs to the main spar.
     

 08-13-2004
2.00
Rivited the flap brackets to the ribs.
       

 08-11-2004
4.00
Drilled flap brackets.
Details

 08-10-2004
3.00
Worked on ribs and main spar.
Details

 08-09-2004
1.00
Worked on ribs.
Details

 08-08-2004
2.50
Finished riviting the top skins on.
Details

 08-07-2004
4.00
Riviting the top skins on.
       

 08-06-2004
2.00
Riviting the top skins on.

 07-31-2004
4.00
Riviting & sealing the ribs.

 07-30-2004
3.00
Riviting & sealing the ribs.

 08-09-2003
4.00
Getting tank ready for riviting.

 05-25-2002
5.00
Riviting and sealing the ribs.
Details
       

 05-25-2002
2.00
Dimpled and rivited left leading edge.
Details
       

 05-24-2002
3.00
Sealing the drain and filler cap.
Details
       

 05-22-2002
3.00
Sealing the filler cap, and drain valve.
Details
       

 05-21-2002
3.00
Fitting fuel tank parts.
Details
       

 05-20-2002
3.00
Drilling skins the the ribs.
Details
       

 04-14-2002
1.50
Sealing the end rib of the fuel tank.
Details
       

 04-14-2002
1.50
Sealing the end rib of the fuel tank.
Details
       

 04-12-2002
2.00
Working on the splice for the left wing.
Details
       

 04-12-2002
2.00
Clecoed and drilled the leading edge.
Details
       

 04-11-2002
1.50
Clecoeing and drilling the left fuel tan
Details
       

 04-10-2002
1.50
Drilling a clecoeing the leading edge.
Details
       

 03-29-2002
3.00
Dimpling wing parts.
Details
       

 03-29-2002
2.00
Deburing the skins.
Details
       

 03-20-2002
5.00
Worked on the leading edge.
Details
       

 03-18-2002
1.50
Scuffing the fuel tank for pro seal.
       

 03-18-2002
1.50
Riviting the leading edge.

 03-17-2002
3.00
Debured and dimpled the wing frame.
Details
       

 03-16-2002
1.50
Debured and dimpled fuel tank parts.
       

 03-16-2002
3.00
Debured and dimpled the leading edge.
Details
       

 03-15-2002
4.00
Debured and primed several wing parts.
       

 03-13-2002
1.00
Working on the cover for the fuel tank.
Details
       

 03-13-2002
4.00
Debured and primed several wing parts.
Details
       

 03-13-2002
1.50
Cut and fit the left cover plate for the
Details
       

 03-12-2002
3.00
Working on the right fuel tank.
Details
       

 03-11-2002
4.00
Working on the right fuel tank.
Details
       

 03-10-2002
4.50
Made the angle bracket and nose stiffner
Details
       

 03-03-2002
4.00
Deburing and dimpling some of the skins.

 03-01-2002
2.00
Primed parts
Details

 02-28-2002
4.00
Right fuel tank.Checked wing twist.
Details
       

 02-28-2002
4.00
Clecoed and drilled the leading edge.
Details
       

 02-27-2002
11.00
Fitting the top and bottom skins.
Details
       

 02-26-2002
9.00
Setting up wing skeleton
Details
     

 02-25-2002
5.00
Finished priming all the ribs.

 02-25-2002
4.00
Assembled the ribs.
Details

 02-23-2002
2.00
Primed and rivited right rear spar.
Details

 02-23-2002
4.00
Drilled debured and rivited the spar
Details
       

 02-23-2002
2.00
Debured and primed wing ribs.
       

 02-22-2002
6.00
Working on the right rear spar.
Details
       

 02-21-2002
2.00
Started deburing the right rear spar.
Details
       

 02-21-2002
2.00
Made a work table
Details

 02-21-2002
1.50
Finished the right aileron.
Details

 02-21-2002
2.50
Counter sinking spar for #6 screw.
Details
       

 02-21-2002
2.00
Counter sinking for #6 screws.
Details
     

 02-20-2002
6.00
Finish riviting the left aileron.
Details

 02-19-2002
4.00
Started the right aileron.
Details

 02-19-2002
2.00
Finished right aileron
Details

 02-17-2002
4.50
Starting final assemble on the aileron.
       

 02-17-2002
3.00
Drilling matched holes on the aileron.
Details
       

 02-16-2002
1.50
Dimpling aileron parts.
       

 02-15-2002
2.00
Riviting the right flap.
       

 02-15-2002
2.00
Finished the right flap.
Details
       

 02-13-2002
6.00
Doing finish work on the right flap.
     

 02-11-2002
2.50
Priming parts for the right flap.

 02-10-2002
6.00
Cleaning up parts to the right flap.
Details
       

 02-09-2002
2.50
mounting the angleiron jig for the flaps
Details
       

 02-08-2002
8.00
Final assembly of the left flap
Details
       

 02-05-2002
12.00
Working on the right flap.
Details
       

 02-04-2002
8.00
Working on the left flaps.
Details
       

 02-02-2002
8.00
Debured and primed parts.
Details

 01-31-2002
6.00
working on ailerons
Details

 01-27-2002
3.00
Fitting Rib stifners to left aileron
Details
       

 01-26-2002
8.00
Cleaned shop

 10-12-2001
6.00
Unpacked Empennage and wings
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.