Date
|
Hours
|
Work Log Summary
|
Details
|
04-01-2013
|
10.00
|
Brakets and Vetterman pipes from Van's
|
Details
|
|
|
03-18-2013
|
25.00
|
Baffle, oil return lines, carb heat, etc
|
Details
|
|
|
12-31-2012
|
50.00
|
Continue working on the Cowling/Airbox
|
Details
|
|
|
08-08-2012
|
20.00
|
Baffling and cowl
|
Details
|
|
|
07-16-2012
|
3.00
|
trim baffling
|
Details
|
|
|
07-16-2012
|
2.00
|
filing
|
Details
|
|
|
07-14-2012
|
30.00
|
Cowling work/skybolts
|
Details
|
|
|
06-01-2012
|
20.00
|
Wheel pants, canopy, fairing work
|
Details
|
|
|
05-14-2012
|
3.00
|
Filing
|
Details
|
|
|
05-11-2012
|
5.00
|
Cowl Fitting
|
Details
|
|
|
05-07-2012
|
30.00
|
Cowling Work
|
Details
|
|
|
04-23-2012
|
20.00
|
Cowling and baffling
|
Details
|
|
|
03-24-2012
|
14.00
|
Cowl and baffling
|
Details
|
|
|
03-21-2012
|
2.00
|
Baffling and Cowl work
|
Details
|
|
|
03-20-2012
|
9.00
|
Riveting and completing the oil cooler opening
|
Details
|
|
|
03-14-2012
|
22.00
|
Baffling work/oil cooler
|
Details
|
|
|
02-23-2012
|
8.00
|
Baffles and gear fairings
|
Details
|
|
|
02-16-2012
|
2.00
|
Mounted engine with the help of Tom Witt A&P
|
Details
|
|
|
02-14-2012
|
0.50
|
Order fiberglass intersecting fairing today.
|
Details
|
|
|
02-13-2012
|
2.50
|
gear leg fairing triming and cutting
|
Details
|
|
|
02-11-2012
|
10.00
|
Panel and gear fairing.
|
Details
|
|
|
02-01-2012
|
3.00
|
worked on panel
|
Details
|
|
|
02-01-2012
|
15.00
|
Front gear, panel and piano hinge
|
Details
|
|
|
01-19-2012
|
6.00
|
Panel work and front gear.
|
Details
|
|
|
01-19-2012
|
5.00
|
install landing gear
|
Details
|
|
|
01-06-2012
|
8.00
|
Working on brakes, tires, axle, and more
|
Details
|
|
|
12-30-2011
|
2.00
|
Nose gear
|
Details
|
|
|
12-28-2011
|
2.50
|
Front landing gear.
|
Details
|
|
|
12-27-2011
|
120.00
|
Mtr mount/painting inside fuselage/drilling axle/c
|
|
|
|
12-27-2011
|
12.00
|
intalling tires/brakes/fairings/drilling cotter pi
|
Details
|
|
|
12-27-2011
|
5.00
|
0-320 lycoming E2A
|
Details
|
|
|
03-09-2011
|
3.00
|
Tap 6/32 screws in roll bar.
|
Details
|
|
|
03-09-2011
|
4.00
|
drilling back window
|
Details
|
|
|
03-02-2011
|
10.00
|
Fitting back window.
|
Details
|
|
|
02-15-2011
|
20.00
|
Canopy work
|
Details
|
|
|
11-03-2010
|
20.00
|
Canopy cutting and triming
|
Details
|
|
|
10-15-2010
|
30.00
|
Fitting canopy
|
Details
|
|
|
07-18-2010
|
8.00
|
Tipup work
|
Details
|
|
|
07-15-2010
|
50.00
|
dr handle, tipup, etc
|
Details
|
|
|
07-15-2010
|
3.00
|
conecting pins for the tipup, jettson
|
Details
|
|
|
06-12-2009
|
30.00
|
Install wings on fuselage
|
Details
|
|
|
06-11-2009
|
20.00
|
Flaps and Ailerons
|
Details
|
|
|
03-13-2009
|
10.00
|
Wing tips, fuel line and ctr forward floor panel
|
Details
|
|
|
02-16-2009
|
9.00
|
Right wing tip
|
Details
|
|
|
02-11-2009
|
10.00
|
Left and right wing tip work.
|
Details
|
|
|
02-06-2009
|
2.50
|
aft rib and installing the tip on wing.
|
Details
|
|
|
02-05-2009
|
1.00
|
Aft rib cut for installing,
|
Details
|
|
|
01-31-2009
|
2.00
|
left wing tip
|
Details
|
|
|
01-30-2009
|
2.00
|
Left tip
|
Details
|
|
|
01-29-2009
|
4.00
|
|
Details
|
|
|
01-27-2009
|
1.00
|
Sanding and triming
|
Details
|
|
|
01-25-2009
|
12.00
|
Wing Tip Left side
|
Details
|
|
|
01-23-2009
|
3.00
|
Wing tip prep
|
Details
|
|
|
01-18-2009
|
10.00
|
Forward aft top skin
|
Details
|
|
|
12-15-2008
|
2.00
|
Forward aft top skin
|
Details
|
|
|
12-07-2008
|
6.00
|
Fuselage and Wings
|
Details
|
|
|
12-05-2008
|
1.00
|
Fuselage and wings
|
Details
|
|
|
11-30-2008
|
2.00
|
Tail light wiring rudder
|
Details
|
|
|
11-25-2008
|
20.00
|
Work on a number of different items inside the fus
|
Details
|
|
|
09-29-2008
|
1.00
|
Floor baggage compartment
|
Details
|
|
|
09-28-2008
|
8.00
|
steps and baggage floor opening for Whelan's Flash
|
Details
|
|
|
08-25-2008
|
20.00
|
Fuselage misc work
|
Details
|
|
|
06-12-2008
|
8.00
|
Battery box
|
Details
|
|
|
05-14-2008
|
10.00
|
Rivet down the ctr floor in fuselage and wired the
|
Details
|
|
|
05-02-2008
|
4.00
|
Fuselage work
|
Details
|
|
|
04-30-2008
|
10.00
|
Pushrods to elevator and drilling final wholes VS.
|
Details
|
|
|
04-22-2008
|
4.00
|
Painting parts
|
Details
|
|
|
04-20-2008
|
3.00
|
Rudder attachment and counter sinking rudder stops
|
Details
|
|
|
04-17-2008
|
2.00
|
Rudder
|
Details
|
|
|
04-16-2008
|
3.00
|
Drilling aft spar through bulk head.
|
Details
|
|
|
04-15-2008
|
1.50
|
Drilling forward bracket VS
|
Details
|
|
|
04-14-2008
|
3.00
|
VS attachment
|
Details
|
|
|
04-10-2008
|
3.00
|
HS attachment.
|
Details
|
|
|
04-09-2008
|
3.00
|
HS & elevator attachment
|
Details
|
|
|
04-07-2008
|
10.00
|
HS and small amount of fuselage work
|
Details
|
|
|
03-27-2008
|
10.00
|
HS, Elevator and Fiberglass
|
Details
|
|
|
03-27-2008
|
10.00
|
Brakeline and trim tab
|
Details
|
|
|
03-13-2008
|
5.00
|
pushrods and HS work
|
Details
|
|
|
03-05-2008
|
2.00
|
Flaps, pushrod and HS tips
|
Details
|
|
|
03-04-2008
|
2.00
|
Aileron pushrods are 3/4 inch too long.
|
Details
|
|
|
03-03-2008
|
8.00
|
Fiberglass and aileron
|
Details
|
|
|
02-29-2008
|
1.00
|
Attachment work bearing to rear spar HS
|
Details
|
|
|
02-28-2008
|
3.00
|
Elevator/HS filing.
|
Details
|
|
|
02-27-2008
|
2.00
|
Filing counter weight on Rt Elevator
|
Details
|
|
|
02-26-2008
|
4.00
|
HS and Elevator matching.
|
Details
|
|
|
02-22-2008
|
1.50
|
Rudder lower tip
|
Details
|
|
|
02-20-2008
|
3.00
|
Rudder fiberglass tip work
|
Details
|
|
|
02-19-2008
|
15.00
|
Lower skin and wing tips
|
Details
|
|
|
02-06-2008
|
10.00
|
Wings and foward fuselage
|
Details
|
|
|
01-31-2008
|
25.00
|
fitting and drilling subpanel seal, forward top sk
|
Details
|
|
|
01-25-2008
|
5.00
|
Forward skin and subpanel ribs
|
Details
|
|
|
01-22-2008
|
6.00
|
Drilling 3/4 inch holes in wings ribs for flex tub
|
Details
|
|
|
01-15-2008
|
5.00
|
Trim Tab
|
Details
|
|
|
01-14-2008
|
8.00
|
panel forward work
|
Details
|
|
|
01-11-2008
|
6.00
|
Small angles on panel work
|
Details
|
|
|
01-09-2008
|
3.00
|
703B drilling
|
Details
|
|
|
01-08-2008
|
5.00
|
F-703B work for panel
|
Details
|
|
|
01-07-2008
|
10.00
|
F-703B Angle for panel bracket.
|
Details
|
|
|
01-04-2008
|
5.00
|
Forward fuselage works
|
Details
|
|
|
01-02-2008
|
15.00
|
installing brake lines and many other items
|
Details
|
|
|
12-16-2007
|
8.00
|
intalling the fuel lines in to final resting place
|
Details
|
|
|
12-14-2007
|
2.00
|
fuel line left tank
|
Details
|
|