Quentin’s Vision EX 229
Work Logs Found: 288
Category Work Time: 978 Hours
 Date
Hours
Work Log Summary

Details

 07-30-2008
2.00
unbagged and cleaned up mold and set up
Details

 07-27-2008
5.50
bagged inner bid and foam for second lower left
Details

 07-26-2008
3.50
bagged outer glass for second lower left wing skin
Details

 07-24-2008
2.00
finished building new wing skin mold
Details

 07-23-2008
1.00
worked building new wing skin mold
Details

 07-22-2008
1.50
started building new wing skin mold
Details

 07-21-2008
2.00
removed 1st left skin from mold and cleaned up
Details

 07-20-2008
5.00
bagged inside bid and foam panels on left in
Details

 07-19-2008
5.00
bagged outer skin on left inboard lower skin
Details

 07-18-2008
3.00
finished mold and cut material for 1st lower left
Details

 07-16-2008
2.50
worked on for mold on 1st lower left wing skin
Details

 07-14-2008
2.50
prepped for mold on 1st lower left wing skin
Details

 07-12-2008
3.00
filleted and taped rib/spar joints on left wing
Details

 07-09-2008
3.00
left wing marked leading edge slot curves, cleaned
Details

 07-06-2008
2.00
finished move back home
Details

 07-05-2008
4.00
moved home from Bill's
Details

 07-01-2008
2.00
Transposed leading edge slot templates to right
Details

 01-02-2008
2.50
trimmed and cleaned jig and glassed in third rod p
Details

 01-01-2008
1.50
glassed in second rod packets for center spar
Details

 01-01-2008
3.50
Cleaned up jig and cut bid for the center spar sec
Details

 12-31-2007
3.00
prepped jig and glassed in first rod packets for c
Details

 12-30-2007
2.00
prepped and leveled and squared jig for center spa
Details

 12-29-2007
6.00
cut and made lower center carbon packets and built
Details

 12-26-2007
2.00
built 2 packet of carbon rod for upper center sect
Details

 12-25-2007
4.00
Built mold, cut carbon rod for upper center secti
Details

 12-25-2007
4.00
built 2 packet of carbon rod for upper center sec
Details

 12-18-2007
2.00
worked on mounting axels to landing gear
Details

 12-17-2007
3.50
worked on mounting axels to landing gear
Details

 12-12-2007
3.00
drilled and floxed on outer phenolics for axels
Details

 12-08-2007
2.50
made and installled rubber cushions and lower pheo
Details

 12-05-2007
2.00
Made phenolic spacers for axle attachment wt 21.5
Details

 12-01-2007
1.50
sanded
Details

 11-30-2007
1.50
sanded and filled
Details

 11-29-2007
1.50
filled and sanded
Details

 11-28-2007
2.00
filled and sanded
Details

 11-27-2007
1.50
filled and sanded
Details

 11-26-2007
1.50
Filled and sanded
Details

 11-25-2007
3.00
filled and sanded
Details

 11-24-2007
5.00
Filled and sanded
Details

 11-23-2007
1.00
Trimmed LG legs
Details

 11-23-2007
2.00
sanded and filled
Details

 11-22-2007
2.00
foamed in fairing for tailwheel assembly
Details

 11-22-2007
1.00
Filled LG with micro for sanding
Details

 11-22-2007
3.00
cleaned out brake line conduits and finished floxi
Details

 11-21-2007
2.00
alligned and floxed gear phenolics on LG
Details

 11-18-2007
2.00
made and installed phenolic hardpoints for LG moun
Details

 11-17-2007
3.00
prepped mounting of landing gear
Details

 11-14-2007
2.50
made straps for LG hold down
Details

 11-13-2007
2.00
installed fiberfax and stainless firewall

 11-05-2007
2.00
cut and fit stainless firewall
Details

 11-04-2007
4.50
aligned and drilled motormount bplt holes, fit and
Details

 11-02-2007
1.00
trimmed cowling flange and prepped side s od forwa
Details

 10-31-2007
1.50
trimmed and sanded upper motor mounts
Details

 10-30-2007
3.50
installed and glassed 4 bid on cowling flanges
Details

 10-21-2007
2.50
made sft's for cowling flange
Details

 10-20-2007
1.00
prepped formica for cowling flange sft
Details

 10-18-2007
2.50
2 bid tapes on inside corners of forward deck
Details

 10-17-2007
4.50
prepped and laid 8 bid for left upper motor mount
Details

 10-15-2007
2.00
cut bid

 10-12-2007
2.00
trimmed and sanded out air bubbles on motor mount
Details

 10-11-2007
3.00
laid 8 bid for right upper motor mount support
Details

 10-08-2007
1.00
prepped 8 bid for 1 motor mount support
Details

 10-07-2007
1.50
floxed in plywood motor mount supports
Details

 10-06-2007
3.00
cut,fit, and floxed in lower motor mounts and clea
Details

 10-05-2007
2.50
bagged 6 bid on the tail spring to fuselage
Details
       

 10-03-2007
1.00
finished floxing in tail wheel spring, cut bid and
Details

 10-02-2007
2.00
drilled, fit and floxed in tail wheel spring
Details

 10-01-2007
1.50
cleaned up LG tunnel bagging and sanded
Details

 09-30-2007
4.50
prepped and bagged 3 bid on bottom of LG tunnel
Details

 09-27-2007
2.50
sanded out air bubbles and prepped 3 bid for LG tu
Details

 09-26-2007
1.50
trimmrd, fit bushings and installed on tail wheel
Details

 09-25-2007
3.00
sanded out air bubbles and repaired dings in LG tu
Details

 09-23-2007
3.00
Flipped over and cleaned an prepped to glass LG tu
Details

 09-19-2007
2.00
cut bid

 09-18-2007
2.00
marked and drilled motor mount holes
Details

 09-17-2007
2.50
fit and laided 2 bid tapes on last part of forward
Details

 09-16-2007
2.00
fit and laided 2 bid tapes on first part of forwar
Details

 09-15-2007
1.00
2 bid tapes on center section of forward deck
Details

 09-14-2007
2.00
fit and microed in forward deck
Details

 09-13-2007
1.50
made and installed forward deck bulkhead
Details

 09-12-2007
2.00
trimmed , installed nutplates and floxed hardpoint
Details

 09-10-2007
1.00
added 2 bid to flanges for pedal board
Details

 09-09-2007
3.50
bagged forward deck piece
Details

 09-09-2007
1.00
added 2 more flanges for pedal board
Details

 09-08-2007
3.50
installed nutplates and mounted rudder pedal board
Details

 09-06-2007
1.00
floxed hardpoints on pedal board fro mounts
Details

 09-05-2007
3.00
trimmed pedal board pads, drilled and prepped hard
Details

 08-22-2007
1.00
added 3 bid to pedal board flanges
Details

 08-18-2007
2.00
bagged forward deck bulkhead
Details

 08-12-2007
1.50
microed in flanges for pedal board
Details

 08-12-2007
1.50
cut material for forward deck
Details

 08-05-2007
1.50
glassed in supports for rudder pedal board
Details

 08-04-2007
5.00
worked on rudder pedal board for installation
Details

 08-01-2007
0.50
drilled saftety pin holes and clean up bagging
Details

 07-30-2007
1.00
trimmed master cylinder mounting brackets
Details

 07-29-2007
4.00
installed 20 bid inside left tunnel brace for 20
Details

 07-28-2007
1.50
8 bid left outer tunnel braces
Details

 07-27-2007
2.50
8 bid left inner tunnel braces and prepped more
Details

 07-22-2007
1.50
sanded LG tunnel braces
Details

 07-20-2007
2.00
cut glass for landing gear supports
Details

 07-19-2007
2.00
installed 12 bid inside right front tunnel braces
Details

 07-18-2007
1.50
3 bid on inside of master cylinder mounting bracke
Details

 07-17-2007
1.00
3 bid on outside of master cylinder mounting brack
Details

 07-15-2007
2.00
laid out, built master cylinder mounting brackets
Details

 07-15-2007
3.00
installed and made patterns for 8 bid inside right
Details

 07-14-2007
2.00
drilled and bonded nutplates to rudder pedal board
Details

 07-13-2007
2.00
built bondable nutplates
Details

 07-12-2007
1.00
3 bid on hardpoints on rudder pedal board
Details

 07-11-2007
2.50
placed hardpoints on rudder pedal board
Details

 07-11-2007
1.50
6 bid both right front tunnel braces

 07-10-2007
2.50
6 bid both right front tunnel braces
Details

 07-09-2007
1.00
sanded LG tunnel braces
Details

 06-22-2007
3.00
8 bid right inner rear tunnel braces and preped mo
Details

 06-09-2007
1.00
8 bid right outer rear tunnel braces
Details

 06-05-2007
1.50
floxed in landing gear tunnel braces
Details

 06-04-2007
2.00
cut and fit landing gear tunnel braces
Details

 06-01-2007
1.00
trimmed 3 bid
Details

 05-31-2007
1.50
laid-up 3 bid for langing gear tunnel braces
Details

 05-29-2007
1.00
cut glass for landing gear supports
Details

 05-27-2007
4.00
glass l. lower motor mount brace
Details

 05-26-2007
3.50
glass r. lower motor mount brace
Details

 05-25-2007
1.50
prepped to glass lower motor mounts
Details

 03-15-2007
3.00
jeweled firewall
Details

 03-13-2007
3.00
jeweled firewall
Details

 03-05-2007
3.00
welded motor mount
Details

 03-02-2007
3.00
welded motor mount
Details

 02-26-2007
3.00
fit and tacked motor mount
Details

 02-18-2007
3.00
sandblasted motor mount
Details

 02-07-2007
2.00
worked on motor mount
Details

 02-05-2007
2.00
worked on motor mount
Details

 02-04-2007
2.50
worked on motor mount
Details

 01-31-2007
2.00
worked on motor mount
Details

 01-29-2007
2.00
Machined on motormount
Details

 01-21-2007
2.50
made templates for glass for lower motor mounts
Details

 12-22-2006
2.50
prepared to glass starboard bottom motor mount
Details

 12-21-2006
2.00
cut,fit, and floxed in lower motor mounts
Details

 12-20-2006
1.00
floxed in phenolic for lower engine mounts
Details

 12-18-2006
1.00
removed tunnel form and clean up
Details

 12-18-2006
1.00
drilled motor mount pilot hole cut and prepared ph
Details

 12-10-2006
2.00
laid out mounting hole on firewaal for engine moun
Details

 12-09-2006
2.00
added 2 bid to tunnel
Details

 12-08-2006
3.00
added 3 bid to tunnel
Details

 11-03-2006
2.00
sanded flaws in first bagging and preped for next
Details

 09-22-2006
2.00
cleaned up after bagging failed to hold vacuum
Details

 09-20-2006
4.00
2 bid on tunnel
Details

 09-18-2006
2.50
embedded 2x2 phenolic block at station 157
Details

 09-18-2006
1.00
cut 7 bid to glass tunnel
Details

 09-17-2006
3.00
fitted plug for LG tunnel into fuselage
Details

 09-16-2006
1.50
Cut slot in fuselage for LG
Details

 09-15-2006
2.00
made plug for main gear channel in fuselage
Details

 08-22-2006
1.00
drilled and mounted tail wheel to spring
Details
       

 08-18-2006
2.00
fitted tail wheel assy to tail spring
Details

 08-14-2006
2.00
cleaned up and sanded tail spring after final bid
Details

 08-13-2006
2.00
added last 5 bid to tail spring
Details

 08-12-2006
3.00
sanded on gear

 08-10-2006
2.00
sanded on main gear
Details

 08-09-2006
2.50
sanding on main gear
Details

 08-02-2006
3.00
started sanding toward finishing
Details

 07-30-2006
2.00
add final 2 tapered bid
Details

 07-29-2006
2.00
sanded and prepped for finally 2 bid taper
Details

 07-28-2006
2.00
added 2 tapering bid
Details

 07-27-2006
1.00
prepped for 4 bid of taper
Details

 07-26-2006
2.00
sanded
Details

 07-25-2006
2.00
sanded
Details

 07-23-2006
1.00
prepped to bag right side
Details

 07-23-2006
2.00
added 4 bid to right side total bid 8
Details

 07-22-2006
2.00
added 4 layers bid to left leg
Details

 07-09-2006
1.00
sanded on first coat of bid on llanding gear
Details

 07-09-2006
3.00
added 4 bid to center section
Details

 07-08-2006
2.00
sanded on first coat of bid on llanding gear
Details

 07-07-2006
1.00
sanded on first coat of bid on llanding gear
Details

 06-08-2006
2.00
sanded on first coat of bid on llanding gear
Details

 06-07-2006
1.50
sanded on first coat of bid on llanding gear
Details

 06-03-2006
1.50
sanded on first coat of bid on llanding gear
Details

 06-02-2006
1.00
clean up bagging of gear
Details

 06-01-2006
3.00
bagged 4 bid on right lower 1/3 side of gear
Details

 05-23-2006
1.00
prepped material fo 4 bid right side
Details

 05-21-2006
2.50
bagged 4 bid on left lower 1/3 side of gear
Details

 05-20-2006
1.50
cut glass and material for bagging bid wrap
Details

 05-18-2006
1.00
final shape on landing gear
Details

 05-17-2006
2.50
shaped foam on LG
Details

 05-16-2006
1.00
foamed trailing edge of landing gear
Details

 05-15-2006
1.00
foamed leading edge of LG
Details

 05-14-2006
2.00
removed foam and flox filled legs
Details

 05-12-2006
1.50
sanded some
Details

 05-11-2006
2.00
sanded some more
Details

 05-10-2006
1.00
more sanding
Details

 05-08-2006
3.00
sanded uni edges

 05-07-2006
3.00
added last 10 uni to top of main gear
Details

 05-05-2006
2.50
added 9 uni to top of main gear
Details

 05-04-2006
2.00
prepped main gear for top uni
Details

 05-03-2006
2.00
glassed panel for pedals
Details

 05-02-2006
1.00
prepped for glassing pedal board
Details

 04-10-2006
2.00
fitted pivot blocks for pedals
Details

 04-09-2006
3.00
powder coated and assembled stick
Details

 04-08-2006
4.00
prepped stick assy for power coating
Details

 04-07-2006
3.00
welding on stick
Details

 04-02-2006
1.00
welded on stick
Details

 03-29-2006
2.00
made arms for stick
Details

 03-09-2006
2.00
welded and fitted stick
Details

 03-08-2006
2.00
welded on stick pivot
Details

 03-07-2006
2.00
machined bolts for tailwheel assembly
Details

 03-05-2006
2.00
welded on stick pivots
Details

 03-03-2006
3.00
made pivots for control sticks
Details

 03-02-2006
2.00
made bearing blocks for pedals
Details

 02-28-2006
2.00
made bearing blocks for pedals
Details

 02-26-2006
2.00
powdercoated tailwheel assembly
Details

 02-25-2006
2.00
stripped tailwheel and prepped for powdercoat
Details

 02-23-2006
2.00
made bearing blocks for pedals
Details

 02-22-2006
2.00
powder coated rudder assembly
Details

 02-19-2006
2.00
powder coated rudder assembly
Details

 02-18-2006
2.00
pedal assemblies
Details

 02-17-2006
3.00
pedal assemblies
Details

 02-12-2006
4.00
welded on pedal assembly
Details

 02-11-2006
2.00
powdered coated parts
Details

 02-10-2006
2.00
powdered coated parts
Details

 02-06-2006
2.00
welded on elevator actuator
Details

 02-05-2006
2.00
welded on elevator actuator
Details

 01-29-2006
2.00
cleaned up welds on assorted parts
Details

 01-28-2006
2.00
welded on elevator control horn
Details

 01-20-2006
2.00
welded on elevator control horn
Details

 01-19-2006
1.00
fitted pedal parts
Details

 01-18-2006
2.00
welded more pedal parts
Details

 01-16-2006
2.00
fit pedal parts
Details

 01-15-2006
2.00
welded on pedals
Details

 01-12-2006
2.00
machined tubes for pedals
Details

 01-10-2006
1.00
cut tubing for pedals
Details

 12-15-2005
1.00
cut slot on tailwheel assembly
Details

 12-02-2005
2.00
final welds on tail wheel assembly
Details

 11-14-2005
2.00
prepped for post-curing of lower side glass
Details

 11-08-2005
1.00
welded plate on tailwheel assembly
Details

 11-05-2005
3.00
4 uni to finish bottom mainspring total 16
Details

 11-01-2005
2.00
more tailwheel welding
Details

 10-30-2005
2.00
added 3 uni to bottom of mainspring total 12
Details

 10-28-2005
1.00
prep for more glass bagging
Details

 10-25-2005
2.00
welded tailwheel assembly
Details

 10-23-2005
2.00
cleaned up last layers
Details

 10-22-2005
2.00
prepped to lay uni on main spring
Details

 10-22-2005
2.00
add 4 layers uni to bottom of mainspring total 9
Details

 10-20-2005
2.00
welded brake pedals
Details

 10-18-2005
2.00
made jigs for welding brake petals
Details

 10-15-2005
1.50
finished sanding this layer
Details

 10-14-2005
1.00
sanded some more
Details

 10-13-2005
2.00
welded on brake pedals
Details

 10-12-2005
2.00
still sanding
Details

 10-11-2005
1.50
cut and machined toe brakes pieces
Details

 10-09-2005
2.00
still sanding
Details

 10-08-2005
1.00
sanding first layers
Details

 10-06-2005
1.50
Made bushings for tailwheel
Details

 10-04-2005
1.50
Made bushings for tailwheel
Details

 10-01-2005
2.50
layed 5 layers of uni on the lower side
Details

 09-30-2005
2.00
setup bagging
Details

 09-29-2005
2.00
tailwheel parts
Details

 09-28-2005
4.00
cut uni for the main gear
Details

 09-27-2005
2.00
machined on tail wheel assembly
Details

 09-23-2005
3.00
bent tailwheel steel
Details

 09-22-2005
1.50
cut more tailwheel part
Details

 09-19-2005
2.00
cut parts for tail wheel assembly
Details

 09-18-2005
2.00
shaped width of gear
Details

 09-17-2005
2.00
matched legs in form
Details

 09-15-2005
1.50
finished machining pads and actuator for elevator
Details

 09-14-2005
2.00
Shaped thickness taper on foam
Details

 09-13-2005
2.00
machined pads for elevator actuator
Details

 09-10-2005
1.50
added last layer of foam
Details

 09-09-2005
2.00
attached first and second layers of foam
Details

 09-08-2005
2.00
cut pads for elevator actuator
Details

 09-04-2005
2.00
assembled an clamped foam to form
Details

 09-03-2005
2.50
built form for the gear
Details

 06-10-2005
2.00
wrapped 3 layers of glass on tail spring still nee
Details

 06-07-2005
3.00
filled edges & wrapped 3 layers of glass on tail s
Details

 06-06-2005
2.00
glassed other side of tail spring
Details

 06-05-2005
2.50
glassed first layers of tail spring
Details

 06-04-2005
2.00
formed foam for tail spring
Details

 02-01-2005
25.00
installed seat
Details

 01-01-2005
25.00
installed seat supports
Details

 11-01-2004
25.00
made and installed firewall
Details

 10-01-2004
25.00
made and installed rear bulkheads
Details

 03-01-2004
20.00
finished glassing inside
Details

 02-01-2004
20.00
glassed on the inside of fuselage
Details

 01-01-2004
20.00
set fuselage sheet in former and stared glassing i
Details

 12-01-2003
20.00
joined fuselage pieces
Details

 11-01-2003
20.00
built fuselage formers
Details

 05-01-2003
30.00
made fuselage pieces
Details

 04-01-2003
30.00
made fuselage pieces
Details

 03-01-2003
30.00
made fuselage pieces
Details

 02-01-2003
30.00
finished horizontal stab
Details

 01-01-2003
30.00
started building horizontal stab
Details

 12-01-2002
40.00
construction of seat
Details