Powered By Kitlog Pro v2.0
Tom's Mustang II
Mustang II
All
Work Logs Found:
57
Category Work Time:
244 Hours
Date
Hours
Work Log Summary
Details
11-22-2013
15.00
Engine Overhaul
08-30-2005
3.50
Collective lock
Details
08-22-2005
4.50
New control rods
Details
08-21-2005
7.00
New Control Rods
Details
08-18-2005
4.00
New control rod installation
Details
08-14-2005
6.00
brackets for new control rods
Details
08-06-2005
2.00
control rod inserts
Details
08-05-2005
6.00
Tail rotor drive shaft
Details
07-19-2005
6.00
tail rotor drive
Details
05-04-2005
2.00
control rods
Details
04-21-2005
3.00
Tail Boom
Details
03-05-2005
2.00
cowling
Details
02-24-2005
6.00
Painting
Details
01-11-2005
3.00
reassembly
Details
12-10-2004
2.50
transmission supports
Details
09-13-2002
5.00
Assembling body
Details
09-12-2002
4.00
Installed valve covers
Details
09-12-2002
2.00
FIRST ENGINE RUN
Details
09-11-2002
1.50
Painted Valve covers
Details
09-10-2002
0.50
Valve covers
Details
09-10-2002
2.00
Lower bulkhead formers
Details
09-09-2002
2.00
Metal Prep
Details
09-09-2002
4.00
carburator flange
Details
09-05-2002
6.00
interior metal
Details
09-04-2002
7.50
panels
Details
09-04-2002
5.00
cotter pinning
Details
08-29-2002
6.50
Carburator
Details
08-08-2002
6.00
control rods
Details
07-30-2002
2.50
Tail Stablizer
Details
06-26-2002
2.00
Control Rods
Details
06-24-2002
10.50
Oil Tank, Control Rods, Panel
Details
06-19-2002
7.50
Tail Rotor Drive
Details
06-14-2002
8.00
Oil Tank
Details
06-13-2002
7.00
Fuel Tanks
Details
06-12-2002
8.00
Fuel Primer And Tanks
Details
06-11-2002
8.00
Fuel Lines
Details
05-14-2002
3.00
Oil Cooler/Carb
Details
02-14-2002
2.00
Nut And Cotter Pins
Details
01-15-2002
5.00
Transmission
Details
01-10-2002
4.00
Main Rotor Gearbox
Details
01-07-2002
4.00
Realigned Main Trans
Details
01-05-2002
4.00
Tailboom
Details
01-05-2002
1.00
Alternator
Details
12-24-2001
2.50
Metal Work
Details
12-20-2001
4.00
Installed Transmission
Details
11-20-2001
7.00
Shrouding And Alignment
Details
10-09-2001
0.50
Dolly Wheels
Details
10-08-2001
6.00
Engine Installation
Details
05-01-2001
6.00
Sandblasting And Priming
Details
04-25-2001
2.00
Sandblasting
Details
04-24-2001
2.30
Sandblasting
Details
04-18-2001
1.50
Removed Sheetmetal
Details
11-09-2000
2.75
Skids
Details
11-07-2000
2.00
Skids
Details
11-04-2000
2.00
Skids
Details
11-03-2000
3.00
Wheels
Details
07-15-2000
1.50
Inventory
Details
SITE NAVIGATION
Contact Builder
Helicycle Home
pt-19 Home
Mustang II Home
Category
# Logs
# Hours
All
57
261
Empennage
7
27
Engine
24
126
Fuselage
22
89
Interior
2
14
Shop Supplies
1
2
Systems
1
3
Copyright © 2001-2024 Matronics. All Rights Reserved.