Powered By Kitlog Pro v2.0
Lucs Web site
RV 7
All
Work Logs Found:
82
Category Work Time:
263 Hours
Date
Hours
Work Log Summary
Details
08-02-2006
0.10
SOLD
Details
06-09-2006
0.10
For Sale
Details
05-21-2006
4.00
Riveted the stiffeners
Details
04-15-2006
2.00
Pro-seal
Details
03-26-2006
3.00
Riveting
Details
03-12-2006
3.00
Riveting
Details
02-19-2006
3.00
riveting
Details
02-12-2006
3.00
Top skin
Details
01-08-2006
4.00
left fuel tank
Details
01-02-2006
3.00
inboard rib
Details
12-29-2005
3.00
deburred dimpled right tank
Details
12-26-2005
2.00
started to work on fuel tanks
Details
12-18-2005
4.50
Finished prep of leading edges
Details
12-17-2005
4.50
rear spar
Details
12-11-2005
3.00
riveted ribs
Details
12-08-2005
2.00
Riveted ribs
Details
11-27-2005
5.00
conduit hole,
Details
11-20-2005
2.00
primed all parts of rear spar,
Details
11-20-2005
2.00
deburred dimpled etc...
Details
11-12-2005
2.00
Deburred and dimpled
Details
11-08-2005
0.10
Gotcha
Details
11-04-2005
3.00
primed all the ribs
Details
11-02-2005
0.10
More alodine +
Details
10-31-2005
7.00
getting ready to prime
Details
10-30-2005
4.00
De Burr
Details
10-29-2005
4.00
Tank work
Details
10-28-2005
5.00
right fuel tank
Details
10-27-2005
4.00
right wing
Details
10-27-2005
2.00
Fuel Tank
Details
10-26-2005
4.00
tank bracket
Details
10-25-2005
4.50
matchdrilled
Details
10-24-2005
7.00
wing ribs and skin
Details
10-24-2005
2.00
Deburred, straighten and flute
Details
10-23-2005
3.50
wing ribs
Details
10-22-2005
2.50
worked on rear spar
Details
10-22-2005
4.00
built wing jig, and re-arranged shop
Details
10-16-2005
4.00
Nutplates
Details
10-15-2005
5.00
Main spar coutersink
Details
10-15-2005
0.50
hardware
Details
10-11-2005
0.50
trim tab
Details
10-09-2005
1.00
left elevator skeleton
Details
10-08-2005
2.00
skeleton of right elevator
Details
10-08-2005
1.00
clean up the shipping paper and crates
10-06-2005
2.00
wings
Details
09-27-2005
0.10
Wings are coming
Details
09-18-2005
6.00
day 2 sportair workshop
Details
09-17-2005
8.00
Sport air workshop
Details
09-10-2005
2.50
primer
Details
09-04-2005
3.00
left elevator
Details
09-01-2005
2.50
back riveted stiffeners to left elevator
Details
08-29-2005
1.00
alumiprep
Details
08-27-2005
1.00
primed stiffners for elevators
08-27-2005
4.00
elevator
Details
08-21-2005
5.00
started elevator
Details
08-17-2005
0.50
riveting skin on HS
Details
08-14-2005
5.50
Assembled rudder and buttoning HS
Details
08-13-2005
1.50
primed skeleton of rudder
08-10-2005
0.00
received letter
Details
08-09-2005
5.00
Ruder Skeleton
Details
08-08-2005
1.00
priming,
Details
08-07-2005
1.00
trim and deburr stiffener
08-07-2005
2.00
match drill
Details
08-07-2005
1.50
dimpled stiffener and skins for rudder
Details
08-07-2005
0.50
back riveting plate recessed in table top
08-07-2005
0.75
back riveted rudder skin
Details
08-07-2005
1.50
alumiprep, alodine and epoxy primer
Details
07-27-2005
0.00
Oshkosh
Details
07-24-2005
4.00
riveted
Details
07-23-2005
4.00
primer HS parts
Details
07-22-2005
4.00
scotch brite, alumiprep and alodine HS parts
Details
07-20-2005
4.50
riveted VS skin
Details
07-19-2005
3.00
VS spar
Details
07-19-2005
3.00
primed VS parts
Details
07-19-2005
3.00
assembled VS
Details
07-18-2005
1.00
purchased Primer supplies
Details
07-16-2005
4.00
DRDT-2
Details
07-09-2005
2.00
installed air lines from compressor to work table
07-02-2005
0.50
here are a few of my tools
Details
07-01-2005
5.00
built a work table
Details
06-25-2005
2.00
assembled horizontal stab.
Details
06-15-2005
40.00
shop preparation
Details
06-15-2005
1.00
received empennage
Details
SITE NAVIGATION
Contact Builder
RV 7 Home
Category
# Logs
# Hours
All
82
263
Empennage
21
53
Fuel Tank
6
18
Miscellaneous
7
17
None
3
0
Primer
11
30
shop preparation
4
51
Shop Supplies
1
0
Tools
3
5
Wings
26
89
Copyright © 2001-2024 Matronics. All Rights Reserved.