Henkjan's Van's RV10 PH-ZME
Work Logs Found: 395
Category Work Time: 2186 Hours
 Date
Hours
Work Log Summary

Details

 10-17-2019
2.00
Transport to airport
       

 09-29-2019
2.00
Transport to airport
       

 09-29-2019
2.00
Transport to airport
       

 09-29-2019
2.00
Transport to airport
       

 08-21-2019
10.00
Fabricating tow bar
       

 08-15-2019
2.00

       

 08-08-2019
2.00

       

 08-01-2019
2.00

       

 07-25-2019
2.00

       

 07-18-2019
2.00

       

 07-11-2019
2.00

       

 01-03-2019
10.00

       

 11-27-2018
6.00

     

 01-30-2018
6.00

       

 01-28-2018
6.00

       

 01-26-2018
6.00

     

 01-25-2018
6.00

       

 01-24-2018
6.00

       

 01-23-2018
6.00

       

 01-22-2018
6.00

       

 01-21-2018
6.00

       

 01-20-2018
6.00

       

 01-19-2018
6.00

       

 01-18-2018
6.00

Details
       

 01-17-2018
6.00

       

 01-16-2018
6.00

       

 01-15-2018
6.00

       

 01-14-2018
6.00

     

 01-13-2018
6.00

       

 01-12-2018
6.00

       

 01-11-2018
6.00

       

 01-10-2018
6.00

       

 01-09-2018
6.00

       

 01-08-2018
6.00

       

 01-07-2018
6.00

       

 01-06-2018
6.00

       

 01-05-2018
6.00

       

 01-04-2018
6.00

       

 01-03-2018
6.00

       

 01-02-2018
6.00

       

 01-01-2018
6.00
primer doors and wheelpants
       

 02-15-2011
6.00
Installing ELT
Details
       

 02-02-2011
2.00
Completed service bulletin 08-6-1
Details
       

 11-17-2009
0.00
Rudder pedal offsets mounted
Details
       

 03-14-2009
6.00
Rudder pedal offsets
Details
       

 03-13-2009
6.00
Spinner mod
Details
       

 03-12-2009
6.00
Spinner mod
Details
       

 03-11-2009
9.00
Interior almost done
Details
       

 09-22-2008
0.00
Buildus interruptus
Details

 07-10-2008
19.00
Interior work
Details

 06-22-2008
19.00
Door pins, locks and hinges
Details
       

 06-09-2008
22.00
Paint prep
Details

 05-24-2008
0.00
DAMME RV FLY IN
Details
       

 05-22-2008
17.00
Sanding and filling
Details
       

 05-17-2008
0.00
Flight training with Alex de Dominicis
Details
       

 04-25-2008
26.00
Rudder trim and preparation for paint
Details
       

 04-15-2008
5.00
Effected SB 06-2-3 and started Rudder trim mod.
Details
       

 04-06-2008
3.00
Mounted airfilter box
Details
       

 04-05-2008
7.00
Air scoop and filtered airbox
Details
       

 04-03-2008
21.00
Finished my panel!
Details
       

 03-24-2008
10.00
Started applying upholstery
Details
       

 03-22-2008
16.00
Switch support brackets for safety.
Details
       

 03-20-2008
17.00
Switch support brackets for safety
Details
       

 03-15-2008
89.00
Panel wiring and wingtips
Details
       

 02-10-2008
8.00
Closing the center tunnel
Details
       

 02-07-2008
58.00
Wiring, wiring, wiring and more wiring
Details
       

 01-22-2008
6.00
Wiring again
Details
       

 01-20-2008
7.00
Wiring, wiring and wiring
Details
       

 01-17-2008
8.00
Engraving panel inserts
Details
       

 01-15-2008
15.00
More wiring and filling and sanding elevators
Details
       

 01-13-2008
10.00
Wiring AOA and ground strip
Details
       

 01-08-2008
16.00
Wiring, airbox and filling rudder
Details
       

 01-01-2008
12.00
Instrument panel fitting.
Details
       

 12-30-2007
2.00
Carbon panel parts
Details
       

 12-15-2007
14.00
Firewall foward work
Details

 12-11-2007
9.00
Fairings and cowling
Details
       

 12-04-2007
17.00
Baffling and FFW wiring
Details
       

 11-12-2007
17.00
Baffling, wiring and exhaust system
Details
       

 11-07-2007
7.00
Bonded windows
Details
       

 11-04-2007
7.00
Baffling
Details
       

 11-02-2007
10.00
Cowling and baffling
Details
       

 10-30-2007
17.00
Doors, cowling and wingtips
Details
       

 10-20-2007
16.00
Spinner and Cowling, past 1500 hours !!!!
Details
       

 10-17-2007
13.00
Fitted the cowling
Details
       

 10-09-2007
9.00
Spinner and wingtips
Details
       

 10-07-2007
9.00
Painted interior
Details
       

 09-25-2007
9.00
Match drilling the wingtips
Details
       

 09-19-2007
3.00
Fitting the wingtips
Details

 09-18-2007
6.00
Fitting the wingtips
Details

 09-15-2007
15.00
Filling and sanding layup, doors and windows
Details
       

 09-13-2007
5.00
Bonded left aft window and made front layup
Details

 09-12-2007
28.00
Filling, sanding, priming and bonded windscreen in
Details
       

 09-01-2007
14.00
Filling, sanding and priming
Details
       

 08-29-2007
19.00
Various fuselage work
Details
       

 07-14-2007
3.00
Insulated firewall and leaving for Oshkosh
Details
       

 07-11-2007
1.00
Fitted some parts to the firewall
Details
       

 07-10-2007
9.00
Fuel pump inspection hatch
Details
       

 07-03-2007
15.00
Bonding and riveting cabin top to the structure.
Details
       

 07-02-2007
7.00
Filling and sanding cabin top
Details
     

 07-01-2007
7.00
Filling cabin top gaps and made antenne doublers
Details
       

 06-30-2007
8.00
Manufactured doorhinge nuts
Details
       

 06-28-2007
9.00
Fitting doors and sanding cabin top
Details

 06-25-2007
16.00
Fitting the doors
Details
       

 06-20-2007
3.00
Primed panel an trimming left door
Details

 06-19-2007
8.00
Bonding left door
Details
       

 06-13-2007
9.00
Priming panel and door trimming
Details
       

 06-10-2007
17.00
Center console work
Details
       

 06-02-2007
10.00
Various center console work
Details
       

 05-29-2007
5.00
Shaping front window
Details
       

 05-27-2007
8.00
Glued the panel and throttle rework
Details
       

 05-26-2007
12.00
Panel and control cables
Details
       

 05-22-2007
6.00
Finishing and riveting flap trailing edges
Details
       

 05-15-2007
3.00
Prepared flap trailing edges for riveting
Details
       

 05-15-2007
2.00
Panel reinforcements.
Details
       

 05-14-2007
2.00
Finishing aileron trailing edges
Details

 05-12-2007
3.00
Fitting the panel
Details

 05-08-2007
7.00
Riveting flaps and bonding aileron trailing edge
Details
       

 05-02-2007
7.00
Riveted flap and ailerons
Details
       

 04-28-2007
6.00
Various panel work
Details

 04-27-2007
8.00
Riveted ailerons and flaps
Details
       

 04-24-2007
3.00
Avionics stack frame
Details
       

 04-22-2007
3.00
Primed flap skins
Details
       

 04-22-2007
3.00
Panel cutouts, breakers and switches
Details
       

 04-14-2007
3.00
Deburred and dimpled flap parts
Details
     

 04-10-2007
7.00
Dimpled flap skins and riveted ailerons
Details
       

 03-25-2007
3.00
Primed aileron and flap parts
Details
       

 03-24-2007
0.00
Mounted alternator kit to PH-VIN
Details
       

 03-20-2007
5.00
Deburring and dimpling aileron and flap parts
Details

 03-13-2007
3.00
Panel work
Details

 03-13-2007
3.00
Deburring aileron and flap parts
Details

 03-12-2007
0.00
Painted USH's wingtips
Details
       

 03-10-2007
7.00
Fitted instruments and avionics
Details
       

 03-06-2007
6.00
Match drilled flaps/milled instrument holes
Details
       

 03-04-2007
11.00
Instrument holes milled
Details
       

 03-03-2007
7.00
Started to fit the instruments
Details

 02-28-2007
2.00
Dimpling aileron parts
Details
       

 02-27-2007
3.00
Deburring ailerons plus PH-USH panel work
Details
       

 02-23-2007
0.00
Refurbishing PH-USH panel
Details
       

 02-22-2007
0.00
Refurbishing PH-USH panel
Details
       

 02-21-2007
0.00
Refurbishing PH-USH panel
Details
       

 02-20-2007
0.00
PH-USH 600 hrs inspection
Details
       

 02-20-2007
7.00
Match drilled ailerons and flaps
Details
       

 02-19-2007
3.00
Cleco'd and match drilled ailerons and flaps
Details
       

 02-18-2007
7.00
Started match drilling ailerons
Details
       

 02-17-2007
0.00
Repaired hangar doors and made the subfloor stairs
Details
       

 02-17-2007
3.00
Match drilling and clecoing flaps
Details
       

 02-13-2007
8.00
Assembling left wing
Details
       

 02-06-2007
8.00
Riveting large bottom wing skin
Details
       

 02-03-2007
3.00
Priming left fuel tank
Details
       

 02-01-2007
2.00
Assembling aileron actuation
Details

 01-30-2007
4.00
Riveting bottom skins
Details
       

 01-28-2007
5.00
Various things today
Details
       

 01-27-2007
14.00
Assembled right wing
Details
       

 01-26-2007
1.00
Finished riveting rear seat backs
Details

 01-25-2007
1.00
Assembled right wing
Details
       

 01-23-2007
8.00
Riveted left wing top skins
Details
       

 01-21-2007
2.00
Started clecoing the flaps, past 1000 man hours!!!
Details
       

 01-21-2007
4.00
Stall warner and AoA
Details
       

 01-20-2007
3.00
Interior arrived!
Details
       

 01-19-2007
5.00
Closed, leak tested and primed fuel tank
Details

 01-16-2007
6.00
Riveted right wing ribs and rear spar
Details

 01-11-2007
7.00
New lockable fuel caps and mounted float's
Details
       

 01-09-2007
10.00
Riveted leading edges
Details
       

 01-09-2007
0.00
Baffling, baffling and baffling the PH-VIN
Details
       

 01-07-2007
0.00
Worked on hangar subfloor.
Details
       

 01-06-2007
2.00
Primed wing and leading edge skins and ribs
Details
       

 01-02-2007
7.00
Riveting left wing spar and ribs
Details
       

 12-31-2006
2.00
Priming left wing parts
Details

 12-30-2006
0.00
Hangar subfloor
Details
       

 12-29-2006
7.00
Deburrring and dimpling wing skins
Details
       

 12-27-2006
6.00
Dimpling left wing skins and leading edge
Details
       

 12-26-2006
2.00
AOA ports and drain extension
Details
       

 12-23-2006
2.00
Match drilling rear seat backs
Details
     

 12-23-2006
8.00
Cleco'd both wing leading edges
Details
       

 12-22-2006
10.00
Match drilled left wing rear spar
Details
       

 12-19-2006
10.00
Deburring left wing parts
Details
       

 12-05-2006
7.00
Riveting right wing
Details
       

 11-28-2006
6.00
Riveting right wing parts
Details
       

 11-26-2006
8.00
Riveting Right wing during Hobby 2006
Details
       

 11-22-2006
0.00
Transport to Hobby 2006 show
Details
       

 11-22-2006
0.00
Preparing PH-VIN for Hobby 2006 show
Details
       

 11-22-2006
0.00
Preparing for Hobby 2006 show
Details
       

 11-13-2006
4.00
Dimpling right wing skins
Details

 11-11-2006
1.00
Packing right wing parts
Details
       

 11-10-2006
2.00
Priming right wing parts
Details
       

 11-08-2006
0.00
New member of the family
Details
       

 11-07-2006
0.00
Getting ready for Hobby 2006
Details
       

 11-07-2006
7.00
Dimpling skins
Details
       

 11-05-2006
10.00
Finalized deburring and dimpling right wing.
Details
       

 11-01-2006
7.00
Deburring right wing parts
Details
       

 10-24-2006
2.00
Preparing rear seat backs
Details
     

 10-24-2006
7.00
Match drilling
Details
       

 10-10-2006
10.00
Cleco'd wing ribs and skins
Details
       

 09-26-2006
8.00
Countersunk and preparing ribs
Details
       

 09-26-2006
1.00
Center console work
Details

 09-20-2006
6.00
Countersunk wing spars
Details
       

 09-18-2006
5.00
Finishing tunnel cover
Details

 09-17-2006
8.00
Center console progress
Details
       

 09-16-2006
5.00
Assembled flap system/ 800 hrs +
Details
     

 09-12-2006
4.00
Rudder cable links and flap system.
Details
       

 09-12-2006
4.00
Match drilled main spar stiffeners
Details
       

 09-10-2006
12.00
Sticks and pedals
Details
       

 09-08-2006
3.00
Final pushrod assembly
Details
       

 09-05-2006
0.00
Released center tunnel mould
Details
     

 09-05-2006
5.00
Match drilled j-stiffeners
Details
       

 09-05-2006
4.00
Assembled pushrods
Details
       

 09-04-2006
0.00
Starting to look like an airplane!
Details
       

 09-02-2006
7.00
Laminated center console
Details
       

 09-01-2006
3.00
Laminated second mould half
Details
       

 08-31-2006
6.00
Laminated first tunnel half mould
Details
       

 08-29-2006
6.00
Riveted upper forward fuselage assembly
Details
       

 08-23-2006
4.00
Primed pushrods
Details
       

 08-22-2006
17.00
Finished fuel lines, dimpling forward fuse parts
Details
       

 08-17-2006
6.00
Center console etc.
Details

 08-15-2006
2.00
Deburring upper forward fuse parts
Details

 08-13-2006
1.00
Fitted the panel to fuselage
Details
     

 08-12-2006
5.00
Match drilled rivet backup strip
Details
       

 07-04-2006
1.00
Panel mockup
Details
       

 07-01-2006
4.00
Attached baggage door
Details
       

 06-27-2006
10.00
Baggage door/ Fuel system (700 hour mark)
Details
       

 06-26-2006
1.00
Fuel system
Details
       

 06-20-2006
10.00
Brake lines / deburring wing parts
Details
       

 05-30-2006
1.00
Painted the center tunnel mould.
Details
     

 05-30-2006
4.00
Match drilled cabin cover
Details
       

 05-24-2006
4.00
Fitted cabin cover
Details
       

 05-21-2006
5.00
Trimming cabin cover
Details
       

 05-16-2006
5.00
Center tunnel and deburring wing parts
Details
       

 05-14-2006
6.00
Shaped center tunnel
Details
       

 05-13-2006
6.00
Designing the tunnel
Details
       

 05-12-2006
3.00
Riveting floor panels and nutplates.
Details
       

 05-12-2006
4.00
Fitting the panel
Details
       

 05-09-2006
6.00
Riveted floor panels and nutplates.
Details
       

 05-09-2006
2.00
Deburred and fluted wing ribs.
Details

 05-08-2006
3.00
Riveted floorpanels and nutplates
Details
       

 05-03-2006
3.00
Riveting floor panels
Details
       

 05-03-2006
3.00
Deburred an fluted wing ribs
Details

 05-02-2006
2.00
Under floor wiring
Details
       

 04-24-2006
3.00
Installed some wiring
Details
       

 04-24-2006
5.00
Deburred and fluted wing ribs.
Details
       

 04-18-2006
2.00
Priming floor panels
Details
       

 04-18-2006
2.00
Preparing bagage door
Details
       

 04-18-2006
2.00
Deburring wing ribs
Details
       

 04-17-2006
8.00
Match drilled and dimpled floor panels
Details
       

 04-15-2006
0.00
PH-VIN gets a new nose
Details
       

 04-15-2006
8.00
Match drilled floor panels
Details
       

 04-14-2006
3.00
Hung the engine
Details
       

 04-10-2006
0.00
Visit to Sun N Fun 2006
Details
       

 03-30-2006
0.00
Doorlatch with lock
Details
       

 03-28-2006
6.00
Finished riveting tailcone to mid fuse
Details
       

 03-26-2006
4.00
Fitted landing gear mount
Details
       

 03-25-2006
7.00
Joined tail and mid fuse
Details
       

 03-21-2006
7.00
Separated tail cone again
Details
       

 03-20-2006
4.00
Cleco'd and match drilled
Details
       

 03-19-2006
1.00
Joined empenage and mid fuse
Details
       

 03-18-2006
0.00
Samu got CHAMPION !!
Details
       

 03-14-2006
7.00
Riveting lower mid fuse, 550 hours scored
Details
       

 03-13-2006
0.00
Vakkanjer wedstrijden starten!
Details

 03-13-2006
2.00
Empenage fairing trimmed
Details
       

 03-12-2006
2.00
Fitted elevator trim hinges
Details
       

 03-11-2006
5.00
Riveted mid fuse skins
Details
       

 03-09-2006
8.00
Riveted mid fuse skins partly
Details
       

 03-08-2006
5.00
Riveted page 29-16 parts
Details
       

 03-07-2006
2.00
Primed all section 29 Mid Fuse parts
Details
       

 03-06-2006
10.00
Prepared all section 29 parts
Details
       

 02-21-2006
9.00
Deburring, dimpling, deburring, etc..500 hours!
Details
       

 02-19-2006
1.00
Deburring, dimpling
Details
       

 02-18-2006
4.00
Match drilled skins and longerons
Details
       

 02-14-2006
10.00
Match drilled skins and longerons
Details
       

 02-07-2006
7.00
Twisted longerons and cleco'd skins
Details
       

 02-06-2006
1.00
Rolled first skin
Details
       

 02-05-2006
6.00
Assembling seat supprts
Details
       

 02-04-2006
6.00
Riveting bottom skins
Details
       

 02-04-2006
0.00
Fit check
Details
       

 02-02-2006
3.00
Match drilled forward and aft fuse
Details
       

 01-31-2006
11.00
Riveting forward fuse
Details
       

 01-31-2006
0.00
Joined forward and aft fuse
Details
       

 01-31-2006
1.00
Elevator trim assy
Details
       

 01-30-2006
3.00
Priming forward fuse parts
Details
       

 01-29-2006
3.00
Match drilled empennage fairing
Details
       

 01-29-2006
0.00
Flight to Belgium
Details
       

 01-28-2006
5.00
Rigging and match drilling
Details
       

 01-28-2006
0.00
Jan@work
Details
     

 01-27-2006
2.00
Prepared for primer
Details

 01-24-2006
7.00
Disassembled, deburred and dimpled
Details
       

 01-17-2006
7.00
Match drilling fwd fuse
Details
       

 01-16-2006
2.00
Match drilling and deburring
Details
       

 01-14-2006
2.00
Started deburring FWD fuse ribs
Details
       

 01-14-2006
0.00
PH-VIN has a new engine!
Details
       

 01-14-2006
3.00
Finished firewall
Details
       

 01-11-2006
4.00
Riveted firewall sub assemblies
Details
       

 01-11-2006
2.00
Reorganised workshop
Details
       

 01-10-2006
7.00
Riveting bottom skins, past 400 hours today
Details
       

 01-09-2006
2.00
Spacers for elevator horns
Details
       

 01-06-2006
4.00
Riveting Mid fuse ribs
Details
       

 01-04-2006
1.00
Riveting Mid Fuse ribs
Details
       

 01-03-2006
9.00
Riveted first parts Mid Fuse Ribs
Details
       

 01-02-2006
3.00
Primed mid fuse and firewall parts
Details
       

 01-01-2006
3.00
Dimpling and countersinking firewall parts
Details

 12-31-2005
6.00
Dimpling and deburring mid fuse ribs & skins
Details
       

 12-29-2005
2.00
Disassembling, dimpling and deburring
Details
       

 12-28-2005
0.00
PH-VIN for stay
Details
       

 12-28-2005
9.00
Match drilled and deburred skins
Details
       

 12-25-2005
2.00
Cleco'd firewall
Details
       

 12-24-2005
2.00
Match drilled all horizontal holes (350 hour mark)
Details
       

 12-23-2005
6.00
Assembled total of Mid fuse ribs
Details
       

 12-22-2005
4.00
Deburred and match drilled parts
Details
       

 12-21-2005
4.00
Preparing mid fuse parts
Details
       

 12-17-2005
4.00
Tailcone completed
Details
       

 12-14-2005
10.00
Riveting tail cone
Details
       

 12-11-2005
5.00
Riveting tail cone
Details
       

 12-09-2005
0.00
Samu door naar nationale wedstrijden
Details
       

 12-07-2005
2.00
Corrected F-1056 rudder stop brace
Details
       

 12-03-2005
35.00
Riveted mid section bulkeads
Details
       

 12-01-2005
3.00
Riveted aft mid section bulkhead (275 hour mark)
Details
       

 11-30-2005
9.00
Assembling tail cone
Details
       

 11-29-2005
5.00
Priming tailcone and center section parts
Details
       

 11-29-2005
3.00
Match drilling and deburring
Details

 11-28-2005
4.00
Priming tailcone parts
Details
       

 11-26-2005
3.00
cleco'd and match drilled bulkheads
Details
       

 11-25-2005
1.00
Started mid fuse bulkheads
Details
     

 11-24-2005
3.00
Deburring and dimpling skins
Details
       

 11-22-2005
7.00
Deburring and dimpling
Details
       

 11-21-2005
3.00
Dissassembled tail cone
Details
       

 11-19-2005
6.00
Match drilled tailcone
Details
       

 11-18-2005
4.00
Match drilled tail cone
Details
       

 11-16-2005
1.00
Match drilled tail cone (partly)
Details
       

 11-15-2005
7.00
Assembled tail cone and match drilled
Details
       

 11-14-2005
4.00
Deburred and cleco'd tailcone
Details
       

 11-13-2005
7.00
Finished elevators and trim tabs
Details
       

 11-05-2005
9.00
Left fuel tank (Total of 200 hours reached today)
Details
       

 11-03-2005
4.00
Sealing and riveting right fuel tank
Details
       

 11-02-2005
5.00
Sealing and riveting right tank
Details
       

 11-01-2005
5.00
Riveted tank skin stiffeners
Details
       

 10-31-2005
6.00
Deburring and dimpling fuel tank parts
Details
       

 10-28-2005
2.00
Deburring fuel tank parts
Details

 10-27-2005
2.00
Disassembled fuel tanks
Details
       

 10-27-2005
3.00
Bonded trailing edges
Details
       

 10-26-2005
6.00
Riveting elevators
Details
       

 10-25-2005
2.00
Ribs to skin riveting
Details
       

 10-22-2005
2.00
Temporary fit of vertical stab and rudder
Details
     

 10-22-2005
4.00
Riveting elevator parts
Details
       

 10-22-2005
0.00
Preflight fit check
Details
       

 10-17-2005
4.00
Primed elevetor and tank parts
Details
       

 10-11-2005
5.00
Match drilled fuel tanks
Details
       

 10-10-2005
4.00
Started assembling fuel tanks
Details
       

 09-26-2005
2.00
Finished dimpling and deburring elevator parts

 09-23-2005
3.00
Deburring and dimpling common elevator parts

 09-22-2005
2.00
Finished vertical stabiliser
Details
       

 09-22-2005
2.00
Disassembing, deburring and dimpling
Details
       

 09-21-2005
2.00
Deburring and dimpling elevator top skins
Details

 09-14-2005
4.00
Inventory and storage of parts
Details
       

 09-13-2005
4.00
Inventory and storage of parts
Details
       

 09-12-2005
3.00
Inventory fuselage kit
Details
       

 09-11-2005
2.00
Inventory of FFW and Finishing kit.
       

 09-09-2005
1.00
Uncrating the rest.
       

 09-09-2005
1.00
Uncrating the engine!
       

 09-09-2005
1.00
Uncrating and making a mess of my workshop!
       

 09-09-2005
1.00
Uncrating
       

 09-09-2005
1.00
Clean up the mess
       

 09-09-2005
1.00
Arrival Wing Kit / Aankomst Vleugelpakket.
       

 09-09-2005
1.00
Arrival fuselage kit / Aankomst romp kit
Details
       

 09-09-2005
1.00
Arrival Finishing kit, engine and propeller.
       

 09-06-2005
3.00
Riveting rudder / klinken van richtingroer
Details
       

 09-06-2005
2.00
Finishing rudder / afmaken richtingroer
Details
       

 09-05-2005
1.00
Sealing rudder trailing edge / verlijmen achterlij
Details
       

 09-02-2005
2.00
Bulkhead parts and deburring / Rompspanten
       

 09-01-2005
0.00
Starting with tail cone / begin staartdeel
Details
       

 09-01-2005
6.00
Final drilling elevators / opboren hoogteroeren
Details
       

 08-31-2005
1.00
Clecoing elevators / clecoen hoogteroeren
Details
       

 08-21-2005
4.00
Riveting vertical stab skin (partly)
Details
       

 08-21-2005
3.00
Riveting vertical stab skeleton
Details
       

 07-09-2005
3.00
Elevators
Details
       

 07-07-2005
0.00
Separating ribs
Details

 06-08-2005
3.00
Riveting skins and rear spar
Details
       

 06-08-2005
3.00
Riveting skins and rear spar
Details
       

 06-07-2005
1.00
Riveting spars and stringers
Details

 06-06-2005
3.00
Riveting ribs and stringers
Details
       

 06-05-2005
3.00
Rudder assembly
Details
       

 06-05-2005
2.00
Riveting spars
Details
       

 06-04-2005
8.00
Priming
Details
       

 06-03-2005
1.00
Rudder assembly
Details

 06-03-2005
2.00
Finishing parts
Details

 06-02-2005
3.00
Finishing parts
Details

 05-29-2005
3.00
Finishing parts
Details

 05-28-2005
2.00
Finishing parts
Details

 05-27-2005
9.00
Cutting ribs, stringers etc.
Details

 05-26-2005
7.00
Final drilling and deburring
Details
     

 05-25-2005
2.00
Rudder assembly
Details

 05-25-2005
1.00
Finalising vertical stab
Details
       

 05-24-2005
2.00
Rudder assembly
Details

 05-24-2005
1.00
Final drilling and fitting Vertical stabiliser.
Details
     

 05-23-2005
1.00
Vertical stabiliser
Details
       

 05-21-2005
7.00
Official start building
Details
       

 03-13-2005
1.00
Inventory empennage kit
Details
       

 03-08-2005
0.00
Arrival empennage kit
Details
       