KitLog pro

Powered By Kitlog Pro v2.0

Edwards RV-8 Web Site

Builder:
Edward A. Gormley
Location:
New Boston, NH - USA
Aircraft:
Vans Aircraft - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
75 Hours

I've always wanted to build my own airplane, and the RV-8 is what I've always pictured in my mind. I'm currenly building it in the basement of my home but hope to build a workshop attached to the garage when the wings are completed.

Recent Activity
 Date Hours Work Log Summary Details
 01-30-2011
1.5
Dimple And Countersink Left Elevator
Details

 01-21-2011
0.7
Prep Elevaror
Details

 01-18-2011
0.4
Completed Drilling Of Elevator Skin
Details
     

 01-15-2011
1.0
Preparing The Left Elevator
Details
       

 01-15-2011
0.8
Installed Counterblanace In Right Elevator And Beg
Details
     

 01-14-2011
2.0
Torqued Horizontal Stabilizer Bolts And Riveted Ri
Details
     

 01-12-2011
0.6
Riveting Right Elevator
Details
       

 01-10-2011
0.8
Began Riveting Right Elevator
Details
       

 01-09-2011
1.2
Primed Right Elevator
Details
       

 01-08-2011
1.2
Debur And Dimple Right Elevator
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.