KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site

Builder:
Dave Conwell
Location:
Peru, IN - USA
Aircraft:
Sonex Aircraft, LLC - Sonex Aerovee Tri-gear
Manufacturer:   
http://www.sonexaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
1085 Hours

Welcome to my experimental aircraft Web site.

Recent Activity
 Date Hours Work Log Summary Details
 02-19-2018
1.0
Shortened The Fuel Tank Straps.
Details
     

 02-18-2018
2.0
Josh Taylor Fastens The Glareshield, Fuel Straps A
Details
     

 02-16-2018
2.3
Fuel Tank Pressure Test.
Details
       

 02-04-2018
2.5
Put Together The Braided Fuel Line And AN6 Compres
Details
     

 02-03-2018
1.0
Clecoed Storage Compartment Into Position.
Details
       

 02-02-2018
3.5
Designed And Built A Storage Compartment In The Ba
Details
       

 01-30-2018
4.0
Build A Cover Around The Elevator Push Pull Tube.
Details
     

 01-23-2018
2.3
Install A Shelf For The Emergency Transponder.
Details
     

 01-18-2018
5.0
Work On Various Wiring Of Switches And Breakers.
Details
       

 01-15-2018
3.3
Install Firewall Pass-through
Details
       










Copyright © 2001-2018 Matronics. All Rights Reserved.