KitLog pro

Powered By Kitlog Pro v2.0

MICHAEL'S WEB SITE

Builder:
Michael Barnes
Location:
Salem, OR - USA
Aircraft:
Vans - RV-8
Manufacturer:   
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
27 Hours

Welcome to my experimental aircraft Web site.

Recent Activity
 Date Hours Work Log Summary Details
 05-13-2018
0.5
Dimple The Understructure.
Details

 05-13-2018
0.8
Deburr Horizontal Stabilizer.
Details

 05-12-2018
3.0
Deburr Horizontal Stabilizer.
Details

 05-05-2018
0.8
Deburr Horizontal Stabilizer.
Details

 02-12-2018
0.5
Drill / Match Drill To Final Size All The Holes At
Details
       

 02-12-2018
0.3
Cleco On The VS-801PP / VS-901 Skin.
Details
       

 01-28-2018
0.3
Prepare Ribs And Spars Parts.
Details
       

 01-28-2018
0.3
Final Drill Spar Doubler And Hinge Brackets To Rea
Details
       

 01-28-2018
0.1
Final Drill All Rib To Spar Attach Points.
Details
       

 01-28-2018
0.1
Drill Holes In Hinge Brackets.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.