Powered By Kitlog Pro v2.0
Ivans RV 10
Builder:
Ivan Truyaert
Location:
New Carlisle, In - USA
Aircraft:
Van's Aircraft, Inc. - RV10
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
520 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
02-12-2009
1.5
Empennage Fairing
Details
01-29-2009
4.0
Rear Seat Back Completion
Details
01-22-2009
1.5
Rear Headphone Jacks.
Details
01-14-2009
1.5
Finished Fitting Tunnel Covers.
Details
01-05-2009
2.0
Finish Baggage Door
Details
12-30-2008
2.5
Baggage Door Install
Details
12-27-2008
3.1
Finish Baggage Corrugation Prep.
Details
12-24-2008
0.7
Rivet Baggage Cover
Details
12-23-2008
0.3
Tailcone Top Skin
Details
12-23-2008
0.5
Rivet Nutplates To Baggage Floors
Details
SITE NAVIGATION
RV10 Home
Category
# Logs
# Hours
All
273
519
Aileron Actuation
5
12
Ailerons
1
2
Auto Pilot
3
5
Baggage Area
1
1
Baggage Door
2
4
Elevator
32
79
Empennage Attach
17
24
Fairings
11
16
Flaps
2
0
Fuselage
46
69
Horizontal Stabilize
23
56
Inventory
1
3
Miscellaneous
3
3
Rudder
13
28
Rudder and Brake Ped
4
9
Tailcone
44
79
Tailcone Attach
4
14
Vertical Stabilizer
12
22
Wing Tips
7
19
Wings
29
56
Wiring
13
18
Copyright © 2001-2024 Matronics. All Rights Reserved.