KitLog pro

Powered By Kitlog Pro v2.0

Bearhawk #982

Builder:
Chris Silver
Location:
Hartselle, AL - USA
Aircraft:
scratch built - Bearhawk
Engine:
-
Prop:
-
Total Build Time:
146 Hours

Project Update: October 2008

Things appear to be back on track with the project. Honey-do's are currently out of the way and the other projects that I wanted/needed done are put to bed too.

State Of The Project:
-Nose, Center, Aileron, Flap, and Tip Ribs formed to final shape
-ALL other Rib Blanks routed to final size
-All jigs required to form Ribs are complete

Next steps include:
-Smooth/shape remaining rib blanks
-stiffener angles
-Alodine and prime

So, looking at this list, all I lack is finishing up! ;-)

-Chris Silver



Recent Activity
 Date Hours Work Log Summary Details
 10-26-2008
2.0
Flap Nose Rib Smoothing And Forming
Details
     

 10-25-2008
2.0
Flap Nose Rib Smoothing
Details

 10-24-2008
2.0
Aileron Pocket Ribs + Joggles
Details
       

 10-24-2008
0.8
Aileron Nose Rib Balance Tube Hole Drilled
       

 10-23-2008
0.5
Aileron Pocket Rib Smoothing
Details

 10-22-2008
1.8
Aileron Nose Ribs
Details

 10-21-2008
0.0
My Formblock System - A How To (part 5)
Details

 10-21-2008
0.0
My Formblock System - A How To (part 4)
Details

 10-21-2008
0.0
My Formblock System - A How To (part 3)
Details

 10-21-2008
0.0
My Formblock System - A How To (part 2)
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.