Builder:
  Patrick Kelley
Location:
  Flagstaff, AZ - USA
Aircraft:
  RV-10
Total Build Hours:
  1918
Web Site:
  http://www.mykitlog.com/flion/

Date:  10-16-2017
Number of Hours:  0.00
Short Description:  Lift failure and damage

I had pulled the RV-6A out of the hangar and was lowering the -10 to work on it when the jack screw mechanism failed, dropping the lift yoke and fuselage to the floor from about 3 or 4 feet. At first glance, the airframe was intact but a closer inspection showed that the side and bottom skins were wrinkled just aft of the mains and spar. The structure itself looks Ok but I won't know for sure until the skins are off - which means removing the top and tail cone, as well as the engine and instrument panel, as well as the floors and seat pans. I won't trust a lift again, so I'm on the waiting list for a hangar for the -6A and it looks like I'll be working backwards on the -10 for a bit.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Adam Grosser
RV-7A
03-28
796
Jean Gosselin
RV6
03-28
2561
Andrey Piskarev
Highlander
03-27
3733
Chuck Bennett
Sonex-B Tri-Gear
03-27
1088
Sven Hollenbeck
RV-8
03-27
59
Barry Wawrin
RV14A-QB
03-26
2359
Bob Corriveau
RV-8
03-25
4105
Bob Grantham
SeaRey LSX - "Spirit of Mackenzie"
03-25
2034
Des Howson
Sling 2 Taildragger
03-25
3606
Johann
TSI
03-24
868
Peter Calley
Sling4
03-23
2299
Edward Beam
RV-14A
03-22
1304
Jack Clark
RV-14A
03-22
604
Jim Novak
RV-8
03-22
3136
Gary Smith
RV-10
03-18
2842
Tony Batchelar
RV6
03-17
6
Alex KOLLEP
Sportsman 2+2
03-15
1656
James Chadwick
RV-7
03-14
748
Michael Sausen
RV-10
03-12
1460
Wendell Engelien
RV-6A
03-12
2349
JAMES TRAYNOR
VELOCITY- XLRG
03-11
2528
Andrew Duff
Nexus Mustang
03-09
2943
Mark Johnson
RV-10
03-09
487
Marlin Sander
RV-7A
03-05
5630
Peter McBain
RV-9A
03-03
2110
Michael Smith
RV-7
02-29
691
Daniel Moreno
DR 107 ONE DESIGN
02-26
3694
Stephen Satava
RV-7
02-26
2670
James Roberts
RV8
02-25
592
Darrel Watson
H-5
02-24
435

Projects Uploaded: 1549
Logs Uploaded: 283744








Copyright © 2001-2024 Matronics. All Rights Reserved. Privacy Policy.