Builder:
  Franklin Gaxiola
Location:
  , -
Aircraft:
  RV-12iS B
Total Build Hours:
  2583
Web Site:
  http://www.mykitlog.com/gaaerospace/

Date:  09-20-2018
Number of Hours:  6.66
Short Description:  21iS/U-05

09/19/18: 6.66 Hrs
F-01206F-2 was dimpled #40 in only one set of nutplate holes.
F-01206F-2 was riveted to F-1206J L&R.
F-01206F-2 was riveted to F-01206A-1 only in two places, the manugactured head goes on the flange of F-01206F-2.
The bearing bracket assemblies were riveted to F-1206G L&R and to F-1206J L&R.
Riveted a nutplate to F-1206F-2.
F-1250 were separated.
F-1250 L&R were riveted to F-1220A and F-1220B.
F-01219-1 were separated

(1-10 minus 9)

09/20/18: ???
9,11,12
Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Franklin Gaxiola
RV-12iS B
09-20
109
Andrey Piskarev
Highlander
09-19
141
Chris King
Fokker D.VII
09-19
506
DOUG WEHRLY
Sling 2
09-19
520
Douglas Kupersmith
Zodiac 650 B
09-18
1183
John McGlynn
S-19
09-18
1
Larry Rhoads
Sopwith Baby
09-18
1258
Peter Calley
Sling4
09-18
1678
Steve Shae
S-20 Raven
09-18
1022
Brett Holland
SS7
09-17
764
Darrel Watson
S7 Super Sport
09-17
803
Doug Malloy
CH 750 Cruzer
09-17
710
Larry Ward
650
09-17
1354
Mark Johnson
RV-12
09-17
1190
Phil Risley
RV9
09-17
106
Jim Novak
RV-8
09-16
1716
Kurt Haller
Vans RV-9A
09-16
2760
Peter McBain
RV-9A
09-16
764
Steven Lynn
RV-7A
09-16
1635
Dan Beadle
RV8 N14DB
09-15
1154
Darren Fern
RV8
09-15
484
David Macdonald
RV-10
09-15
1918
Robert Cunningham
Series 7 Super Sport
09-15
875
Samuel Larson
Ch701
09-15
42
Thomas Hudgins & Carroll Drake
Ridge Runner 3
09-15
262
Wesley VanDyke
RV-8
09-15
932
David Lewis
RV10
09-14
1779
Gary Smith
RV-10
09-14
835
Nathan Mullins
Long Ez
09-14
5206
Brendon Van Thomme
RV-10
09-13
1358

Projects Uploaded: 1413
Logs Uploaded: 239229








Copyright © 2001-2018 Matronics. All Rights Reserved. Privacy Policy.