Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Adam
Location:
  Medford, MA - USA
Aircraft:
  CH750 Cruzer
Total Build Hours:
  82
Web Site:
  http://www.mykitlog.com/acutler1001/

Date:  08-12-2018
Number of Hours:  2.00
Short Description:  Right wing skeleton riveting

Dan had previously drilled out the ribs for the right wing, so I was able to cleco them for a final fit and assemble. I started by painting the spar and the rib flanges with the Zn-Cr for corrosion protection. Once that dried I reassembled the skeleton and riveted the skeleton together.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Darren Fern
RV8
08-20
368
James Anderson
ES
08-20
3152
Kurt Haller
Vans RV-9A
08-20
2728
Norris Brown
RV10
08-20
416
Samuel Larson
Ch701
08-20
9
Steven Bray
CH750 Cruzer
08-20
1417
Thomas Hudgins & Carroll Drake
Ridge Runner 3
08-20
247
Chuck Mut
T-51D Mustang
08-19
163
DOUG WEHRLY
Sling 2
08-19
461
Jay Johnson
CH-750 Cruzer
08-19
485
Larry Rhoads
Sopwith Baby
08-19
1171
Mark Johnson
RV-12
08-19
1174
Peter Calley
Sling4
08-19
1653
Peter Dailey
Xenos-B
08-19
1019
Peter McBain
RV-9A
08-19
713
Robert Cunningham
Series 7 Super Sport
08-19
823
Sean Smith
CX-5
08-19
128
Uri Sitnik
legal eagle xl
08-19
139
Andrey Piskarev
Highlander
08-18
39
Andrey Piskarev
Highlander
08-18
310
Brett Holland
SS7
08-18
744
Chris King
Fokker D.VII
08-18
459
Dan Beadle
RV8 N14DB
08-18
1138
Doug Malloy
CH 750 Cruzer
08-18
672
Jim Novak
RV-8
08-18
1700
Paul Bonorden
RV-6A
08-18
1690
Randy Doughty
CH750 Cruzer
08-18
266
Darrel Watson
S7 Super Sport
08-17
783
David Hutchinson
RV-10
08-17
110
David Lewis
RV10
08-17
1714

Projects Uploaded: 1409
Logs Uploaded: 238681








Copyright © 2001-2018 Matronics. All Rights Reserved. Privacy Policy.