Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Adam
Location:
  Medford, MA - USA
Aircraft:
  CH750 Cruzer
Total Build Hours:
  34
Web Site:
  http://www.mykitlog.com/acutler1001/

Date:  05-06-2018
Number of Hours:  5.50
Short Description:  Drilling out bottom skins and starting on strut fi

Finished clecoing in place the bottom skins and bottom half of the nose skins for the left wing. Drilled out all of the ribs and then drilled out the spar. My dad started working on the strut fitting - found some spare nuts to bolt on the fitting to the spar temporarily and clecoed the angle onto the bottom skin and started to get everything fit for the doubler. That part got stalled since we need a long drill bit to start the holes for the doubler to rivet to the angle. Next steps will be to deburr the skins and start riveting the bottom skin, potentially going to need to cut out the hole for the landing light before riveting the nose skin.















Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
David Lewis
RV10
05-25
1594
John Steere
Panther
05-25
1961
Nathan Mullins
Long Ez
05-25
5109
Peter McBain
RV-9A
05-25
595
Stuart Hutchison
F1 Rocket Sport Wing VH-FLY
05-25
3083
David LeFrancois
Cozy MKIV
05-24
601
Doug Malloy
CH 750 Cruzer
05-24
584
DOUG WEHRLY
Sling 2
05-24
268
Larry Rhoads
Sopwith Baby
05-24
929
steven pofahl
RV9A
05-24
1537
Donald Morrisey
CH 750 CruZer
05-23
400
Martin Filiatrault
RV-8
05-23
1117
Robert Cunningham
Series 7 Super Sport
05-23
647
Wade Marcantonio
Mako
05-23
325
Wesley VanDyke
RV-8
05-23
770
Chris Moon
RV-14A
05-22
2051
Darrel Watson
S7 Super Sport
05-22
735
Jay Johnson
CH-750 Cruzer
05-22
287
Chris Cook
RV-8
05-21
2294
Paul Minelga
Bearhawk
05-21
1788
Robert Brooks
RV-7
05-21
2200
Andrew Caldwell
RV-8
05-20
12
Chris King
Fokker D.VII
05-20
365
Mark Jackson
RV-8
05-20
938
Mark Johnson
RV-12
05-20
1139
Peter Calley
Sling4
05-20
1639
Peter Keast
CH650B
05-20
115
Steven Lynn
RV-7A
05-20
1576
Jim Novak
RV-8
05-19
1656
Rich Tomanio
RV-8
05-19
86

Projects Uploaded: 1393
Logs Uploaded: 235925








Copyright © 2001-2018 Matronics. All Rights Reserved. Privacy Policy.