Home
Builder Search
Builder Login
KitLog.com    

RECENT ACTIVITY

Previous Builder          Next Builder

Builder:
  Gregory Marlow
Location:
  Telford, TN - USA
Aircraft:
  Bearhawk 4
Total Build Hours:
  437
Web Site:
  http://www.mykitlog.com/GMBearhawk/

Date:  03-05-2017
Number of Hours:  7.50
Short Description:  Left Elevator

Put some of the correct hardware onto the fuselage in between glue coats, so while it dried, I was productive. Anyway, using the oratex system. First, you lay the piece down, cut way oversized, mark the glue segments and then apply glue to both the frame and the fabric. Let the glue dry and then start attaching the fabric, stretching as much as possible while attaching with the iron, set at about 130 degrees c. Just attaching at a few points, so stretching and adjustments can be made. Then, go back with the hot air gun set at about 330 degrees f, to stretch and attach all the way around. I made some little u shaped pieces to attach to the fabric around the hinges, for a cleaner line. Then set the hot air gun at 480 and shrink. Thats one side, next time, I'll do the other. Then it has to have rib lacing done and finally, edge tape on top of that, and around the trailing edges.




One side...





prepped for glue

Previous Builder          Next Builder




 Recent Builder Activity
Builder Project Date Hours
Bob Corriveau
RV-8
04-24
4168
Jean Gosselin
RV6
04-24
2669
Michael Smith
RV-7
04-24
696
Adam Grosser
RV-7A
04-23
825
Andrey Piskarev
Highlander
04-23
3812
Bob Grantham
SeaRey LSX - "Spirit of Mackenzie"
04-23
2046
Michael Sausen
RV-10
04-22
1513
Chuck Bennett
Sonex-B Tri-Gear
04-21
1152
Johann
TSI
04-21
914
Mark Johnson
RV-10
04-20
490
Barry Wawrin
RV14A-QB
04-19
2379
Paul Minelga
Bearhawk
04-17
4222
Jim Novak
RV-8
04-14
3159
Peter McBain
RV-9A
04-13
2120
Darrel Watson
H-5
04-12
457
Peter Calley
Sling4
04-11
2305
Sven Hollenbeck
RV-8
04-08
70
Wendell Engelien
RV-6A
04-04
2354
Mark Spedding
COZY MK IV
04-01
3463
John McGlynn
S-19
03-30
346
Des Howson
Sling 2 Taildragger
03-25
3606
Marlin Sander
RV-7A
03-25
5652
Edward Beam
RV-14A
03-22
1304
Gary Smith
RV-10
03-22
2863
Jack Clark
RV-14A
03-22
604
Tony Batchelar
RV6
03-17
6
Alex KOLLEP
Sportsman 2+2
03-15
1656
James Chadwick
RV-7
03-14
748
JAMES TRAYNOR
VELOCITY- XLRG
03-11
2528
Andrew Duff
Nexus Mustang
03-09
2943

Projects Uploaded: 1549
Logs Uploaded: 283983








Copyright © 2001-2024 Matronics. All Rights Reserved. Privacy Policy.