Powered By Kitlog Pro v2.0
Waynes RV8 Project
Builder:
Wayne Deer
Location:
Lansdowne, VA - USA
Aircraft:
Vans Aircraft - RV8
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
313 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
10-28-2010
5.0
Acid Etched And Alodine Ribs 8 - 14. Primed All.
10-27-2010
3.5
Acid Etched And Alodined Ribs 1-7
10-22-2010
1.2
Removed Ribs From Right Wing And Deburred.
10-22-2010
1.4
Drilled Holes In Ribs For Wiring
10-21-2010
0.7
Used Goof-Off To Remove Sticker Residue
10-21-2010
2.3
Put Ribs And Skins On Right Spar And Final Dirlled
Details
10-18-2010
2.4
Final Drilled Ribs To Spar And Deburred.
Details
10-15-2010
1.8
Put Skins On Wing To Check Straightness Of Flutes.
Details
10-14-2010
2.5
Fluted Left Wing Ribs
10-14-2010
1.2
Finished Straightening Flanges
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
242
315
Empennage
3
3
Empennage - Elev.
4
6
Empennage - H Stab
60
84
Empennage - L Elev.
64
48
Empennage - R Elev.
24
37
Empennage - Rudder
40
60
Empennage - V Stab
21
33
Miscellaneous
2
4
Wings
16
19
Wings - L
6
16
Wings - Right
2
5
Copyright © 2001-2024 Matronics. All Rights Reserved.