Powered By Kitlog Pro v2.0
The Redheads RV-7A Build SIte
Builder:
Mike Laurent
Location:
Cypress, Calif - USA
Aircraft:
Vans Aircraft - RV-7A
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
582 Hours
Welcome to The Redhead's experimental aircraft Web site. I hope this log of my work will keep me building on a regular basis and possibly help other builders see how one person approached and (hopefully) solved the problems that arise.
Recent Activity
Date
Hours
Work Log Summary
Details
09-11-2011
3.5
Match Drilling The Flap Upper Skins To The Ribs, S
Details
09-11-2011
3.5
Drilling The Upper Flap Skin
Details
09-10-2011
2.0
Fabricating The Wing Flaps
Details
09-10-2011
2.0
Fabricating The Wing Flaps
Details
09-10-2011
2.0
Fabricating The Wing Flaps
Details
09-10-2011
2.0
Fabricating The Wing Flaps
Details
09-05-2011
3.0
Wing Flap Fabrication And Assembly
Details
09-05-2011
3.0
Fabricating Wing Flap Components
Details
09-05-2011
2.0
Fabricating The Flaps
Details
09-04-2011
3.0
Fabricating Wing Flap Components
Details
SITE NAVIGATION
RV-7A Home
Category
# Logs
# Hours
All
296
582
Empennage
128
254
None
1
0
Wings
167
328
Copyright © 2001-2024 Matronics. All Rights Reserved.