Powered By Kitlog Pro v2.0
BRIAN'S WEB SITE
Builder:
Brian Scarbrough
Location:
Warrenton, VA - USA
Aircraft:
Vans - RV-7
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
101 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
09-27-2022
2.0
Vertical Stabilizer Skin Fitment To The Skeleton
Details
09-19-2022
0.0
Ribs Layed Out After Fluting And Straightening
Details
09-19-2022
0.5
Clecoed On The VS Ribs To The Spars
Details
09-17-2022
0.0
Vertical Stabilizer Fitment/Drilling Cont.
Details
09-17-2022
1.0
Fittting And Drilling The Vertical Stabilizer
Details
09-10-2022
1.0
Empennage Done!!
Details
09-10-2022
2.0
Details
09-10-2022
0.0
Details
09-10-2022
0.5
Details
09-10-2022
0.0
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
88
101
Empennage
79
76
Miscellaneous
6
22
Shop Supplies
2
1
Tools
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.