Powered By Kitlog Pro v2.0
ERIK'S WEB SITE
Builder:
Erik Heller
Location:
Winsted, CT - USA
Aircraft:
Van's Aircraft - RV-7
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
83 Hours
Welcome to my experimental aircraft Web site. I will be (slowly) building the Van's Aircraft RV-7.
Recent Activity
Date
Hours
Work Log Summary
Details
04-04-2010
2.5
Polishing The Vertical Stabilizer
Details
03-31-2010
0.5
Finishing The Vertical Stabilizer
Details
03-19-2010
2.0
Finishing The Vertical Stabilizer
Details
03-16-2010
1.5
Finishing The Vertical Stabilizer
Details
03-15-2010
2.8
Finishing The Horizontal Stabilizer
Details
03-14-2010
1.0
Drilling The Vertical Stabilizer
Details
03-13-2010
2.0
Drilling The Vertical Stabilizer
Details
03-10-2010
1.0
Drilling The Vertical Stabilizer
Details
03-09-2010
1.0
Drilling The Vertical Stabilizer
Details
03-08-2010
1.0
Drilling The Vertical Stabilizer
Details
SITE NAVIGATION
Contact Builder
RV-7 Home
Category
# Logs
# Hours
All
44
83
Empennage
27
55
Miscellaneous
3
Practice
9
18
Shop Supplies
3
10
Tools
2
Copyright © 2001-2024 Matronics. All Rights Reserved.