Powered By Kitlog Pro v2.0
ROBERT'S WEB SITE
Builder:
Robert Eggleston
Location:
Loveland, Colorado - USA
Aircraft:
Vans Aircraft - RV7
Manufacturer:
http://www.vansaircraft.com/
Engine:
-
Prop:
-
Total Build Time:
3191 Hours
Welcome to my Experimental Aircraft Web Site.
Recent Activity
Date
Hours
Work Log Summary
Details
09-09-2021
2.0
Wired Fuel Flow 3 Wire And Connectors
08-06-2021
4.0
Adding Spade Connectors And 27K Resiters Starter S
08-05-2021
4.0
Master /starter SoleoidK-1,P-3, P-1
08-04-2021
5.0
Installed Wires For VAL/Com
08-03-2021
4.0
Wiring Master Relay And Starter Ignetion Switch
08-02-2021
6.0
Drilled Hole's For EIS And Other Devices In Forwal
08-01-2021
5.0
Work On Val/-Com And Val/Nav, GTR-200
07-20-2021
4.0
J-3 L Mag And J-4 R Mag To Starter Switch
07-01-2021
4.0
Wiring Of Altenator And Mag
06-30-2021
3.0
Work On Mag L/R Wiring
Details
SITE NAVIGATION
Contact Builder
RV7 Home
Category
# Logs
# Hours
All
793
5634
After Inspection
1
11
AIR FILTER BOX
14
116
auto pilot
2
17
Avionics
1
78
Brakes
8
32
Canopy
1
282
Cowling
22
234
Electrical
1
129
Empennage
61
490
Engine
24
176
Engine Baffles
39
240
Engine exhaust
1
5
extra parts
1
8
Firewall forward kit
5
91
Firwall forward kit
5
91
Fuselage
293
1663
Lights/strobes
8
64
Miscellaneous
1
31
Panel
8
358
PITOT/STATIC SYSTEM
5
39
Prop
5
23
SPINNER
2
32
Tanks
89
369
Tools
3
12
Wings
186
988
Wiring & connectors
7
55
RV-7 Home
Copyright © 2001-2025 Matronics. All Rights Reserved.